BELUM DITUNJUK
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 31-MMMK/3/2026 |
(PROPELLER) PRASETYA - 25 TB. 2509040287 |
TUG BOAT |
PROPELLER DETAIL |
25-Mar-2026 | 1 | - |
| 2 | 242-LL/3/2026 |
SMM MUTURI VI (FINAL) 2501030506 |
SELF PROP.OIL BARGE |
WELDING TABLE |
25-Mar-2026 | 1 | - |
| 3 | 270-LL/3/2026 |
BATAMFAST 6 1802020335 |
PASSENGER SHIP |
SHAFT BRACKET DETAIL |
26-Mar-2026 | 1 | - |
| 4 | 321-LL/3/2026 |
BHIMA GIRI NUSA (APP. DRAWING) 2504040240 |
LANDING CRAFT |
CONSTRUCTION PROFILE |
31-Mar-2026 | 1 | - |
| 5 | 6-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER |
Multiple Items (5 Gambar) |
01-Apr-2026 | 5 | |
| 5.1 | 6-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | GENERAL ARRANGEMENT |
01-Apr-2026 | 1 | |
| 5.2 | 6-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | ENGINE GIRDER CONSTRUCTION |
01-Apr-2026 | 1 | |
| 5.3 | 6-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | AP CONSTRUCTION |
01-Apr-2026 | 1 | |
| 5.4 | 6-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | PROFILE CONSTRUCTION |
01-Apr-2026 | 1 | |
| 5.5 | 6-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | MIDSHIP CONSTRUCTION |
01-Apr-2026 | 1 | |
| 6 | 19-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP |
Multiple Items (3 Gambar) |
02-Apr-2026 | 3 | |
| 6.1 | 19-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP | ENGINE FOUNDATION |
02-Apr-2026 | 1 | |
| 6.2 | 19-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP | SHELL EXPANSION |
02-Apr-2026 | 1 | |
| 6.3 | 19-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP | BULKHEAD |
02-Apr-2026 | 1 | |
| 7 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE |
Multiple Items (5 Gambar) |
02-Apr-2026 | 5 | |
| 7.1 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE | AFTER AND FOREPEAK CONSTRUCTION |
02-Apr-2026 | 1 | |
| 7.2 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE | TRANSVERSE BULKHEAD |
02-Apr-2026 | 1 | |
| 7.3 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE | SHELL EXPANSION |
02-Apr-2026 | 1 | |
| 7.4 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE | DECK AND BOTTOM PLAN |
02-Apr-2026 | 1 | |
| 7.5 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE | MIDSHIP SECTION |
02-Apr-2026 | 1 | |
| 8 | 11-SC/4/2026 |
MUARA JAWA 01 2502030414 |
CREW BOAT |
FINAL STABILITY BOOKLET |
02-Apr-2026 | 1 | - |
| 9 | 38-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON |
Multiple Items (4 Gambar) |
06-Apr-2026 | 4 | |
| 9.1 | 38-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | PROFILE PLAN |
06-Apr-2026 | 1 | |
| 9.2 | 38-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | BULKHEAD AND TRANSVERSAL SECTION |
06-Apr-2026 | 1 | |
| 9.3 | 38-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | DECK AND BOTTOM PLAN |
06-Apr-2026 | 1 | |
| 9.4 | 38-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | SHELL EXPANSION |
06-Apr-2026 | 1 | |
| 10 | 41-LL/4/2026 |
INDIAN TRANSPORT 2502180079 |
SELF PROP.OIL BARGE |
Multiple Items (5 Gambar) |
06-Apr-2026 | 5 | |
| 10.1 | 41-LL/4/2026 |
INDIAN TRANSPORT 2502180079 |
SELF PROP.OIL BARGE | SKEG CONSTRUCTION |
06-Apr-2026 | 1 | |
| 10.2 | 41-LL/4/2026 |
INDIAN TRANSPORT 2502180079 |
SELF PROP.OIL BARGE | ENGINE FOUNDATION |
06-Apr-2026 | 1 | |
| 10.3 | 41-LL/4/2026 |
INDIAN TRANSPORT 2502180079 |
SELF PROP.OIL BARGE | FORE PEAK CONSTRUCTION |
06-Apr-2026 | 1 | |
| 10.4 | 41-LL/4/2026 |
INDIAN TRANSPORT 2502180079 |
SELF PROP.OIL BARGE | DECK CONSTRUCTION |
06-Apr-2026 | 1 | |
| 10.5 | 41-LL/4/2026 |
INDIAN TRANSPORT 2502180079 |
SELF PROP.OIL BARGE | AFTER PEAK CONSTRUCTION |
06-Apr-2026 | 1 | |
| 11 | 42-SC/4/2026 |
BELANAK 2403050006 |
PASSANGER FERRY |
PROBABILISTIC DAMAGED STABILITY REPORT |
06-Apr-2026 | 1 | - |
| 12 | 47-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP |
CONSTRUCTION PROFILE |
06-Apr-2026 | 1 | - |
| 13 | 34-SC/4/2026 |
SINERGY PANCA SATRIA 2602070002 |
SELF PROP.OIL BARGE |
STABILITY BOOKLET |
06-Apr-2026 | 1 | - |
| 14 | 76-LLBM/4/2026 |
HULL - 035 (FINAL) 2601020008 |
CPO BARGE |
PROFILE PLAN 2-2 |
06-Apr-2026 | 1 | - |
| 15 | 3-LLSS/4/2026 |
H - 918 (CSM) 2405020872 |
CONTAINER BARGE |
CARGO SECURING MANUAL |
06-Apr-2026 | 1 | - |
| 16 | 82-LLBM/4/2026 |
H - 240 (FINAL) 2501021260 |
PONTOON |
Multiple Items (2 Gambar) |
07-Apr-2026 | 2 | |
| 16.1 | 82-LLBM/4/2026 |
H - 240 (FINAL) 2501021260 |
PONTOON | BHD s FRAME SECTION |
07-Apr-2026 | 1 | |
| 16.2 | 82-LLBM/4/2026 |
H - 240 (FINAL) 2501021260 |
PONTOON | STRUCTURAL PROFILE DECK |
07-Apr-2026 | 1 | |
| 17 | 81-LLBM/4/2026 |
H - 918 2401020894 |
CONTAINER BARGE |
Multiple Items (2 Gambar) |
07-Apr-2026 | 2 | |
| 17.1 | 81-LLBM/4/2026 |
H - 918 2401020894 |
CONTAINER BARGE | LASHING DEVICES and STOWAGE PLAN 1-2 |
07-Apr-2026 | 1 | |
| 17.2 | 81-LLBM/4/2026 |
H - 918 2401020894 |
CONTAINER BARGE | LASHING DEVICES and STOWAGE PLAN 2-2 |
07-Apr-2026 | 1 | |
| 18 | 86-LLBM/4/2026 |
H - 840 (FINAL) 2501020907 |
ACCOMODATION BARGE |
ANODE ARRANGEMENT |
07-Apr-2026 | 1 | - |
| 19 | 83-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT |
Multiple Items (4 Gambar) |
08-Apr-2026 | 4 | |
| 19.1 | 83-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | SKEG CONSTRUCTION |
08-Apr-2026 | 1 | |
| 19.2 | 83-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | PROFILE CONSTRUCTION |
08-Apr-2026 | 1 | |
| 19.3 | 83-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | FORE PEAK CONSTRUCTION |
08-Apr-2026 | 1 | |
| 19.4 | 83-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | MIDSHIP SECTION |
08-Apr-2026 | 1 | |
| 20 | 102-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT |
Multiple Items (5 Gambar) |
08-Apr-2026 | 5 | |
| 20.1 | 102-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | ENGINE ROOM LAY OUT |
08-Apr-2026 | 1 | |
| 20.2 | 102-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | FO SYSTEM |
08-Apr-2026 | 1 | |
| 20.3 | 102-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | PROPELLER PLAN |
08-Apr-2026 | 1 | |
| 20.4 | 102-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | EXHAUST PIPE SYSTEM |
08-Apr-2026 | 1 | |
| 20.5 | 102-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | BILGE-GS AND FW SYSTEM |
08-Apr-2026 | 1 | |
| 21 | 104-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT |
Multiple Items (3 Gambar) |
08-Apr-2026 | 3 | |
| 21.1 | 104-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | SW COOLING |
08-Apr-2026 | 1 | |
| 21.2 | 104-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | SHAFTING ARRANGEMENT |
08-Apr-2026 | 1 | |
| 21.3 | 104-MM/4/2026 |
T - 43 / KINGSTON - 777 2401030462 |
TUG BOAT | SHAFTING DETAIL |
08-Apr-2026 | 1 | |
| 22 | 111-MM/4/2026 |
SINAR MARITIM 1 2501140094 |
TUG BOAT |
Multiple Items (3 Gambar) |
08-Apr-2026 | 3 | |
| 22.1 | 111-MM/4/2026 |
SINAR MARITIM 1 2501140094 |
TUG BOAT | SHAFTING ARRANGEMENT |
08-Apr-2026 | 1 | |
| 22.2 | 111-MM/4/2026 |
SINAR MARITIM 1 2501140094 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
08-Apr-2026 | 1 | |
| 22.3 | 111-MM/4/2026 |
SINAR MARITIM 1 2501140094 |
TUG BOAT | SHAFTING DETAIL |
08-Apr-2026 | 1 | |
| 23 | 70-SC/4/2026 |
SAMUDERA KENCANA 2501040313 |
RO-RO PASSENGER SHIP |
PRELIMINARY INTACT STABILITY |
08-Apr-2026 | 1 | - |
| 24 | 81-LL/4/2026 |
RATU ZULAIKHA 2503030341 |
OIL TANKER |
GENERAL ARRANGEMENT |
08-Apr-2026 | 1 | - |
| 25 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (17 Gambar) |
09-Apr-2026 | 17 | |
| 25.1 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 25.2 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 8 OF 8 |
09-Apr-2026 | 1 | |
| 25.3 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | SHELL EXPANSION |
09-Apr-2026 | 1 | |
| 25.4 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 2 OF 8 |
09-Apr-2026 | 1 | |
| 25.5 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 5 OF 5 |
09-Apr-2026 | 1 | |
| 25.6 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 7 OF 8 |
09-Apr-2026 | 1 | |
| 25.7 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 3 OF 5 |
09-Apr-2026 | 1 | |
| 25.8 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 5 OF 8 |
09-Apr-2026 | 1 | |
| 25.9 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 4 OF 5 |
09-Apr-2026 | 1 | |
| 25.10 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 6 OF 8 |
09-Apr-2026 | 1 | |
| 25.11 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT 2 OF 2 |
09-Apr-2026 | 1 | |
| 25.12 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 1 OF 8 |
09-Apr-2026 | 1 | |
| 25.13 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 1 OF 5 |
09-Apr-2026 | 1 | |
| 25.14 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 3 OF 8 |
09-Apr-2026 | 1 | |
| 25.15 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 2 OF 5 |
09-Apr-2026 | 1 | |
| 25.16 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 4 OF 8 |
09-Apr-2026 | 1 | |
| 25.17 | 102-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT 1 OF 2 |
09-Apr-2026 | 1 | |
| 26 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT |
Multiple Items (7 Gambar) |
09-Apr-2026 | 7 | |
| 26.1 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | SW COOLING SYSTEM |
09-Apr-2026 | 1 | |
| 26.2 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | SW AND FW SANITARY SYSTEM |
09-Apr-2026 | 1 | |
| 26.3 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | SHAFTING DETAIL |
09-Apr-2026 | 1 | |
| 26.4 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | FO SYSTEM |
09-Apr-2026 | 1 | |
| 26.5 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | BILGE-GS AND FW SYSTEM |
09-Apr-2026 | 1 | |
| 26.6 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | AIR-FILLING AND SOUNDING PIPE |
09-Apr-2026 | 1 | |
| 26.7 | 139-MM/4/2026 |
T - 44 / KINGSTON - 878 (FINAL) 2501030165 |
TUG BOAT | EXHAUST PIPE SYSTEM |
09-Apr-2026 | 1 | |
| 27 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP |
Multiple Items (8 Gambar) |
09-Apr-2026 | 8 | |
| 27.1 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | shell expansion H87 |
09-Apr-2026 | 1 | |
| 27.2 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Hull Structure Bulkhead Fr0-Fr6 1-4 |
09-Apr-2026 | 1 | |
| 27.3 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Hull Structure Bulkhead Fr15-Fr28 3-4 |
09-Apr-2026 | 1 | |
| 27.4 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Profile and decks 1-2 AL078 |
09-Apr-2026 | 1 | |
| 27.5 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Hull Structure Bulkhead Fr7-Fr14 2-4 |
09-Apr-2026 | 1 | |
| 27.6 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Profile and decks 2-2 AL087 |
09-Apr-2026 | 1 | |
| 27.7 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Hull Structure Bulkhead Fr29-Fr39 4-4 |
09-Apr-2026 | 1 | |
| 27.8 | 87-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | General Arrangement H087-Model |
09-Apr-2026 | 1 | |
| 28 | 69-SCBM/4/2026 |
S 060 2401020343 |
TUG BOAT |
FINAL STABILITY BOOKLET |
09-Apr-2026 | 1 | - |
| 29 | 142-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
09-Apr-2026 | 2 | |
| 29.1 | 142-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | ENGINE ROOM BILGE, BALLAST AND FIRE SYSTEM |
09-Apr-2026 | 1 | |
| 29.2 | 142-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | F.W. & S.W. ENGINE COOLING PIPE SYSTEM |
09-Apr-2026 | 1 | |
| 30 | 101-LL/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER |
ANCHOR |
09-Apr-2026 | 1 | - |
| 31 | 76-SC/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL |
LINES PLAN |
09-Apr-2026 | 1 | - |
| 32 | 90-LL/4/2026 |
FP - 071 (FINAL) 2501020368 |
PASSENGER SHIP |
RUDDER AND RUDDER STOCK |
09-Apr-2026 | 1 | - |
| 33 | 93-LL/4/2026 |
T - 041 (FINAL) 2501020372 |
WORK BOAT |
SHELL EXPANSION |
09-Apr-2026 | 1 | - |
| 34 | 78-SC/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL |
PRELIMINARY INTACT STABILITY BOOKLET |
09-Apr-2026 | 1 | - |
| 35 | 122-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP |
ENGINE ROOM LAYOUT H87 |
09-Apr-2026 | 1 | - |
| 36 | 92-LL/4/2026 |
BERKAH PANDAWA 01 2502030170 |
SELF PROP.OIL BARGE |
GENERAL ARRANGEMENT |
09-Apr-2026 | 1 | - |
| 37 | 128-MM/4/2026 |
FP - 071 (FINAL) 2501020368 |
PASSENGER SHIP |
CO2 SYSTEM |
09-Apr-2026 | 1 | - |
| 38 | 109-LL/4/2026 |
WIRAMAS 2504010107 |
DRY CARGO SHIP |
Multiple Items (4 Gambar) |
10-Apr-2026 | 4 | |
| 38.1 | 109-LL/4/2026 |
WIRAMAS 2504010107 |
DRY CARGO SHIP | GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | |
| 38.2 | 109-LL/4/2026 |
WIRAMAS 2504010107 |
DRY CARGO SHIP | MIDSHIP SECTION |
10-Apr-2026 | 1 | |
| 38.3 | 109-LL/4/2026 |
WIRAMAS 2504010107 |
DRY CARGO SHIP | CONTAINER SHOES FITTING AND REINFORCEMENT |
10-Apr-2026 | 1 | |
| 38.4 | 109-LL/4/2026 |
WIRAMAS 2504010107 |
DRY CARGO SHIP | STOWAGE AND LASHING ARRANGEMENT |
10-Apr-2026 | 1 | |
| 39 | 161-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER |
Multiple Items (3 Gambar) |
10-Apr-2026 | 3 | |
| 39.1 | 161-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | CARGO OIL TRANSFER SYSTEM |
10-Apr-2026 | 1 | |
| 39.2 | 161-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | CO2 PIPING DIAGRAM CO2 |
10-Apr-2026 | 1 | |
| 39.3 | 161-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | GENERAL VENT, SOUNDING & FILLING SYSTEM |
10-Apr-2026 | 1 | |
| 40 | 86-SC/4/2026 |
MDM EXPRESS 9 2001020083 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (2 Gambar) |
10-Apr-2026 | 2 | |
| 40.1 | 86-SC/4/2026 |
MDM EXPRESS 9 2001020083 |
HIGH SPEED PASSANGER VESSEL | FINAL DAMAGE STABILITY BOOKLET |
10-Apr-2026 | 1 | |
| 40.2 | 86-SC/4/2026 |
MDM EXPRESS 9 2001020083 |
HIGH SPEED PASSANGER VESSEL | FINAL INTACT TRIM AND STABILITY BOOKLET |
10-Apr-2026 | 1 | |
| 41 | 112-LL/4/2026 |
BHS 02 2401110051 |
TUG BOAT |
Multiple Items (5 Gambar) |
10-Apr-2026 | 5 | |
| 41.1 | 112-LL/4/2026 |
BHS 02 2401110051 |
TUG BOAT | FORE PEAK CONSTRUCTION |
10-Apr-2026 | 1 | |
| 41.2 | 112-LL/4/2026 |
BHS 02 2401110051 |
TUG BOAT | FRAME SECTION |
10-Apr-2026 | 1 | |
| 41.3 | 112-LL/4/2026 |
BHS 02 2401110051 |
TUG BOAT | CONSTRUCTION PROFILE |
10-Apr-2026 | 1 | |
| 41.4 | 112-LL/4/2026 |
BHS 02 2401110051 |
TUG BOAT | ENGINE BED CONSTRUCTION |
10-Apr-2026 | 1 | |
| 41.5 | 112-LL/4/2026 |
BHS 02 2401110051 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
10-Apr-2026 | 1 | |
| 42 | 116-LL/4/2026 |
PSB SUPPORT 200 2302050036 |
ACCOMODATION WORK BARGE |
ARRANGEMENT OF CRANE PEDESTAL |
10-Apr-2026 | 1 | - |
| 43 | 115-LL/4/2026 |
DSL 12 (FINAL) 2501030497 |
TUG BOAT |
Multiple Items (4 Gambar) |
10-Apr-2026 | 4 | |
| 43.1 | 115-LL/4/2026 |
DSL 12 (FINAL) 2501030497 |
TUG BOAT | SHELL EXPANSION |
10-Apr-2026 | 1 | |
| 43.2 | 115-LL/4/2026 |
DSL 12 (FINAL) 2501030497 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
10-Apr-2026 | 1 | |
| 43.3 | 115-LL/4/2026 |
DSL 12 (FINAL) 2501030497 |
TUG BOAT | WELDING SCHEDULE |
10-Apr-2026 | 1 | |
| 43.4 | 115-LL/4/2026 |
DSL 12 (FINAL) 2501030497 |
TUG BOAT | DOORS AND WINDOWS ARRANGEMENT |
10-Apr-2026 | 1 | |
| 44 | 151-LL/4/2026 |
SYAHDAN EMILIA 01 (FINAL) 2601030001 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
13-Apr-2026 | 3 | |
| 44.1 | 151-LL/4/2026 |
SYAHDAN EMILIA 01 (FINAL) 2601030001 |
SELF PROP.OIL BARGE | MIDSHIP SECTION |
13-Apr-2026 | 1 | |
| 44.2 | 151-LL/4/2026 |
SYAHDAN EMILIA 01 (FINAL) 2601030001 |
SELF PROP.OIL BARGE | ENGINE FOUNDATION |
13-Apr-2026 | 1 | |
| 44.3 | 151-LL/4/2026 |
SYAHDAN EMILIA 01 (FINAL) 2601030001 |
SELF PROP.OIL BARGE | WELDING SCHEDULE |
13-Apr-2026 | 1 | |
| 45 | 153-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 45.1 | 153-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT | DECKHOUSE STRUCTURE PLAN |
13-Apr-2026 | 1 | |
| 45.2 | 153-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT | PROFILE PLAN CONSTRUCTION |
13-Apr-2026 | 1 | |
| 45.3 | 153-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT | CONTAINER-SHOES DETAIL CONSTRUCTION |
13-Apr-2026 | 1 | |
| 45.4 | 153-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 45.5 | 153-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT | DECK AND BOTTOM CONSTRUCTION |
13-Apr-2026 | 1 | |
| 46 | 115-SC/4/2026 |
UBS H - 032 2501030407 |
PONTOON |
FINAL INTACT STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 47 | 127-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 47.1 | 127-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | HATCH COVER |
13-Apr-2026 | 1 | |
| 47.2 | 127-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | STERN FRAME CONSTRUCTION |
13-Apr-2026 | 1 | |
| 47.3 | 127-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 47.4 | 127-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 47.5 | 127-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | RUDDER & RUDDER STOCK |
13-Apr-2026 | 1 | |
| 48 | 184-MM/4/2026 |
PUTRA WAJO 2502010530 |
PASSENGER AND CAR CARRIER |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 48.1 | 184-MM/4/2026 |
PUTRA WAJO 2502010530 |
PASSENGER AND CAR CARRIER | WATER SPRINKLER SYSTEM FOR PASSENGER SPACE |
13-Apr-2026 | 1 | |
| 48.2 | 184-MM/4/2026 |
PUTRA WAJO 2502010530 |
PASSENGER AND CAR CARRIER | SCH DIAGRAM OF CO2 FIRE FIGHTING SYSTEM |
13-Apr-2026 | 1 | |
| 49 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON |
Multiple Items (6 Gambar) |
13-Apr-2026 | 6 | |
| 49.1 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON | WELDING SCHEDULE |
13-Apr-2026 | 1 | |
| 49.2 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON | DECK AND BOTTOM PLAN |
13-Apr-2026 | 1 | |
| 49.3 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 49.4 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON | GENERAL ARRANAGEMENT |
13-Apr-2026 | 1 | |
| 49.5 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON | PROFILE PLAN |
13-Apr-2026 | 1 | |
| 49.6 | 144-LLBM/4/2026 |
H - 2006 2401020480 |
PONTOON | BULKHEAD AND SECTION FRAME |
13-Apr-2026 | 1 | |
| 50 | 105-SC/4/2026 |
PANARUNG 2502030563 |
CREW BOAT |
STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 51 | 137-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE |
GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | - |
| 52 | 186-MM/4/2026 |
NEW ZHIMA 2502010527 |
PASSENGER AND CAR CARRIER |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 52.1 | 186-MM/4/2026 |
NEW ZHIMA 2502010527 |
PASSENGER AND CAR CARRIER | CO2 FIRE FIGHTING SYSTEM |
13-Apr-2026 | 1 | |
| 52.2 | 186-MM/4/2026 |
NEW ZHIMA 2502010527 |
PASSENGER AND CAR CARRIER | WATER SPRINKLER SYSTEM FOR PASSENGER SPACE |
13-Apr-2026 | 1 | |
| 53 | 129-LLBM/4/2026 |
H - 169 (FINAL) 2501021067 |
SELF PROPELLED OIL/CHEMICAL BARGE |
general arrangement |
13-Apr-2026 | 1 | - |
| 54 | 80-ML/4/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (4 Gambar) |
13-Apr-2026 | 4 | |
| 54.1 | 80-ML/4/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | RANGKAIAN DETAIL MAIN SWITCH BOARD AC 380 & 220 / 50HZ |
13-Apr-2026 | 1 | |
| 54.2 | 80-ML/4/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | DB PUMP & FAN BLOWER |
13-Apr-2026 | 1 | |
| 54.3 | 80-ML/4/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | SINGLE LINE DIAGRAM MAIN SWITCH BOARD AC 380V & 220V / 50Hz |
13-Apr-2026 | 1 | |
| 54.4 | 80-ML/4/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | ELECTRIC POWER BALANCE CALCULATION |
13-Apr-2026 | 1 | |
| 55 | 145-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 55.1 | 145-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | TRANSVERSE BULKHEADS |
13-Apr-2026 | 1 | |
| 55.2 | 145-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 55.3 | 145-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | MIDSHIP SECTION |
13-Apr-2026 | 1 | |
| 55.4 | 145-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 55.5 | 145-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | CONSTRUCTION PROFILE |
13-Apr-2026 | 1 | |
| 56 | 147-LL/4/2026 |
T - 2407 2401020718 |
TUG BOAT |
General Arrangement |
13-Apr-2026 | 1 | - |
| 57 | 143-LL/4/2026 |
KAPUAS BAHARI VI 2502140102 |
TUG BOAT |
MAIN ENGINE GIRDER |
13-Apr-2026 | 1 | - |
| 58 | 103-SC/4/2026 |
GOLDEN RAIDER MV. 1702020146 |
PASSENGER SHIP |
GOLDEN RAIDER - DAMAGE STABILITY BOOKLET REV00 |
13-Apr-2026 | 1 | - |
| 59 | 113-SC/4/2026 |
MUARA JAWA 02 2502030415 |
CREW BOAT |
FINAL STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 60 | 107-SC/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 60.1 | 107-SC/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT | STABILITY BOOKLET |
13-Apr-2026 | 1 | |
| 60.2 | 107-SC/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT | TANK CAPACITY PLAN |
13-Apr-2026 | 1 | |
| 61 | 178-MM/4/2026 |
MBM 02 2602040035 |
CREW BOAT |
PIPING SYSTEM |
13-Apr-2026 | 1 | - |
| 62 | 129-LL/4/2026 |
KTU - 2009 FINAL 2501020115 |
OIL BARGE |
FINAL LONGITUDINAL STRENGTH-REV 0 |
13-Apr-2026 | 1 | - |
| 63 | 114-SC/4/2026 |
BB. 044 (DELIVERY) 2401010201 |
PASSANGER FERRY |
FINAL DAMAGE STABILITY |
13-Apr-2026 | 1 | - |
| 64 | 10-SNSEE/4/2026 |
MERATUS KUPANG 2639040045 |
CONTAINER SHIP |
Meratus Kupang - SEEMP Part III |
14-Apr-2026 | 1 | - |
| 65 | 196-MM/4/2026 |
BEN GLORY 2503030521 |
CRANE BARGE |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 65.1 | 196-MM/4/2026 |
BEN GLORY 2503030521 |
CRANE BARGE | EXHAUST GAS PIPING SYSTEM |
14-Apr-2026 | 1 | |
| 65.2 | 196-MM/4/2026 |
BEN GLORY 2503030521 |
CRANE BARGE | SOUNDING AIR AND FILLING PIPE SYSTEM |
14-Apr-2026 | 1 | |
| 66 | 139-SC/4/2026 |
SEA RAIDER II 1802020340 |
PASSENGER SHIP |
INTACT STABILITY BOOKLET |
14-Apr-2026 | 1 | - |
| 67 | 207-MM/4/2026 |
MING ZHOU 65 2502170041 |
BULK CARRIER |
ENGINE ROOM BILGE BALLAST FIRE PIPING DRAWING |
14-Apr-2026 | 1 | - |
| 68 | 97-ML/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 68.1 | 97-ML/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | BALANCE DAYA |
14-Apr-2026 | 1 | |
| 68.2 | 97-ML/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | MAIN SWITCHBOARD |
14-Apr-2026 | 1 | |
| 68.3 | 97-ML/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | WIRING DIAGRAM |
14-Apr-2026 | 1 | |
| 69 | 204-MM/4/2026 |
UVM 08 2504140089 |
TUG BOAT |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 69.1 | 204-MM/4/2026 |
UVM 08 2504140089 |
TUG BOAT | SHAFTING DETAIL |
14-Apr-2026 | 1 | |
| 69.2 | 204-MM/4/2026 |
UVM 08 2504140089 |
TUG BOAT | SHAFTING ARRANGEMENT |
14-Apr-2026 | 1 | |
| 70 | 156-LL/4/2026 |
T - 2408 2401020719 |
TUG BOAT |
General Arrangement |
14-Apr-2026 | 1 | - |
| 71 | 31-LLI/4/2026 |
FINACIA 97 2512140101 |
PONTOON |
Multiple Items (4 Gambar) |
14-Apr-2026 | 4 | |
| 71.1 | 31-LLI/4/2026 |
FINACIA 97 2512140101 |
PONTOON | SHELL EXPANSION |
14-Apr-2026 | 1 | |
| 71.2 | 31-LLI/4/2026 |
FINACIA 97 2512140101 |
PONTOON | GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | |
| 71.3 | 31-LLI/4/2026 |
FINACIA 97 2512140101 |
PONTOON | CONSTRUCTION PLAN |
14-Apr-2026 | 1 | |
| 71.4 | 31-LLI/4/2026 |
FINACIA 97 2512140101 |
PONTOON | MIDSHIP SECTION |
14-Apr-2026 | 1 | |
| 72 | 179-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 72.1 | 179-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | FORE PEAK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 72.2 | 179-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | AFTER PEAK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 72.3 | 179-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | STEM FRAME CONSTRUCTION |
14-Apr-2026 | 1 | |
| 73 | 150-SC/4/2026 |
JIN DE SHENG 2502040294 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 73.1 | 150-SC/4/2026 |
JIN DE SHENG 2502040294 |
GENERAL CARGO | DAMAGE STABILITY |
14-Apr-2026 | 1 | |
| 73.2 | 150-SC/4/2026 |
JIN DE SHENG 2502040294 |
GENERAL CARGO | FINAL STABILITY |
14-Apr-2026 | 1 | |
| 74 | 175-LL/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 74.1 | 175-LL/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | AFTER & FORE PEAK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 74.2 | 175-LL/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | |
| 74.3 | 175-LL/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | RUDDER & RUDDER STOCK |
14-Apr-2026 | 1 | |
| 75 | 189-LL/4/2026 |
JIN DE SHENG 2502040294 |
GENERAL CARGO |
GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | - |
| 76 | 191-MM/4/2026 |
ROCKET 12 (Ex.ARWANA 03) 2502140093 |
SELF PROPELLED CRANE BARGE |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 76.1 | 191-MM/4/2026 |
ROCKET 12 (Ex.ARWANA 03) 2502140093 |
SELF PROPELLED CRANE BARGE | CO2 SYSTEM |
14-Apr-2026 | 1 | |
| 76.2 | 191-MM/4/2026 |
ROCKET 12 (Ex.ARWANA 03) 2502140093 |
SELF PROPELLED CRANE BARGE | BILGE, BALLAST & FIRE SYSTEM |
14-Apr-2026 | 1 | |
| 77 | 103-ML/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 77.1 | 103-ML/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | WIRING DIAGRAM |
14-Apr-2026 | 1 | |
| 77.2 | 103-ML/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | BALANCE DAYA |
14-Apr-2026 | 1 | |
| 77.3 | 103-ML/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | MSB DIAGRAM |
14-Apr-2026 | 1 | |
| 78 | 49-MMBM/4/2026 |
H - 1010 (FINAL) 2601020001 |
TUG BOAT |
GIM-1010-P-02-SCHEMATIC OF COOLING SYSTEM-Layout1 |
14-Apr-2026 | 1 | - |
| 79 | 210-MM/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 79.1 | 210-MM/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | BILGA, G.S. & F.W. SYSTEM |
14-Apr-2026 | 1 | |
| 79.2 | 210-MM/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | SHAFTING ARRANGEMENT |
14-Apr-2026 | 1 | |
| 80 | 188-LL/4/2026 |
BERAS BASAH 2504030500 |
MOORING BOAT |
GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | - |
| 81 | 192-LL/4/2026 |
H414 LCT 14.2 M (DELIVERY) 2501010585 |
LANDING CRAFT |
GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | - |
| 82 | 98-ML/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER |
POWER BALANCE CALCULATION |
14-Apr-2026 | 1 | - |
| 83 | 163-LL/4/2026 |
PRIMA BAHARI 39(FINAL) 2501030328 |
TUG BOAT |
STRUCTURAL FIRE PROTECTION |
14-Apr-2026 | 1 | - |
| 84 | 201-MM/4/2026 |
H414 LCT 14.2 M (DELIVERY) 2501010585 |
LANDING CRAFT |
BILGE GS SYSTEM |
14-Apr-2026 | 1 | - |
| 85 | 161-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT |
GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | - |
| 86 | 197-MM/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP |
SOUNDING FILLING AND AIR PIPE |
14-Apr-2026 | 1 | - |
| 87 | 158-LL/4/2026 |
MP 2 EKS SHUN LI TONG 2502090348 |
BULK CARRIER |
GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | - |
| 88 | 129-SC/4/2026 |
MP 2 EKS SHUN LI TONG 2502090348 |
BULK CARRIER |
FINAL INTACT STABILITY BOOKLET |
14-Apr-2026 | 1 | - |
| 89 | 95-ML/4/2026 |
UVM 08 2504140089 |
TUG BOAT |
MAIN SWITCH BOARD |
14-Apr-2026 | 1 | - |
| 90 | 169-LL/4/2026 |
SMM MUTURI VI (FINAL) 2501030506 |
SELF PROP.OIL BARGE |
CREW DECK CONSTRUCTION |
14-Apr-2026 | 1 | - |
| 91 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT |
Multiple Items (8 Gambar) |
15-Apr-2026 | 8 | |
| 91.1 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | ENGINE ROOM |
15-Apr-2026 | 1 | |
| 91.2 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 91.3 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | EXHAUST GAS SYSTEM |
15-Apr-2026 | 1 | |
| 91.4 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | BILGE AND FIRE SYSTEM |
15-Apr-2026 | 1 | |
| 91.5 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | FO SYSTEM |
15-Apr-2026 | 1 | |
| 91.6 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | STEERING GEAR SYSTEM |
15-Apr-2026 | 1 | |
| 91.7 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | SOUNDING FILLING AND AIR PIPE |
15-Apr-2026 | 1 | |
| 91.8 | 248-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | SW COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 92 | 237-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT |
Multiple Items (4 Gambar) |
15-Apr-2026 | 4 | |
| 92.1 | 237-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 92.2 | 237-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | BILGE GS FW AND FIRE SYSTEM |
15-Apr-2026 | 1 | |
| 92.3 | 237-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | AIR-FILLING AND SOUNDING PIPE |
15-Apr-2026 | 1 | |
| 92.4 | 237-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 93 | 14-SNSEE/4/2026 |
IMS JAKARTA (SEEMP) 2639110006 |
IMS Jakarta - SEEMP Part I |
15-Apr-2026 | 1 | - | |
| 94 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT |
Multiple Items (11 Gambar) |
15-Apr-2026 | 11 | |
| 94.1 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | SKEG CONSTRUCTION |
15-Apr-2026 | 1 | |
| 94.2 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 94.3 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | SUPERSTRUCTURE |
15-Apr-2026 | 1 | |
| 94.4 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | AFTERPEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 94.5 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | MIDSHIP SECTION |
15-Apr-2026 | 1 | |
| 94.6 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | RUDDER AND RUDDER STOCK |
15-Apr-2026 | 1 | |
| 94.7 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | PROFILE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 94.8 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | TRANSVERSAL BULKHEAD |
15-Apr-2026 | 1 | |
| 94.9 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | ENGINE BED FOUNDATION |
15-Apr-2026 | 1 | |
| 94.10 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | FOREPEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 94.11 | 217-LL/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT | BOTTOM CONSTRUCTION |
15-Apr-2026 | 1 | |
| 95 | 116-ML/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 95.1 | 116-ML/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 95.2 | 116-ML/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | MAIN SWITCH BOARD |
15-Apr-2026 | 1 | |
| 96 | 16-SNSEE/4/2026 |
IMS JAKARTA (SEEMP) 2639110006 |
IMS Jakarta - SEEMP Part II |
15-Apr-2026 | 1 | - | |
| 97 | 104-ML/4/2026 |
GOLDEN RAIDER MV. 1702020146 |
PASSENGER SHIP |
Main Switch Board |
15-Apr-2026 | 1 | - |
| 98 | 198-LL/4/2026 |
BEREBES - II 2604030082 |
MOORING BOAT |
GENERAL ARRAGEMENT |
15-Apr-2026 | 1 | - |
| 99 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 99.1 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 99.2 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 99.3 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP | CO2 SYSTEM |
15-Apr-2026 | 1 | |
| 99.4 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP | SEWAGE PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 99.5 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP | PROPELLER |
15-Apr-2026 | 1 | |
| 99.6 | 252-MM/4/2026 |
OCEANNA 13 (PKBL) 2402020930 |
PASSENGER SHIP | EXHAUST GAS SYSTEM |
15-Apr-2026 | 1 | |
| 100 | 122-ML/4/2026 |
H051 (FINAL) 2501120119 |
PATROL BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 100.1 | 122-ML/4/2026 |
H051 (FINAL) 2501120119 |
PATROL BOAT | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 100.2 | 122-ML/4/2026 |
H051 (FINAL) 2501120119 |
PATROL BOAT | GENERAL DIAGRAM OF ELECTRIC SYSTEM |
15-Apr-2026 | 1 | |
| 101 | 123-ML/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT |
WIRING DIAGRAM |
15-Apr-2026 | 1 | - |
| 102 | 13-SNSEE/4/2026 |
IMS BALI (SEEMP) 2639110011 |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | ||
| 102.1 | 13-SNSEE/4/2026 |
IMS BALI (SEEMP) 2639110011 |
IMS Bali - SEEMP Part II |
15-Apr-2026 | 1 | ||
| 102.2 | 13-SNSEE/4/2026 |
IMS BALI (SEEMP) 2639110011 |
IMS Bali - SEEMP Part III |
15-Apr-2026 | 1 | ||
| 103 | 15-SNSEE/4/2026 |
IMS JAKARTA (SEEMP) 2639110006 |
IMS Jakarta - SEEMP Part III |
15-Apr-2026 | 1 | - | |
| 104 | 254-MM/4/2026 |
KAKABUDEDE 391 2502060031 |
TUG BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 104.1 | 254-MM/4/2026 |
KAKABUDEDE 391 2502060031 |
TUG BOAT | BILGE-BALLAST AND FIRE FIGHTING |
15-Apr-2026 | 1 | |
| 104.2 | 254-MM/4/2026 |
KAKABUDEDE 391 2502060031 |
TUG BOAT | SHAFT PROPELLER AND STERN TUBE |
15-Apr-2026 | 1 | |
| 105 | 216-LL/4/2026 |
T - 041 (FINAL) 2501020372 |
WORK BOAT |
ENGINE ROOM PORTABLE PANEL |
15-Apr-2026 | 1 | - |
| 106 | 6-LLSS/4/2026 |
HULL M - 029 (CSM) 2505021445 |
CONTAINER BARGE |
CARGO SECURING MANUAL |
15-Apr-2026 | 1 | - |
| 107 | 196-LL/4/2026 |
H420 LCT 19.9 M (DELIVERY) 2501010583 |
FAST PATROL BOAT |
GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | - |
| 108 | 199-LL/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT |
TOWING HOOK TABLE DETAIL |
15-Apr-2026 | 1 | - |
| 109 | 262-MM/4/2026 |
MPS - 017 (FINAL) 2501020768 |
TUG BOAT |
Multiple Items (2 Gambar) |
16-Apr-2026 | 2 | |
| 109.1 | 262-MM/4/2026 |
MPS - 017 (FINAL) 2501020768 |
TUG BOAT | MPS 017 FUEL OIL SYSTEM |
16-Apr-2026 | 1 | |
| 109.2 | 262-MM/4/2026 |
MPS - 017 (FINAL) 2501020768 |
TUG BOAT | MPS 017 SEA WATER COOLING SYSTEM |
16-Apr-2026 | 1 | |
| 110 | 223-LL/4/2026 |
MP 2809 (FINAL) 2601030071 |
TUG BOAT |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 110.1 | 223-LL/4/2026 |
MP 2809 (FINAL) 2601030071 |
TUG BOAT | MIDSHIP SECTION |
16-Apr-2026 | 1 | |
| 110.2 | 223-LL/4/2026 |
MP 2809 (FINAL) 2601030071 |
TUG BOAT | SHELL EXPANSION |
16-Apr-2026 | 1 | |
| 110.3 | 223-LL/4/2026 |
MP 2809 (FINAL) 2601030071 |
TUG BOAT | PROFILE PLAN |
16-Apr-2026 | 1 | |
| 111 | 239-LL/4/2026 |
BG UNITED JAYA 1601 2401130061 |
BARGE |
WELDING SCHEDULE |
16-Apr-2026 | 1 | - |
| 112 | 232-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
TYPICAL CROSS SECTION |
16-Apr-2026 | 1 | - |
| 113 | 17-SNSEE/4/2026 |
SELATAN DAMAI - SEEMP PART III APPROVAL COC PART III 2639090012 |
Multiple Items (2 Gambar) |
16-Apr-2026 | 2 | ||
| 113.1 | 17-SNSEE/4/2026 |
SELATAN DAMAI - SEEMP PART III APPROVAL COC PART III 2639090012 |
Selatan Damai - SEEMP III |
16-Apr-2026 | 1 | ||
| 113.2 | 17-SNSEE/4/2026 |
SELATAN DAMAI - SEEMP PART III APPROVAL COC PART III 2639090012 |
Selatan Damai - SEEMP III COC |
16-Apr-2026 | 1 | ||
| 114 | 273-MM/4/2026 |
26-5 (FINAL) 2601120027 |
TUG BOAT |
Multiple Items (2 Gambar) |
16-Apr-2026 | 2 | |
| 114.1 | 273-MM/4/2026 |
26-5 (FINAL) 2601120027 |
TUG BOAT | SCHEMATIC BILGE BALLAST AND FIRE MAIN SYSTEM |
16-Apr-2026 | 1 | |
| 114.2 | 273-MM/4/2026 |
26-5 (FINAL) 2601120027 |
TUG BOAT | STEERING GEAR ARRANGEMENT |
16-Apr-2026 | 1 | |
| 115 | 7-LLSS/4/2026 |
HULL M - 025 (CSM) 2504021444 |
CONTAINER BARGE |
CARGO SECURING MANUAL |
16-Apr-2026 | 1 | - |
| 116 | 233-LL/4/2026 |
KAPUAS BAHARI IX 2602140021 |
TUG BOAT |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 116.1 | 233-LL/4/2026 |
KAPUAS BAHARI IX 2602140021 |
TUG BOAT | NOZZLE AND SHAFT BRACKET DETAIL 1 |
16-Apr-2026 | 1 | |
| 116.2 | 233-LL/4/2026 |
KAPUAS BAHARI IX 2602140021 |
TUG BOAT | MAIN ENGINE GIRDER |
16-Apr-2026 | 1 | |
| 116.3 | 233-LL/4/2026 |
KAPUAS BAHARI IX 2602140021 |
TUG BOAT | NOZZLE AND SHAFT BRACKET DETAIL 2 |
16-Apr-2026 | 1 | |
| 117 | 126-ML/4/2026 |
MPS - 017 (FINAL) 2501020768 |
TUG BOAT |
MPS 017 LOAD BALANCE ANALYSIS |
16-Apr-2026 | 1 | - |
| 118 | 172-SC/4/2026 |
DHARMA FERRY - I (APP. DRAWING) 2504040220 |
PASSANGER CAR FERRY |
Multiple Items (2 Gambar) |
16-Apr-2026 | 2 | |
| 118.1 | 172-SC/4/2026 |
DHARMA FERRY - I (APP. DRAWING) 2504040220 |
PASSANGER CAR FERRY | FINAL INTACT STABILITY |
16-Apr-2026 | 1 | |
| 118.2 | 172-SC/4/2026 |
DHARMA FERRY - I (APP. DRAWING) 2504040220 |
PASSANGER CAR FERRY | LINES PLAN |
16-Apr-2026 | 1 | |
| 119 | 277-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
ENGINE ROOM LAYOUT |
16-Apr-2026 | 1 | - |
| 120 | 176-SC/4/2026 |
HULL 125 (FINAL) 2501030132 |
TUG BOAT |
CAPACITY PLAN |
16-Apr-2026 | 1 | - |
| 121 | 256-MM/4/2026 |
TIRTA BAHARI 2604140025 |
TUG BOAT |
LAY OUT ENGINE ROOM |
16-Apr-2026 | 1 | - |
| 122 | 174-LLBM/4/2026 |
H - 001 (FINAL) 2601020187 |
PONTOON |
X-RAY PLAN |
16-Apr-2026 | 1 | - |
| 123 | 124-ML/4/2026 |
PS1-00061 (FINAL) 2501021562 |
TUG BOAT |
SLD PS1-00061 |
16-Apr-2026 | 1 | - |
| 124 | 182-LLBM/4/2026 |
H - 910 (FINAL) 2601020305 |
PONTOON |
NDT PLAN X-RAY TEST 1 OF 3 |
16-Apr-2026 | 1 | - |
| 125 | 177-LLBM/4/2026 |
H - 116 (FINAL) 2601020292 |
PONTOON |
9 H-116A WELDING SCHEDULE |
16-Apr-2026 | 1 | - |
| 126 | 261-LL/4/2026 |
PONTOON KAPAL INDUK 1 (FINAL) 2601120013 |
PONTOON |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 126.1 | 261-LL/4/2026 |
PONTOON KAPAL INDUK 1 (FINAL) 2601120013 |
PONTOON | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 126.2 | 261-LL/4/2026 |
PONTOON KAPAL INDUK 1 (FINAL) 2601120013 |
PONTOON | TRANSVERSE AND LONGITUDINAL BULKHEAD |
17-Apr-2026 | 1 | |
| 126.3 | 261-LL/4/2026 |
PONTOON KAPAL INDUK 1 (FINAL) 2601120013 |
PONTOON | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 126.4 | 261-LL/4/2026 |
PONTOON KAPAL INDUK 1 (FINAL) 2601120013 |
PONTOON | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 127 | 305-MM/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 127.1 | 305-MM/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT | SCH FIRE AND MAIN DECK SYSTEM |
17-Apr-2026 | 1 | |
| 127.2 | 305-MM/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT | SCH FUEL AND OIL SYSTEM |
17-Apr-2026 | 1 | |
| 127.3 | 305-MM/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT | SCH TENK VENT FILLING AND SOUNDING SYSTEM |
17-Apr-2026 | 1 | |
| 127.4 | 305-MM/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT | SCH BILLGE AND BALLAST SYTEM |
17-Apr-2026 | 1 | |
| 128 | 1-SNSTS/4/2026 |
NOVAH - STS PLAN APPROVAL 2639090069 |
Novah - STS Plan |
17-Apr-2026 | 1 | - | |
| 129 | 266-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 129.1 | 266-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | WHEEL HOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 129.2 | 266-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | SCHEMATIC TANK VENT SOUNDING |
17-Apr-2026 | 1 | |
| 129.3 | 266-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | PROPELLER NOZZLE DETAIL |
17-Apr-2026 | 1 | |
| 130 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | |
| 130.1 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | SOUNDING FILLING AND AIR PIPE ARRANGEMENT |
17-Apr-2026 | 1 | |
| 130.2 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | PUMP ROOM LAYOUT |
17-Apr-2026 | 1 | |
| 130.3 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | BILGE AND GS SYSTEM |
17-Apr-2026 | 1 | |
| 130.4 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | COT AND DBT VENT AND SOUND ARRANGEMENT |
17-Apr-2026 | 1 | |
| 130.5 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | FUEL OIL SYSTEM |
17-Apr-2026 | 1 | |
| 130.6 | 297-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | ENGINE ROOM LAYOUT |
17-Apr-2026 | 1 | |
| 131 | 302-MM/4/2026 |
HENDRA 879 (PKBL NON TOC) 2602030127 |
CREW BOAT |
PIPING SYSTEM |
17-Apr-2026 | 1 | - |
| 132 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP |
Multiple Items (11 Gambar) |
17-Apr-2026 | 11 | |
| 132.1 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | VERTICAL LADDER DETAILS |
17-Apr-2026 | 1 | |
| 132.2 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | INCLINED LADDER DETAILS |
17-Apr-2026 | 1 | |
| 132.3 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | RUBBER FENDER ARRANGEMENT |
17-Apr-2026 | 1 | |
| 132.4 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | ANODE ARRANGEMENT |
17-Apr-2026 | 1 | |
| 132.5 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | HATCH ARRANGEMENT DETAILS |
17-Apr-2026 | 1 | |
| 132.6 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | RAILING ARRANGEMENT |
17-Apr-2026 | 1 | |
| 132.7 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | BOLLARD ARRANGEMENT |
17-Apr-2026 | 1 | |
| 132.8 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | DOCKING PLAN DETAILS |
17-Apr-2026 | 1 | |
| 132.9 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | MANHOLE ARRANGEMENT AND DETAILS |
17-Apr-2026 | 1 | |
| 132.10 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | WINDOWS ARRANGEMENT |
17-Apr-2026 | 1 | |
| 132.11 | 258-LL/4/2026 |
SEMAYA ONE MIRACLE (PKBL) 2502021469 |
PASSENGER SHIP | DOOR ARRANGEMENT |
17-Apr-2026 | 1 | |
| 133 | 194-SC/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 133.1 | 194-SC/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | LINES PLAN |
17-Apr-2026 | 1 | |
| 133.2 | 194-SC/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | CAPACITY PLAN |
17-Apr-2026 | 1 | |
| 134 | 143-ML/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT |
MAIN SWITCH BOARD |
17-Apr-2026 | 1 | - |
| 135 | 1-SNBWM/4/2026 |
NOVAH - BWMP APPROVAL 2639090068 |
Novah - BWMP |
17-Apr-2026 | 1 | - | |
| 136 | 185-SC/4/2026 |
ATH - 001 2401021433 |
TUG BOAT |
ATH-01-G100-05 Final Intact Stability Booklet |
17-Apr-2026 | 1 | - |
| 137 | 189-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT |
GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 138 | 191-LLBM/4/2026 |
HULL - 019 2501020015 |
TUG BOAT |
DECK HOUSE WHEEL HOUSE 2of2 |
17-Apr-2026 | 1 | - |
| 139 | 193-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT |
GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 140 | 286-MM/4/2026 |
FRASER MAS EX. AO HUA LAN TIAN 2602010042 |
GENERAL CARGO |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 140.1 | 286-MM/4/2026 |
FRASER MAS EX. AO HUA LAN TIAN 2602010042 |
GENERAL CARGO | PROPELLER SHAFT |
17-Apr-2026 | 1 | |
| 140.2 | 286-MM/4/2026 |
FRASER MAS EX. AO HUA LAN TIAN 2602010042 |
GENERAL CARGO | PROPELLER SHAFT COUPLING |
17-Apr-2026 | 1 | |
| 140.3 | 286-MM/4/2026 |
FRASER MAS EX. AO HUA LAN TIAN 2602010042 |
GENERAL CARGO | PROPELLER DIAGRAM |
17-Apr-2026 | 1 | |
| 140.4 | 286-MM/4/2026 |
FRASER MAS EX. AO HUA LAN TIAN 2602010042 |
GENERAL CARGO | PROPELLER SHAFT LO SYSTEM |
17-Apr-2026 | 1 | |
| 141 | 195-LLBM/4/2026 |
HULL - 021 2501020016 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 141.1 | 195-LLBM/4/2026 |
HULL - 021 2501020016 |
TUG BOAT | DECK HOUSE WHEEL HOUSE 1of 2 HULL 21 |
17-Apr-2026 | 1 | |
| 141.2 | 195-LLBM/4/2026 |
HULL - 021 2501020016 |
TUG BOAT | DECK HOUSE WHEEL HOUSE 2of 2 HULL 21 |
17-Apr-2026 | 1 | |
| 142 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | |
| 142.1 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | PROPELLER SHAFT |
17-Apr-2026 | 1 | |
| 142.2 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | AIR-FILLING AND SOUNDING PIPE |
17-Apr-2026 | 1 | |
| 142.3 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | ENGINE ROOM LAYOUT |
17-Apr-2026 | 1 | |
| 142.4 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | FUEL OIL SYSTEM |
17-Apr-2026 | 1 | |
| 142.5 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | FRESH WATER SYSTEM |
17-Apr-2026 | 1 | |
| 142.6 | 287-MM/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | STERN TUBE |
17-Apr-2026 | 1 | |
| 143 | 247-LL/4/2026 |
NEW ZHIMA 2502010527 |
PASSENGER AND CAR CARRIER |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 143.1 | 247-LL/4/2026 |
NEW ZHIMA 2502010527 |
PASSENGER AND CAR CARRIER | VEHICLE SECURING CALCULATION |
17-Apr-2026 | 1 | |
| 143.2 | 247-LL/4/2026 |
NEW ZHIMA 2502010527 |
PASSENGER AND CAR CARRIER | VEHICLE DECK STRENGTH DIRECT |
17-Apr-2026 | 1 | |
| 144 | 190-SC/4/2026 |
CAST MARINE 1 2603020194 |
HIGH SPEED PASSANGER VESSEL |
FINAL STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 145 | 1-SNSMP/4/2026 |
NOVAH - SMPEP APPROVAL 2639090075 |
Novah - SMPEP |
17-Apr-2026 | 1 | - | |
| 146 | 60-MMBM/4/2026 |
MPS - 037 (FINAL) 2601020076 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 146.1 | 60-MMBM/4/2026 |
MPS - 037 (FINAL) 2601020076 |
TUG BOAT | MPS-037-P07-FUEL OIL SYSTEM REV A |
17-Apr-2026 | 1 | |
| 146.2 | 60-MMBM/4/2026 |
MPS - 037 (FINAL) 2601020076 |
TUG BOAT | MPS-037-P05-SEA WATER COOLING SYSTEM REV A |
17-Apr-2026 | 1 | |
| 147 | 257-LL/4/2026 |
MP 2809 (FINAL) 2601030071 |
TUG BOAT |
DECK HOUSE CONSTRUCTION |
17-Apr-2026 | 1 | - |
| 148 | 253-LL/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 148.1 | 253-LL/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT | SKEG AND DETAIL |
17-Apr-2026 | 1 | |
| 148.2 | 253-LL/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT | TOWING TABLE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 148.3 | 253-LL/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT | WELDING SCHEDULE |
17-Apr-2026 | 1 | |
| 149 | 304-MM/4/2026 |
KARYA CEMERLANG 89 2501030276 |
LANDING CRAFT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 149.1 | 304-MM/4/2026 |
KARYA CEMERLANG 89 2501030276 |
LANDING CRAFT | BILGE, G.S. AND F.W. SYSTEM |
17-Apr-2026 | 1 | |
| 149.2 | 304-MM/4/2026 |
KARYA CEMERLANG 89 2501030276 |
LANDING CRAFT | FIRE FIGHTING SYSTEM |
17-Apr-2026 | 1 | |
| 150 | 306-MM/4/2026 |
H420 LCT 19.9 M (DELIVERY) 2501010583 |
FAST PATROL BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 150.1 | 306-MM/4/2026 |
H420 LCT 19.9 M (DELIVERY) 2501010583 |
FAST PATROL BOAT | SEA WATER COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 150.2 | 306-MM/4/2026 |
H420 LCT 19.9 M (DELIVERY) 2501010583 |
FAST PATROL BOAT | DG COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 151 | 139-ML/4/2026 |
BUNGA TERATAI 3 2502030241 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 151.1 | 139-ML/4/2026 |
BUNGA TERATAI 3 2502030241 |
SELF PROP.OIL BARGE | BALANCE DAYA |
17-Apr-2026 | 1 | |
| 151.2 | 139-ML/4/2026 |
BUNGA TERATAI 3 2502030241 |
SELF PROP.OIL BARGE | WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 151.3 | 139-ML/4/2026 |
BUNGA TERATAI 3 2502030241 |
SELF PROP.OIL BARGE | MAIN SWITCHBOARD |
17-Apr-2026 | 1 | |
| 152 | 184-SC/4/2026 |
ATH - 002 2401021434 |
TUG BOAT |
ATH-002-G100-05-02 Final Intact Stability Booklet |
17-Apr-2026 | 1 | - |
| 153 | 281-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 153.1 | 281-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | CONSTRUCTION PROFILE |
17-Apr-2026 | 1 | |
| 153.2 | 281-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | TRANSVERSAL SECTION & BULKHEAD |
17-Apr-2026 | 1 | |
| 154 | 3-MMSS/4/2026 |
NOVAH - FIRE CONTROL SAFETY PLAN 2605090073 |
OIL / CHEMICAL TANKER |
FIRE CONTROL PLAN |
17-Apr-2026 | 1 | - |
| 155 | 244-LL/4/2026 |
PUTRA WAJO 2502010530 |
PASSENGER AND CAR CARRIER |
VEHICLE SECURING CALCULATION |
17-Apr-2026 | 1 | - |
| 156 | 294-MM/4/2026 |
FIGAR JAYA V (FINAL) 2501120083 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 156.1 | 294-MM/4/2026 |
FIGAR JAYA V (FINAL) 2501120083 |
SELF PROPELLED OIL/CHEMICAL BARGE | BILGE BALLAST AND FIRE PIPE SYSTEM |
17-Apr-2026 | 1 | |
| 156.2 | 294-MM/4/2026 |
FIGAR JAYA V (FINAL) 2501120083 |
SELF PROPELLED OIL/CHEMICAL BARGE | AIR SOUNDING FILLING PIPE |
17-Apr-2026 | 1 | |
| 157 | 17-MLMK/4/2026 |
(MSB) TUGBOAT 29 M H-019 2609020262 |
TUG BOAT |
MAIN SWITCH BOARD |
17-Apr-2026 | 1 | - |
| 158 | 146-ML/4/2026 |
SYAHRAH SAVITRI 2602030045 |
OIL TANKER |
WIRING DIAGRAM |
17-Apr-2026 | 1 | - |
| 159 | 308-MM/4/2026 |
IPS 01 2603020231 |
TUG BOAT |
ENGINE ROOM LAYOUT |
17-Apr-2026 | 1 | - |
| 160 | 186-SC/4/2026 |
JETLINER 2503060041 |
PASSANGER FERRY |
DAMAGE STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 161 | 138-ML/4/2026 |
MPS - 037 (FINAL) 2601020076 |
TUG BOAT |
MPS-037-E03-SINGLE LINE DIAGRAM REV A |
17-Apr-2026 | 1 | - |
| 162 | 265-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 162.1 | 265-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | RUDDER AND RUDDER STOCK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 162.2 | 265-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | FORE PEAK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 163 | 254-LL/4/2026 |
GS STAR 38 (FINAL) 2501030336 |
TUG BOAT |
INSULATION PLAN |
17-Apr-2026 | 1 | - |
| 164 | 291-MM/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 164.1 | 291-MM/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H081-VENT-FILLING and SOUNDING PIPE |
17-Apr-2026 | 1 | |
| 164.2 | 291-MM/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H081-BILGE and FIRE LINE SCHEMATIC |
17-Apr-2026 | 1 | |
| 165 | 147-ML/4/2026 |
IPS 01 2603020231 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 165.1 | 147-ML/4/2026 |
IPS 01 2603020231 |
TUG BOAT | MAIN SWITCH BOARD and WIRING DIGRAM |
17-Apr-2026 | 1 | |
| 165.2 | 147-ML/4/2026 |
IPS 01 2603020231 |
TUG BOAT | ELECTRIC LOAD BALANCE |
17-Apr-2026 | 1 | |
| 166 | 295-MM/4/2026 |
MAHALO 15 2503040318 |
CREW BOAT |
PLUMBING LINE SCHEMATIC |
17-Apr-2026 | 1 | - |
| 167 | 195-SC/4/2026 |
NOVAH (DRAWING APPROVAL) 2605090072 |
OIL / CHEMICAL TANKER |
STABILITY INFORMATION |
17-Apr-2026 | 1 | - |
| 168 | 197-SC/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
TANK CAPACITY PLAN |
20-Apr-2026 | 1 | - |
| 169 | 285-LL/4/2026 |
KAPUAS BAHARI XI 2602140023 |
TUG BOAT |
Multiple Items (3 Gambar) |
20-Apr-2026 | 3 | |
| 169.1 | 285-LL/4/2026 |
KAPUAS BAHARI XI 2602140023 |
TUG BOAT | MAIN ENGINE GIRDER |
20-Apr-2026 | 1 | |
| 169.2 | 285-LL/4/2026 |
KAPUAS BAHARI XI 2602140023 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
20-Apr-2026 | 1 | |
| 169.3 | 285-LL/4/2026 |
KAPUAS BAHARI XI 2602140023 |
TUG BOAT | DECK AND CONSTRUCTION 2/2 |
20-Apr-2026 | 1 | |
| 170 | 286-LL/4/2026 |
HULL 112 PT.KAS 2601140007 |
OIL/CHEMICAL BARGE |
WELDING SCHEDULE |
20-Apr-2026 | 1 | - |
| 171 | 300-LL/4/2026 |
PONTOON KAPAL INDUK 2 (FINAL) 2601120014 |
PONTOON |
Multiple Items (4 Gambar) |
20-Apr-2026 | 4 | |
| 171.1 | 300-LL/4/2026 |
PONTOON KAPAL INDUK 2 (FINAL) 2601120014 |
PONTOON | SHELL EXPANSION |
20-Apr-2026 | 1 | |
| 171.2 | 300-LL/4/2026 |
PONTOON KAPAL INDUK 2 (FINAL) 2601120014 |
PONTOON | MIDSHIP SECTION - WEB FRAME & MAIN FRAME |
20-Apr-2026 | 1 | |
| 171.3 | 300-LL/4/2026 |
PONTOON KAPAL INDUK 2 (FINAL) 2601120014 |
PONTOON | POTONGAN POONTON AND DETAIL |
20-Apr-2026 | 1 | |
| 171.4 | 300-LL/4/2026 |
PONTOON KAPAL INDUK 2 (FINAL) 2601120014 |
PONTOON | RENCANA UMUM |
20-Apr-2026 | 1 | |
| 172 | 38-LLI/4/2026 |
GAS ARIA - LOAD LINE DRAWINGS APPROVAL 2605090079 |
CNG (COMPRESS NATURAL GAS) CARRIER |
Multiple Items (2 Gambar) |
20-Apr-2026 | 2 | |
| 172.1 | 38-LLI/4/2026 |
GAS ARIA - LOAD LINE DRAWINGS APPROVAL 2605090079 |
CNG (COMPRESS NATURAL GAS) CARRIER | MIDSHIP SECTION |
20-Apr-2026 | 1 | |
| 172.2 | 38-LLI/4/2026 |
GAS ARIA - LOAD LINE DRAWINGS APPROVAL 2605090079 |
CNG (COMPRESS NATURAL GAS) CARRIER | GENERAL ARRANGEMENT |
20-Apr-2026 | 1 | |
| 173 | 201-LLBM/4/2026 |
H - 904 (FINAL) 2501020701 |
SELF PROPELLED OIL/CHEMICAL BARGE |
CONNECTION ROD TUNNEL |
20-Apr-2026 | 1 | - |
| 174 | 124-SCBM/4/2026 |
H - 818 2401021515 |
PONTOON |
H-818 Final Intact Stability |
20-Apr-2026 | 1 | - |
| 175 | 199-LLBM/4/2026 |
PS2-00048 (FINAL) 2501021561 |
PONTOON |
Multiple Items (2 Gambar) |
20-Apr-2026 | 2 | |
| 175.1 | 199-LLBM/4/2026 |
PS2-00048 (FINAL) 2501021561 |
PONTOON | FWD CONSTRUCTION PLAN |
20-Apr-2026 | 1 | |
| 175.2 | 199-LLBM/4/2026 |
PS2-00048 (FINAL) 2501021561 |
PONTOON | GENERAL ARRANGEMENT |
20-Apr-2026 | 1 | |
| 176 | 202-LLBM/4/2026 |
H - 940 (FINAL) 2501020843 |
SELF PROPELLED OIL/CHEMICAL BARGE |
CONNECTION ROD TUNNEL |
20-Apr-2026 | 1 | - |
| 177 | 200-LLBM/4/2026 |
H - 818 2401021515 |
PONTOON |
H-818 Final Long Strength Calculation |
20-Apr-2026 | 1 | - |
| 178 | 3-SHMK/4/2026 |
(WELDING SHOP) PT. WARTSILA INDONESIA 2541010591 |
PENGOPERASIAN MESIN LAS LISTRIK (MIG-GMAW) |
20-Apr-2026 | 1 | - | |
| 179 | 196-SC/4/2026 |
CAST MARINE 1 2603020194 |
HIGH SPEED PASSANGER VESSEL |
CAPACITY PLAN |
20-Apr-2026 | 1 | - |
| 180 | 283-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
GENERAL ARRANGEMENT |
20-Apr-2026 | 1 | - |
03/03/2026
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 47-LL/3/2026 |
DUMAI LINE - 8 (Non TOC) 2502021582 |
PASSENGER SHIP |
"HULL STRUCTURE & BULKHEADS 3/4 |
01-Jan-1970 | 1 | - |
ADAM PERDANA PUTERA, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 43-SC/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
06-Apr-2026 | 2 | |
| 1.1 | 43-SC/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | INTACT STABILITY CALCULATION |
06-Apr-2026 | 1 | |
| 1.2 | 43-SC/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | CAPACITY PLAN |
06-Apr-2026 | 1 | |
| 2 | 58-SC/4/2026 |
BHIMA GIRI NUSA (APP. DRAWING) 2504040240 |
LANDING CRAFT |
Multiple Items (2 Gambar) |
07-Apr-2026 | 2 | |
| 2.1 | 58-SC/4/2026 |
BHIMA GIRI NUSA (APP. DRAWING) 2504040240 |
LANDING CRAFT | CAPACITY PLAN |
07-Apr-2026 | 1 | |
| 2.2 | 58-SC/4/2026 |
BHIMA GIRI NUSA (APP. DRAWING) 2504040240 |
LANDING CRAFT | FINAL STABILITY |
07-Apr-2026 | 1 | |
| 3 | 59-SC/4/2026 |
BHIMA GIRI NUSA (APP. DRAWING) 2504040240 |
LANDING CRAFT |
DAMAGE STABILITY |
07-Apr-2026 | 1 | - |
| 4 | 77-SC/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL |
TANK CAPACITY PLAN |
09-Apr-2026 | 1 | - |
| 5 | 124-SC/4/2026 |
HENDRA 18 2602030051 |
CREW BOAT |
HYDROSTATIC AND STABILITY CALCULATION |
13-Apr-2026 | 1 | - |
| 6 | 147-SC/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG |
PRELIMINARY INTACT STABILITY BOOKLET |
14-Apr-2026 | 1 | - |
| 7 | 145-SC/4/2026 |
DUTA KAPUAS 30 2501140012 |
TUG BOAT |
PRELIMINARY STABILITY BOOKLET |
14-Apr-2026 | 1 | - |
| 8 | 154-SC/4/2026 |
KH 53 (DELIVERY) 2501010518 |
CREW BOAT |
FINAL INTACT STABILITY |
15-Apr-2026 | 1 | - |
| 9 | 164-SC/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT |
LINES PLAN |
15-Apr-2026 | 1 | - |
| 10 | 156-SC/4/2026 |
LEGASEA 5 2501140013 |
TUG BOAT |
PRELIMINARY STABILITY BOOKLET |
15-Apr-2026 | 1 | - |
| 11 | 160-SC/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 11.1 | 160-SC/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | PRELIMINARY TRIM STABILITY CALCULATION |
15-Apr-2026 | 1 | |
| 11.2 | 160-SC/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | LINES PLAN |
15-Apr-2026 | 1 | |
| 12 | 151-SC/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 12.1 | 151-SC/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | TANK CAPACITY PLAN |
15-Apr-2026 | 1 | |
| 12.2 | 151-SC/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | INTACT STABILITY BOOKLET |
15-Apr-2026 | 1 | |
| 13 | 177-SC/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 13.1 | 177-SC/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | TANK CAPACITY PLAN |
16-Apr-2026 | 1 | |
| 13.2 | 177-SC/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | LINES PLAN |
16-Apr-2026 | 1 | |
| 13.3 | 177-SC/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | INTACT STABILITY BOOKLET |
16-Apr-2026 | 1 | |
| 14 | 170-SC/4/2026 |
RIVER HORSE 2502030495 |
DREDGER |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 15 | 173-SC/4/2026 |
SULTAN 77 (NOT TOCA) 2602030133 |
CREW BOAT |
INTACT STABILITY BOOKLET |
16-Apr-2026 | 1 | - |
| 16 | 180-SC/4/2026 |
LIAN HANG 351 2502120002 |
GENERAL CARGO |
DAMAGE STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 17 | 191-SC/4/2026 |
MTA 888 (PKBL NON TOC) 2602030146 |
CREW BOAT |
HYDROSTATIC AND STABILITY CALCULATION |
17-Apr-2026 | 1 | - |
| 18 | 198-SC/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
DAMAGE STABILITY BOOKLET |
20-Apr-2026 | 1 | - |
ADE NURSAL, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
Multiple Items (22 Gambar) |
13-Apr-2026 | 22 | ||
| 1.1 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
ORGANIZATION CHART |
13-Apr-2026 | 1 | ||
| 1.2 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
SYSTEM INTEGRATED MANAGEMENT MANUAL Version A/2 |
13-Apr-2026 | 1 | ||
| 1.3 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
MANUFACTURING PROCESS FLOWCHART |
13-Apr-2026 | 1 | ||
| 1.4 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
CERTIFICATE ISO 45001:2018 (ENGLISH and CHINA) |
13-Apr-2026 | 1 | ||
| 1.5 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
NK CERTIFICATE OF TYPE APPROVAL LT-H10Mn (EM12K / SJ101 (WIRE / FLUX) |
13-Apr-2026 | 1 | ||
| 1.6 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
CERTIFICATE ISO 14001:2015 (ENGLISH and CHINA) |
13-Apr-2026 | 1 | ||
| 1.7 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
DNV TYPE APPROVAL CERTIFICATE LT H10Mn / SJ 101 |
13-Apr-2026 | 1 | ||
| 1.8 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
WELDING MATERIALS DIVISION MEASUREMENT EQUIPMENT CALIBRATION PLAN |
13-Apr-2026 | 1 | ||
| 1.9 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
CERTIFICATE ISO 9001:2025 |
13-Apr-2026 | 1 | ||
| 1.10 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
DB APPROVAL CERTIFICATE FOR WELDING CONSUMABLES LTH.08MnA (EM12) |
13-Apr-2026 | 1 | ||
| 1.11 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
PHOTO WELDING CONSUMABLE EM12K |
13-Apr-2026 | 1 | ||
| 1.12 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
PRESENTATION OF CHANGSHU LONGTENG WELDING MATERIALS TECHNOLOGY CO,. LTD. |
13-Apr-2026 | 1 | ||
| 1.13 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
SYSTEM INTEGRATED MANAGEMENT MANUAL Version A/1 |
13-Apr-2026 | 1 | ||
| 1.14 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
MANUAL PRODUCT OF EM12K |
13-Apr-2026 | 1 | ||
| 1.15 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
FINISHED GOODS RECEIPT, ISSUANCE AND STORAGE MANAGEMENT SYSTEM |
13-Apr-2026 | 1 | ||
| 1.16 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
Annex 1 (2026-0-16, Rev.05) FILLER METALS WITH CE MARKING DB CERTIFICATE OF TUV-VERBAND DATA SHEET |
13-Apr-2026 | 1 | ||
| 1.17 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
COMPANY PROFILE |
13-Apr-2026 | 1 | ||
| 1.18 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
LAYOUT OF ELECTRODE PRODUCTION LINE |
13-Apr-2026 | 1 | ||
| 1.19 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
COMPREHENSIVE MANAGEMENT MANUAL - ISO 9001 |
13-Apr-2026 | 1 | ||
| 1.20 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
ABS WELDING CONSUMABLE CERTIFICATE LTH.H10Mn (EM12K) |
13-Apr-2026 | 1 | ||
| 1.21 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
LONGTENG SPECIAL STEEL WELDING MATERIAL CATALOGUE ALL TYPE |
13-Apr-2026 | 1 | ||
| 1.22 | 6-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
PACKAGING STANDAR |
13-Apr-2026 | 1 | ||
| 2 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
Multiple Items (8 Gambar) |
14-Apr-2026 | 8 | ||
| 2.1 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
TANGGAPAN SURAT PENGADUAN |
14-Apr-2026 | 1 | ||
| 2.2 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
CODE OF CONDUCT |
14-Apr-2026 | 1 | ||
| 2.3 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
SURAT PELATIHAN KEPELATIHAN |
14-Apr-2026 | 1 | ||
| 2.4 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
DAFTAR PERSONIL UNDERWATER |
14-Apr-2026 | 1 | ||
| 2.5 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
SKB, C.V. AND CERTIFICATE OF QUALIFICATION - JUMARI |
14-Apr-2026 | 1 | ||
| 2.6 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
QUALITY MANUAL |
14-Apr-2026 | 1 | ||
| 2.7 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
LAPORAN PEKERJAAN KN SAR GANESHA |
14-Apr-2026 | 1 | ||
| 2.8 | 2-SAMK/4/2026 |
(IN-WATER SURVEY COMPANY) PT. KARYASANTOSA TATAJAYA 2540010535 |
SKB, C.V. AND CERTIFICATE OF QUALIFICATION - SABAR PASARIBU |
14-Apr-2026 | 1 | ||
| 3 | 1-LLMK/4/2026 |
(PINTU KEDAP AIR & CUACA) LESTARI JAYA INDO - 7 LCT. 2609060009 |
LANDING CRAFT |
WEATHER TIGHT DOOR |
15-Apr-2026 | 1 | - |
| 4 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
Multiple Items (24 Gambar) |
16-Apr-2026 | 24 | ||
| 4.1 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
LEGALITAS PERUSAHAAN |
16-Apr-2026 | 1 | ||
| 4.2 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
TRAINING AND COMPETENCE PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.3 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
RECORD OF REPORT NDT |
16-Apr-2026 | 1 | ||
| 4.4 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
MANAGEMENT RIVIEW PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.5 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
LIST CERTIFICATE OF APPROVAL CLASS |
16-Apr-2026 | 1 | ||
| 4.6 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
CUSTOMER SATISFACTION FORM |
16-Apr-2026 | 1 | ||
| 4.7 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
OPERATION PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.8 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
LIST OF NOMINATED AGENT |
16-Apr-2026 | 1 | ||
| 4.9 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
DM5E OPERATING MANUAL |
16-Apr-2026 | 1 | ||
| 4.10 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
COMPANY PROFILE |
16-Apr-2026 | 1 | ||
| 4.11 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
SAFETY WORK PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.12 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
PLAN & SCHEDULE TRAINING PROGRAMS |
16-Apr-2026 | 1 | ||
| 4.13 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
CTS-9005 DIGITAL ULTRASONIC FLAW DETECTOR OPERATION MANUAL (SIUI MANUAL BOOK) |
16-Apr-2026 | 1 | ||
| 4.14 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
QUALITY MANUAL |
16-Apr-2026 | 1 | ||
| 4.15 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
HUMAN RESOURCES AND ADMINISTRATIVE PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.16 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
CONFLICT OF INTEREST DECLARATION FORM |
16-Apr-2026 | 1 | ||
| 4.17 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
CUSTOMER FEEDBACK PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.18 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
LIST OF MAINTENCE FOR EQUIPMENTS (NDT) AND CERTIFICATE CALIBRATION |
16-Apr-2026 | 1 | ||
| 4.19 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
TABEL OF CONTENTS |
16-Apr-2026 | 1 | ||
| 4.20 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
INTERNAL QUALITY AUDIT PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.21 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
RECORD PROJECT UT MEASUREMENT |
16-Apr-2026 | 1 | ||
| 4.22 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
CONTROL OF DOCUMENT PROCEDURE |
16-Apr-2026 | 1 | ||
| 4.23 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
LIST AND CERTIFICATE OF PERSONELS NDT |
16-Apr-2026 | 1 | ||
| 4.24 | 3-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. GONG SAMUDRA INTERNASIONAL 2640020324 |
CORRECTIVE ACTION-PREVENTIVE ACTION REQUEST (CAR-PAR) FORM |
16-Apr-2026 | 1 | ||
| 5 | 11-TAMK/4/2026 |
(AF (KAZOKU VANGUARD 611)) PT. KAZOKU PAINT INDONESIA 2641120020 |
Multiple Items (2 Gambar) |
16-Apr-2026 | 2 | ||
| 5.1 | 11-TAMK/4/2026 |
(AF (KAZOKU VANGUARD 611)) PT. KAZOKU PAINT INDONESIA 2641120020 |
LAPORAN HASIL UJI |
16-Apr-2026 | 1 | ||
| 5.2 | 11-TAMK/4/2026 |
(AF (KAZOKU VANGUARD 611)) PT. KAZOKU PAINT INDONESIA 2641120020 |
SURAT KETERANGAN HASIL PENGUJIAN (TIMBANGAN ELEKTRONIK (SONIC/A1-5 DD)) |
16-Apr-2026 | 1 | ||
| 6 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
Multiple Items (26 Gambar) |
17-Apr-2026 | 26 | ||
| 6.1 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
ORGANIZATION STRUCTURE |
17-Apr-2026 | 1 | ||
| 6.2 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
EVRAZ NTMK 2014.05.13 PHYSICAL PROPERTY STATISTICS PERFORMANCE |
17-Apr-2026 | 1 | ||
| 6.3 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
PM NTMK 01-2024 CERTIFICATION TESTING PROGRAM FOR CONTINUOUSLY CAST SLABS OF SHIP STEEL GRADES |
17-Apr-2026 | 1 | ||
| 6.4 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
TESTING EQUIPMENT LIST |
17-Apr-2026 | 1 | ||
| 6.5 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
DESCRIPTION OF STEEL BILLET AND SLAB PRODUCTION PROCESS IN THE (BOS) NO.1 OF JSC EVRAZ NTMK |
17-Apr-2026 | 1 | ||
| 6.6 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
NTMK SM520CVH Slab applied Plate MTC Example |
17-Apr-2026 | 1 | ||
| 6.7 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
TECHNICAL SPECIFICATION TU 0885-028 - 00186269 - 2014 WITH AMEND. 1,2 (FIRST ISSUE) |
17-Apr-2026 | 1 | ||
| 6.8 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
BUSINESS MANAGEMENT SYSTEM (PRODUCT IDENTIFICATION AND TRACEABILITY) ORGANIZATION STANDARD |
17-Apr-2026 | 1 | ||
| 6.9 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
BUSINESS MANAGEMENT SYSTEM (MAINTENANCE AND REPAIRS) COMPANY STANDART |
17-Apr-2026 | 1 | ||
| 6.10 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
INFORMATION TO BE SUBMITTED TO THE BKI |
17-Apr-2026 | 1 | ||
| 6.11 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
QUALITY CONTROL PLAN OF CONCAST SLABS FOR FLAT STEEL PRODUCTION |
17-Apr-2026 | 1 | ||
| 6.12 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
LIST OF THE MAIN MANUFACTURING EQUIPMENT (BOS NO.1) OF JSC EVRAZ NTMK |
17-Apr-2026 | 1 | ||
| 6.13 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
REPORT ON THE QUALITY OF SLABS PRODUCED by NTMK |
17-Apr-2026 | 1 | ||
| 6.14 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
DATA OF THE PERSONNEL WORKING EXPERIENCE OF THE CENTRAL PLANT LABORATORY |
17-Apr-2026 | 1 | ||
| 6.15 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
NOTICE OF REORGANIZATION AND CHANGE OF NAME |
17-Apr-2026 | 1 | ||
| 6.16 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
SM520-AH36 MTC |
17-Apr-2026 | 1 | ||
| 6.17 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
CONVERTER SHOP AND CCM |
17-Apr-2026 | 1 | ||
| 6.18 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
MANAGEMENT SYSTEMS (PERSONNEL MANAGEMENT) COMPANY STANDARD |
17-Apr-2026 | 1 | ||
| 6.19 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
SLAB PROCESS FLOW |
17-Apr-2026 | 1 | ||
| 6.20 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
APPROVAL OF MANUFACTURING PROCESS FOR STEEL SLABS |
17-Apr-2026 | 1 | ||
| 6.21 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
ORGANIZATION STRUCTURE OF TECHNICAL CONTROL MANAGEMENT |
17-Apr-2026 | 1 | ||
| 6.22 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
EVRAZ NTMK PROCESS DIAGRAM IN 2023 |
17-Apr-2026 | 1 | ||
| 6.23 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
PROCESS CAPABILITY ANALYSIS FOR PLATES GRADES BVA, BVAH36 |
17-Apr-2026 | 1 | ||
| 6.24 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
ISO 9001:2015 |
17-Apr-2026 | 1 | ||
| 6.25 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
EXTRACT (FROM THE UNIFIED STATE REGISTER OF LEGAL ENTITIES) |
17-Apr-2026 | 1 | ||
| 6.26 | 1-MPMK/4/2026 |
(CONTINUOUS CAST SLABS OF NORMAL AND HIGHT STRENGTH STEEL) JSC EVRAZ NTMK 2541180024 |
PROCESS CAPABILITY ANALYSIS FOR PLATES GRADES LRA, LRAH36, LRDH36 |
17-Apr-2026 | 1 | ||
| 7 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | ||
| 7.1 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
SKB, C.V. AND CERTIFICATE OF QUALIFICATION - AGUS SUSANTO (WELDING SUPERVISOR) |
17-Apr-2026 | 1 | ||
| 7.2 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
SNI ISO 45001:2018 |
17-Apr-2026 | 1 | ||
| 7.3 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
SNI ISO 9001:2015 |
17-Apr-2026 | 1 | ||
| 7.4 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
SNI ISO 14001:2015 |
17-Apr-2026 | 1 | ||
| 7.5 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
PROSEDUR PRODUKSI BANGUNAN BARU - PRODUKSI |
17-Apr-2026 | 1 | ||
| 7.6 | 1-SHMK/4/2026 |
(WSA) PT. TRI RATNA DIESEL INDONESIA 2541040239 |
LAMPIRAN FASILITAS GALANGAN |
17-Apr-2026 | 1 | ||
| 8 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
Multiple Items (7 Gambar) |
17-Apr-2026 | 7 | ||
| 8.1 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
DAFTAR INVENTARIS PERALATAN 2026 |
17-Apr-2026 | 1 | ||
| 8.2 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
SERTIFIKAT PROSEDUR LAS |
17-Apr-2026 | 1 | ||
| 8.3 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
SERTIFIKAT UJI KUALIFIKASI JURU LAS |
17-Apr-2026 | 1 | ||
| 8.4 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
COMPANY BROCHURE |
17-Apr-2026 | 1 | ||
| 8.5 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
SURAT KETERANGAN KERJA - JAUHARI MUSLIM (MANAJER AND QC) |
17-Apr-2026 | 1 | ||
| 8.6 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
SHIPYARD LAY OUT |
17-Apr-2026 | 1 | ||
| 8.7 | 2-SHMK/4/2026 |
(WSA) PT. GALANGAN BERKAT FORTUNA 2641030098 |
STRUKTUR ORGANISASI |
17-Apr-2026 | 1 | ||
| 9 | 12-TAMK/4/2026 |
(LT-H10Mn(EM12K)/SJ101) CHANGSHU LONGTENG WELDING MATERIAL CO., LTD. 2641090091 |
INITIAL TEST PROGRAM (LTH.10Mn (EM12K)) |
17-Apr-2026 | 1 | - | |
| 10 | 13-TAMK/4/2026 |
(PERMANENT MT-FC71T-1 (3YSAH10)) TIANJIN MINMETALS CO,.LTD. 2641010135 |
Multiple Items (4 Gambar) |
20-Apr-2026 | 4 | ||
| 10.1 | 13-TAMK/4/2026 |
(PERMANENT MT-FC71T-1 (3YSAH10)) TIANJIN MINMETALS CO,.LTD. 2641010135 |
ABS WELDING ONSUMABLE MARKETING CERTIFICATE PERMANENT MT-FC71T-1 |
20-Apr-2026 | 1 | ||
| 10.2 | 13-TAMK/4/2026 |
(PERMANENT MT-FC71T-1 (3YSAH10)) TIANJIN MINMETALS CO,.LTD. 2641010135 |
APPROVAL TEST PLAN FOR MT-FC71T-1 |
20-Apr-2026 | 1 | ||
| 10.3 | 13-TAMK/4/2026 |
(PERMANENT MT-FC71T-1 (3YSAH10)) TIANJIN MINMETALS CO,.LTD. 2641010135 |
MATERIAL SAFETY DATA SHEET PERMANENT MT-FC71T-1 |
20-Apr-2026 | 1 | ||
| 10.4 | 13-TAMK/4/2026 |
(PERMANENT MT-FC71T-1 (3YSAH10)) TIANJIN MINMETALS CO,.LTD. 2641010135 |
TECHNICAL SAFETY DATA SHEET MT-FC71T-1 |
20-Apr-2026 | 1 | ||
| 11 | 4-SHMK/4/2026 |
(WELDING SHOP) PT. WARTSILA INDONESIA 2541010591 |
Multiple Items (2 Gambar) |
20-Apr-2026 | 2 | ||
| 11.1 | 4-SHMK/4/2026 |
(WELDING SHOP) PT. WARTSILA INDONESIA 2541010591 |
LISTS MEASUREMENT TOOLS FOR CPP-FPP PROPELLER REPAIR |
20-Apr-2026 | 1 | ||
| 11.2 | 4-SHMK/4/2026 |
(WELDING SHOP) PT. WARTSILA INDONESIA 2541010591 |
WORKSHOP FACILITIES |
20-Apr-2026 | 1 | ||
| 12 | 14-TAMK/4/2026 |
(STINWELD RR-213(ANNUAL)) PT. RANGKA RAYA 2641010136 |
Multiple Items (2 Gambar) |
20-Apr-2026 | 2 | ||
| 12.1 | 14-TAMK/4/2026 |
(STINWELD RR-213(ANNUAL)) PT. RANGKA RAYA 2641010136 |
APPROVAL TEST PROGRAM STINWELD BRAND RR-213 (E6013) |
20-Apr-2026 | 1 | ||
| 12.2 | 14-TAMK/4/2026 |
(STINWELD RR-213(ANNUAL)) PT. RANGKA RAYA 2641010136 |
APPROVAL TEST PROGRAM PERMANENT BRAND MT-12 (E6013) |
20-Apr-2026 | 1 |
AFDHAL ALFENDRY
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 70-SCBM/4/2026 |
HULL - 077 (FINAL) 2501020307 |
TUG BOAT |
FINAL INTACT STABILITY H-077 260408 103231 |
09-Apr-2026 | 1 | - |
| 2 | 68-SCBM/4/2026 |
H - 2019 (FINAL) 2501021443 |
PONTOON |
GIM-2019-C-01 PRELIMINARY STABILITY BOOKLET |
09-Apr-2026 | 1 | - |
| 3 | 82-SCBM/4/2026 |
HULL - 039 (FINAL) 2501020359 |
PONTOON |
H039 - FINAL INTACT STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 4 | 92-SCBM/4/2026 |
HULL - 1380 (FINAL) 2501020646 |
PONTOON |
ASL1380-003 R0 Final Intact Stability |
13-Apr-2026 | 1 | - |
| 5 | 91-SCBM/4/2026 |
PS100229 2401021329 |
TUG BOAT |
FINAL STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 6 | 95-SCBM/4/2026 |
TB - 189 (FINAL) 2501020829 |
TUG BOAT |
LIGHTSHIP DRAFT CALCULATION |
13-Apr-2026 | 1 | - |
| 7 | 83-SCBM/4/2026 |
HULL - 006 (FINAL) 2501021284 |
PONTOON |
H006 - FINAL INTACT STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 8 | 107-SCBM/4/2026 |
MS23 - 001 (BATAM TUG - 01) 2301021321 |
TUG BOAT |
FINAL STABILITY BOOKLET TB BINTANG 006 (MS23-001) |
15-Apr-2026 | 1 | - |
| 9 | 121-SCBM/4/2026 |
HULL - 492 (FINAL) 2501020883 |
PONTOON |
HNO 492 - FINAL STABILITY BOOKLET - NPL 2 |
17-Apr-2026 | 1 | - |
| 10 | 117-SCBM/4/2026 |
KTU - 2100 (FINAL) 2501020596 |
PONTOON |
FINAL INTACT STABILITY BOOKLET-REV 0 |
17-Apr-2026 | 1 | - |
| 11 | 118-SCBM/4/2026 |
KTU - 2101 (FINAL) 2501020592 |
PONTOON |
FINAL INTACT STABILITY BOOKLET-REV 0 |
17-Apr-2026 | 1 | - |
| 12 | 125-SCBM/4/2026 |
H - T842 (FINAL) 2501020475 |
TUG BOAT |
FINAL INTACT STABILITY REPORT |
20-Apr-2026 | 1 | - |
AHMAD ZAKKY, S.T., M.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT |
Multiple Items (11 Gambar) |
11-Mar-2026 | 11 | |
| 1.1 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | TOWING HOOK CONSTRUCTION |
11-Mar-2026 | 1 | |
| 1.2 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | ENGINE FOUNDATION |
11-Mar-2026 | 1 | |
| 1.3 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | GENERAL ARRANGEMENT |
11-Mar-2026 | 1 | |
| 1.4 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | RUDDER AND RUDDER STOCK |
11-Mar-2026 | 1 | |
| 1.5 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | SUPERSTRUCTURE AND DECKHOUSE CONSTRUCTION |
11-Mar-2026 | 1 | |
| 1.6 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | AFTER AND FORE PEAK CONSTRUCTION |
11-Mar-2026 | 1 | |
| 1.7 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | SHELL EXPANSION |
11-Mar-2026 | 1 | |
| 1.8 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | MIDSHIP SECTIONS |
11-Mar-2026 | 1 | |
| 1.9 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | Y BRACKET DETAIL |
11-Mar-2026 | 1 | |
| 1.10 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | TRANSVERSE BULKHEADS |
11-Mar-2026 | 1 | |
| 1.11 | 178-LL/3/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | CONSTRUCTION PROFILE |
11-Mar-2026 | 1 | |
| 2 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON |
Multiple Items (7 Gambar) |
25-Mar-2026 | 7 | |
| 2.1 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | AFTERPEAK CONSTRUCTION |
25-Mar-2026 | 1 | |
| 2.2 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | FOREPEAK CONSTRUCTION |
25-Mar-2026 | 1 | |
| 2.3 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | FRAME SECTION AND BULKHEAD |
25-Mar-2026 | 1 | |
| 2.4 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | CONSTRUCTION PROFILE 01 |
25-Mar-2026 | 1 | |
| 2.5 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | GENERAL ARRANGEMENT |
25-Mar-2026 | 1 | |
| 2.6 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | SHELL EXPANSION |
25-Mar-2026 | 1 | |
| 2.7 | 237-LL/3/2026 |
WINBUILD 1472 2602150010 |
PONTOON | CONSTRUCTION PROFILE 02 |
25-Mar-2026 | 1 | |
| 3 | 4-LL/4/2026 |
AYU 3 2602030047 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
01-Apr-2026 | 3 | |
| 3.1 | 4-LL/4/2026 |
AYU 3 2602030047 |
SELF PROP.OIL BARGE | GENERAL ARRANGEMENT |
01-Apr-2026 | 1 | |
| 3.2 | 4-LL/4/2026 |
AYU 3 2602030047 |
SELF PROP.OIL BARGE | RUDDER & RUDDER STOCK |
01-Apr-2026 | 1 | |
| 3.3 | 4-LL/4/2026 |
AYU 3 2602030047 |
SELF PROP.OIL BARGE | SHELL EXPANSION |
01-Apr-2026 | 1 | |
| 4 | 28-LL/4/2026 |
SARANA LESTARI 06 2503030421 |
WORK BARGE |
PROFILE CONSTRUCTION |
02-Apr-2026 | 1 | - |
| 5 | 37-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON |
Multiple Items (5 Gambar) |
06-Apr-2026 | 5 | |
| 5.1 | 37-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | SKEG DETAILS |
06-Apr-2026 | 1 | |
| 5.2 | 37-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | LASHING PLAN |
06-Apr-2026 | 1 | |
| 5.3 | 37-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | LONG REINFORCEMENT BELOW CONTAINER |
06-Apr-2026 | 1 | |
| 5.4 | 37-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | TRANVS REINFORCEMENT BELOW CONTAINER |
06-Apr-2026 | 1 | |
| 5.5 | 37-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON | WELDING SCHEDULE |
06-Apr-2026 | 1 | |
| 6 | 38-LL/4/2026 |
BG - 065 FINAL 2501020212 |
PONTOON |
GENERAL ARRANGEMENT |
06-Apr-2026 | 1 | - |
| 7 | 80-LL/4/2026 |
SM-136 (FINAL) 2501120134 |
PONTOON |
STOWAGE LASHING ARRANG |
08-Apr-2026 | 1 | - |
| 8 | 99-LL/4/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT |
Multiple Items (4 Gambar) |
09-Apr-2026 | 4 | |
| 8.1 | 99-LL/4/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | X-RAY PLAN |
09-Apr-2026 | 1 | |
| 8.2 | 99-LL/4/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | WELDING SCHEDULE |
09-Apr-2026 | 1 | |
| 8.3 | 99-LL/4/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | DOOR-WINDOW AND SCUTTLES ARRANGEMENT |
09-Apr-2026 | 1 | |
| 8.4 | 99-LL/4/2026 |
TRIALFA 01 (FINAL) 2501030399 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
09-Apr-2026 | 1 |
AKHMAD SYARIFUL ANWAR, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 23-SCSS/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO |
Multiple Items (2 Gambar) |
28-Feb-2026 | 2 | |
| 1.1 | 23-SCSS/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | RL WO0306373 |
28-Feb-2026 | 1 | |
| 1.2 | 23-SCSS/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BPDD85400ESCAPE ROUTES SAFETY EQUIPMENT AND LIFE SAVING APPLIANCES - TOPSIDE LAYOUTEXDE00 |
28-Feb-2026 | 1 | |
| 2 | 30-SC/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP |
PRELIMINARY INTACT STABILITY |
06-Apr-2026 | 1 | - |
| 3 | 144-SC/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 3.1 | 144-SC/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | STABILITY BOOKLET |
14-Apr-2026 | 1 | |
| 3.2 | 144-SC/4/2026 |
SAMUDERA BIRU 07 2502030531 |
SELF PROP.OIL BARGE | CAPACITY PLAN |
14-Apr-2026 | 1 | |
| 4 | 138-SC/4/2026 |
SAMUDERA KENCANA 2501040313 |
RO-RO PASSENGER SHIP |
CAPACITY PLAN AND TANK ARRANGEMENT |
14-Apr-2026 | 1 | - |
| 5 | 171-SC/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 6 | 200-SC/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (2 Gambar) |
20-Apr-2026 | 2 | |
| 6.1 | 200-SC/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | CAPACITY PLAN |
20-Apr-2026 | 1 | |
| 6.2 | 200-SC/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | FINAL INTACT STABILITY BOOKLET |
20-Apr-2026 | 1 | |
| 7 | 199-SC/4/2026 |
MARVELIA 03 2503040317 |
UTILITY VESSEL |
FINAL INTACT STABILITY BOOKLET |
20-Apr-2026 | 1 | - |
ANGGA YUSTIAWAN, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 145-LLBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 1.1 | 145-LLBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 1.2 | 145-LLBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | DECK BOTTOM PLAN |
13-Apr-2026 | 1 | |
| 1.3 | 145-LLBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | BULKHEAD TRANSV SECTION |
13-Apr-2026 | 1 | |
| 1.4 | 145-LLBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 1.5 | 145-LLBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | PROFILE PLAN |
13-Apr-2026 | 1 | |
| 2 | 168-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT |
Multiple Items (4 Gambar) |
15-Apr-2026 | 4 | |
| 2.1 | 168-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 2.2 | 168-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT | TRANSVERSE and BULKHEAD SECTION 4 OF 8 |
15-Apr-2026 | 1 | |
| 2.3 | 168-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT | RUDDER AND STEERING SYSTEM ARRANGEMENT |
15-Apr-2026 | 1 | |
| 2.4 | 168-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT | TRANSVERSE and BULKHEAD SECTION 3 OF 8 |
15-Apr-2026 | 1 | |
| 3 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 3.1 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 3.2 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | TRANSVERSE and BULKHEAD SECTION 3 OF 8 |
15-Apr-2026 | 1 | |
| 3.3 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | TRANSVERSE and BULKHEAD SECTION 7 OF 8 |
15-Apr-2026 | 1 | |
| 3.4 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | TRANSVERSE and BULKHEAD SECTION 4 OF 8 |
15-Apr-2026 | 1 | |
| 3.5 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | RUDDER AND STEERING SYSTEM ARRANGEMENT |
15-Apr-2026 | 1 | |
| 3.6 | 170-LLBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
15-Apr-2026 | 1 | |
| 4 | 169-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT |
TRANSVERSE and BULKHEAD SECTION 7 OF 8 |
15-Apr-2026 | 1 | - |
| 5 | 186-LLBM/4/2026 |
KTU - 2101 (FINAL) 2501020592 |
PONTOON |
FINAL LONGITUDINAL STRENGTH CALCULATION-REV 0 |
16-Apr-2026 | 1 | - |
| 6 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON |
Multiple Items (8 Gambar) |
16-Apr-2026 | 8 | |
| 6.1 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | X-RAY PLAN 1 OF 2 M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.2 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | PROFILE PLAN M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.3 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | DECK BOTTOM PLAN M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.4 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | SHELL EXPANSION M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.5 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | X-RAY PLAN 1 OF 3 M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.6 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | BULKHEAD TRANSVERSAL SECTION M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.7 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | GENERAL ARRANGEMENT M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 6.8 | 173-LLBM/4/2026 |
M - 033 (FINAL) 2601020293 |
PONTOON | WELDING SCHEDULE M-033 230X72X16 |
16-Apr-2026 | 1 | |
| 7 | 179-LLBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT |
STRUCTURAL FIRE PROTECTION |
16-Apr-2026 | 1 | - |
| 8 | 185-LLBM/4/2026 |
KTU - 2100 (FINAL) 2501020596 |
PONTOON |
FINAL LONGITUDINAL STRENGTH CALCULATION-REV 0 |
16-Apr-2026 | 1 | - |
| 9 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE |
Multiple Items (10 Gambar) |
16-Apr-2026 | 10 | |
| 9.1 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | PROFILE PLAN 1-2 |
16-Apr-2026 | 1 | |
| 9.2 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | NDT PLAN 2-2 |
16-Apr-2026 | 1 | |
| 9.3 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | SHELL EXPANSION |
16-Apr-2026 | 1 | |
| 9.4 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | PROFILE PLAN 2-2 |
16-Apr-2026 | 1 | |
| 9.5 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | WELDING SCHEDULE |
16-Apr-2026 | 1 | |
| 9.6 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | NDT PLAN 1-2 |
16-Apr-2026 | 1 | |
| 9.7 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | GENERAL ARRANGEMENT |
16-Apr-2026 | 1 | |
| 9.8 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | DECK INNER BOTTOM PLAN |
16-Apr-2026 | 1 | |
| 9.9 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | DECKHOUSE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 9.10 | 171-LLBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | TRANSVERSAL SECTION |
16-Apr-2026 | 1 |
ARMINDARY ARIEF, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 243-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER |
Multiple Items (4 Gambar) |
19-Feb-2026 | 4 | |
| 1.1 | 243-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | PROFILE CONSTRUCTION 1 OF 2 |
19-Feb-2026 | 1 | |
| 1.2 | 243-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | REINFORCEMENT PLATE |
19-Feb-2026 | 1 | |
| 1.3 | 243-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | COUPLING BLOCK |
19-Feb-2026 | 1 | |
| 1.4 | 243-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | PROFILE CONSTRUCTION 2 OF 2 |
19-Feb-2026 | 1 | |
| 2 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER |
Multiple Items (8 Gambar) |
19-Feb-2026 | 8 | |
| 2.1 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | ENGINE FOUNDATION |
19-Feb-2026 | 1 | |
| 2.2 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | SHELL EXPANSION |
19-Feb-2026 | 1 | |
| 2.3 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | FORE PEAK CONTRUCTION |
19-Feb-2026 | 1 | |
| 2.4 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | SUPERSTRUCTURE |
19-Feb-2026 | 1 | |
| 2.5 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | MIDSHIP SECTION |
19-Feb-2026 | 1 | |
| 2.6 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | AFTER PEAK CONSTRUCTION |
19-Feb-2026 | 1 | |
| 2.7 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | BULKHEAD CONSTRUCTION |
19-Feb-2026 | 1 | |
| 2.8 | 244-LL/2/2026 |
RIVER DRAGON 2502030498 |
DREDGER | GENERAL ARRANGEMENT |
19-Feb-2026 | 1 | |
| 3 | 182-LL/3/2026 |
RUHEN 02 2503030178 |
CREW BOAT |
Multiple Items (5 Gambar) |
11-Mar-2026 | 5 | |
| 3.1 | 182-LL/3/2026 |
RUHEN 02 2503030178 |
CREW BOAT | TRANSVERSE SECTION |
11-Mar-2026 | 1 | |
| 3.2 | 182-LL/3/2026 |
RUHEN 02 2503030178 |
CREW BOAT | PROFILE DECK PLAN |
11-Mar-2026 | 1 | |
| 3.3 | 182-LL/3/2026 |
RUHEN 02 2503030178 |
CREW BOAT | WHEELHOUSE CONSTRUCTION |
11-Mar-2026 | 1 | |
| 3.4 | 182-LL/3/2026 |
RUHEN 02 2503030178 |
CREW BOAT | WELDING SCHEDULE |
11-Mar-2026 | 1 | |
| 3.5 | 182-LL/3/2026 |
RUHEN 02 2503030178 |
CREW BOAT | MIDSHIP SECTION |
11-Mar-2026 | 1 | |
| 4 | 269-LL/3/2026 |
ANUGERAH BERSAMA 9 2603030142 |
SELF PROP.OIL BARGE |
GENERAL ARRANGEMENT |
26-Mar-2026 | 1 | - |
| 5 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT |
Multiple Items (17 Gambar) |
02-Apr-2026 | 17 | |
| 5.1 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | WELDING SCHEDULE |
02-Apr-2026 | 1 | |
| 5.2 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | ENGINE FOUNDATION |
02-Apr-2026 | 1 | |
| 5.3 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | SUPERSTRUCTURE |
02-Apr-2026 | 1 | |
| 5.4 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | MIDSHIP SECTION |
02-Apr-2026 | 1 | |
| 5.5 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | STOWAGE AND LASHING PLAN |
02-Apr-2026 | 1 | |
| 5.6 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | RAMPDOOR CONSTRUCTION |
02-Apr-2026 | 1 | |
| 5.7 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | SKEG CONSTRUCTION |
02-Apr-2026 | 1 | |
| 5.8 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | CONSTRUCTION PROFILE |
02-Apr-2026 | 1 | |
| 5.9 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | SHELL EXPANSION |
02-Apr-2026 | 1 | |
| 5.10 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | STRUCTURAL FIRE PROTECTION |
02-Apr-2026 | 1 | |
| 5.11 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | BULKHEAD SECTION |
02-Apr-2026 | 1 | |
| 5.12 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | WHEEL HOUSE CONSTRUCTION |
02-Apr-2026 | 1 | |
| 5.13 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | AFTER PEAK CONSTRUCTION |
02-Apr-2026 | 1 | |
| 5.14 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | X-RAY PLAN |
02-Apr-2026 | 1 | |
| 5.15 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | FORE PEAK CONSTRUCTION |
02-Apr-2026 | 1 | |
| 5.16 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | GENERAL ARRANGEMENT |
02-Apr-2026 | 1 | |
| 5.17 | 20-LL/4/2026 |
MKR 2501 2601030007 |
LANDING CRAFT | RUDDER AND RUDDER STOCK |
02-Apr-2026 | 1 | |
| 6 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE |
Multiple Items (7 Gambar) |
02-Apr-2026 | 7 | |
| 6.1 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | AFTER PEAK & FORE PEAK CONSTRUCTION |
02-Apr-2026 | 1 | |
| 6.2 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | GENERAL ARRANGEMENT |
02-Apr-2026 | 1 | |
| 6.3 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | PROFILE CONSTRUCTION 2/2 |
02-Apr-2026 | 1 | |
| 6.4 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | SHELL EXPANSION |
02-Apr-2026 | 1 | |
| 6.5 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | PROFILE CONSTRUCTION 1/2 |
02-Apr-2026 | 1 | |
| 6.6 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | TRANSVERSE BULKHEAD |
02-Apr-2026 | 1 | |
| 6.7 | 27-LL/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | FRAME SECTION |
02-Apr-2026 | 1 | |
| 7 | 55-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
Multiple Items (3 Gambar) |
06-Apr-2026 | 3 | |
| 7.1 | 55-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | HATCH COAMING CONSTRUCTION |
06-Apr-2026 | 1 | |
| 7.2 | 55-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | FORECASTLE CONSTRUCTION |
06-Apr-2026 | 1 | |
| 7.3 | 55-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | RUDDER AND RUDDER STOCK |
06-Apr-2026 | 1 | |
| 8 | 74-LL/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT |
Multiple Items (4 Gambar) |
07-Apr-2026 | 4 | |
| 8.1 | 74-LL/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | RUDDER AND RUDDER STOCK DETAIL |
07-Apr-2026 | 1 | |
| 8.2 | 74-LL/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | SHELL EXPANSION |
07-Apr-2026 | 1 | |
| 8.3 | 74-LL/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | MIDSHIP SECTION |
07-Apr-2026 | 1 | |
| 8.4 | 74-LL/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | AFTER PEAK AND FORE PEAK CONSTRUCTION |
07-Apr-2026 | 1 | |
| 9 | 63-LL/4/2026 |
PUTERA PASUNDAN 2604010050 |
OIL BARGE |
Multiple Items (3 Gambar) |
07-Apr-2026 | 3 | |
| 9.1 | 63-LL/4/2026 |
PUTERA PASUNDAN 2604010050 |
OIL BARGE | MIDSHIP SECTION |
07-Apr-2026 | 1 | |
| 9.2 | 63-LL/4/2026 |
PUTERA PASUNDAN 2604010050 |
OIL BARGE | CONSTRUCTION PROFILE |
07-Apr-2026 | 1 | |
| 9.3 | 63-LL/4/2026 |
PUTERA PASUNDAN 2604010050 |
OIL BARGE | GENERAL ARRANGEMENT |
07-Apr-2026 | 1 | |
| 10 | 84-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT |
Multiple Items (4 Gambar) |
08-Apr-2026 | 4 | |
| 10.1 | 84-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | WELDING SCHEDULE |
08-Apr-2026 | 1 | |
| 10.2 | 84-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | DOORS & WINDOWS ARRANGEMENT |
08-Apr-2026 | 1 | |
| 10.3 | 84-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | N.D.T. PLAN |
08-Apr-2026 | 1 | |
| 10.4 | 84-LL/4/2026 |
MITRA BARUNA 7 (FINAL) 2501030582 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
08-Apr-2026 | 1 | |
| 11 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT |
Multiple Items (17 Gambar) |
09-Apr-2026 | 17 | |
| 11.1 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | ENGINE FOUNDATION |
09-Apr-2026 | 1 | |
| 11.2 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | WELDING SCHEDULE |
09-Apr-2026 | 1 | |
| 11.3 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | DOORS-WINDOWS ARRANGEMENT |
09-Apr-2026 | 1 | |
| 11.4 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | TOWING HOOK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 11.5 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | GENERAL ARRANGEMENT |
09-Apr-2026 | 1 | |
| 11.6 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | FORE PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 11.7 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | WHEEL HOUSE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 11.8 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 11.9 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | NDT PLAN |
09-Apr-2026 | 1 | |
| 11.10 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | PROFILE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 11.11 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | RUDDER AND RUDDER STOCK |
09-Apr-2026 | 1 | |
| 11.12 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 11.13 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
09-Apr-2026 | 1 | |
| 11.14 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | BULKHEAD SECTION |
09-Apr-2026 | 1 | |
| 11.15 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | SUPERSTRUCTURE |
09-Apr-2026 | 1 | |
| 11.16 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | SHELL EXPANSION |
09-Apr-2026 | 1 | |
| 11.17 | 104-LL/4/2026 |
HARRY 10 (FINAL) 2601030128 |
TUG BOAT | SKEG CONSTRUCTION |
09-Apr-2026 | 1 | |
| 12 | 95-LL/4/2026 |
DHARMA FERRY - I (APP. DRAWING) 2504040220 |
PASSANGER CAR FERRY |
ENGINE FOUNDATION |
09-Apr-2026 | 1 | - |
| 13 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG |
Multiple Items (12 Gambar) |
10-Apr-2026 | 12 | |
| 13.1 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | |
| 13.2 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SUPER-STRUCTURE |
10-Apr-2026 | 1 | |
| 13.3 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SHELL EXPANSION |
10-Apr-2026 | 1 | |
| 13.4 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | RUDDER STOCK |
10-Apr-2026 | 1 | |
| 13.5 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | AFTER AND FORE PEAK SECTION |
10-Apr-2026 | 1 | |
| 13.6 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | A - FRAME DETAIL |
10-Apr-2026 | 1 | |
| 13.7 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | MIDSHIP SECTIONS |
10-Apr-2026 | 1 | |
| 13.8 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SKEG CONSTRUCTION |
10-Apr-2026 | 1 | |
| 13.9 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | ENGINE FOUNDATION |
10-Apr-2026 | 1 | |
| 13.10 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | TRANSVERSE BULKHEADS |
10-Apr-2026 | 1 | |
| 13.11 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | PROFILE CONSTRUCTIONS |
10-Apr-2026 | 1 | |
| 13.12 | 118-LL/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | TOWING DETAIL AND BOLDER CONSTRUCTION |
10-Apr-2026 | 1 | |
| 14 | 106-LL/4/2026 |
DHARMA FERRY - I (APP. DRAWING) 2504040220 |
PASSANGER CAR FERRY |
GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | - |
| 15 | 128-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
RUDDER STOCK |
13-Apr-2026 | 1 | - |
| 16 | 190-LL/4/2026 |
T - 041 (FINAL) 2501020372 |
WORK BOAT |
STERN FRAME DETAIL |
14-Apr-2026 | 1 | - |
| 17 | 173-LL/4/2026 |
ANTARA 02 2302130025 |
LANDING CRAFT |
windows and side scuttle |
14-Apr-2026 | 1 | - |
| 18 | 164-LL/4/2026 |
ICON MIKHA VI 8 19 2602040001 |
GENERAL CARGO |
LONGITUDINAL STRENGTH CALCULATION |
14-Apr-2026 | 1 | - |
| 19 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER |
Multiple Items (10 Gambar) |
15-Apr-2026 | 10 | |
| 19.1 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | REINFORCEMENT PLATE |
15-Apr-2026 | 1 | |
| 19.2 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 19.3 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | ENGINE FOUNDATION |
15-Apr-2026 | 1 | |
| 19.4 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | SUPERSTRUCTURE |
15-Apr-2026 | 1 | |
| 19.5 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | PROFILE CONSTRUCTION 2 |
15-Apr-2026 | 1 | |
| 19.6 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | AFTER PEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 19.7 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | PROFILE CONSTRUCTION 1 |
15-Apr-2026 | 1 | |
| 19.8 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | FORE PEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 19.9 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 19.10 | 214-LL/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | BULKHEAD CONSTRUCTION |
15-Apr-2026 | 1 | |
| 20 | 238-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
Multiple Items (4 Gambar) |
16-Apr-2026 | 4 | |
| 20.1 | 238-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | DECK HOUSE 1-3 |
16-Apr-2026 | 1 | |
| 20.2 | 238-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | DECK HOUSE 3-3 |
16-Apr-2026 | 1 | |
| 20.3 | 238-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | WHEEL HOUSE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 20.4 | 238-LL/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | DECK HOUSE 2-3 |
16-Apr-2026 | 1 | |
| 21 | 240-LL/4/2026 |
PSS.024 (FINAL) 2601030003 |
TUG BOAT |
TOWING TABLE CONSTRUCTION |
16-Apr-2026 | 1 | - |
| 22 | 284-LL/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
LONGITUDINAL STRENGTH CALCULATIONS |
20-Apr-2026 | 1 | - |
BAMBANG FIRDIANSYAH HADI KUSUMA, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP |
Multiple Items (10 Gambar) |
09-Apr-2026 | 10 | |
| 1.1 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | HACTH COAMING CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.2 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | HATCH COVER |
09-Apr-2026 | 1 | |
| 1.3 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | SHELL EXPANSION |
09-Apr-2026 | 1 | |
| 1.4 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | CARGO HOLD PLAN |
09-Apr-2026 | 1 | |
| 1.5 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 1.6 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | RUDDER ARRANGEMENT |
09-Apr-2026 | 1 | |
| 1.7 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | ENGINE FOUNDATION |
09-Apr-2026 | 1 | |
| 1.8 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | RUDDER STOCK DETAIL |
09-Apr-2026 | 1 | |
| 1.9 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | BULKHEAD CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.10 | 197-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | PROFILE PLAN |
09-Apr-2026 | 1 | |
| 2 | 328-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP |
Multiple Items (2 Gambar) |
09-Apr-2026 | 2 | |
| 2.1 | 328-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | CRANE FOUNDATION |
09-Apr-2026 | 1 | |
| 2.2 | 328-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP | DECK HOUSE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 3 | 220-LL/2/2026 |
MALRIJA 7 2502010541 |
DRY CARGO SHIP |
LONG STRENGTH CALCULATION |
09-Apr-2026 | 1 | - |
| 4 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT |
Multiple Items (20 Gambar) |
10-Apr-2026 | 20 | |
| 4.1 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SHELL EXPANSION |
10-Apr-2026 | 1 | |
| 4.2 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | ANCOR AND HAWSE PIPE DETAIL |
10-Apr-2026 | 1 | |
| 4.3 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | RUDDER CONSTRUCTION |
10-Apr-2026 | 1 | |
| 4.4 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | ENGINE GIRDER DETAIL |
10-Apr-2026 | 1 | |
| 4.5 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | DECKHOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 4.6 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCANTLING SECTION |
10-Apr-2026 | 1 | |
| 4.7 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | EQUIPMENT NUMBER CALCULATION |
10-Apr-2026 | 1 | |
| 4.8 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | MOORING ARRANGEMENT |
10-Apr-2026 | 1 | |
| 4.9 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | WELDING SCHEDULE |
10-Apr-2026 | 1 | |
| 4.10 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | STRUCTURAL PROFILE AND DECK |
10-Apr-2026 | 1 | |
| 4.11 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | WHEELHOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 4.12 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | FUNNEL CONSTRUCTION |
10-Apr-2026 | 1 | |
| 4.13 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SKEG CONSTRUCTION |
10-Apr-2026 | 1 | |
| 4.14 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | BHDS AND FRIME SECTION |
10-Apr-2026 | 1 | |
| 4.15 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | MAST LIGHT DETAIL |
10-Apr-2026 | 1 | |
| 4.16 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | WEATHER TIGHT HATCH LAYOUT AND DETAIL |
10-Apr-2026 | 1 | |
| 4.17 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | |
| 4.18 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | TOWING HOOK PLATFORM DETAIL |
10-Apr-2026 | 1 | |
| 4.19 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | ANCHOR WINDLASS SEATING PLAN |
10-Apr-2026 | 1 | |
| 4.20 | 121-LL/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | ENGINE ROOM PORTABLE PANEL |
10-Apr-2026 | 1 | |
| 5 | 181-LL/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 5.1 | 181-LL/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE | SKEG CONSTRUCTION |
14-Apr-2026 | 1 | |
| 5.2 | 181-LL/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE | CONSTRUCTION PROFILE |
14-Apr-2026 | 1 | |
| 6 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG |
Multiple Items (6 Gambar) |
14-Apr-2026 | 6 | |
| 6.1 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | ENGINE GIRDER AND FOUNDATION 1 OF 2 |
14-Apr-2026 | 1 | |
| 6.2 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | TYPICAL SECTION AND BULKHEAD 1 OF 3 |
14-Apr-2026 | 1 | |
| 6.3 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | ENGINE GIRDER AND FOUNDATION 2 OF 2 |
14-Apr-2026 | 1 | |
| 6.4 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | TYPICAL SECTION AND BULKHEAD 3 OF 3 |
14-Apr-2026 | 1 | |
| 6.5 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | TOWING HOOK DETAIL |
14-Apr-2026 | 1 | |
| 6.6 | 182-LL/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | TYPICAL SECTION AND BULKHEAD 2 OF 3 |
14-Apr-2026 | 1 | |
| 7 | 197-LL/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT |
Multiple Items (5 Gambar) |
15-Apr-2026 | 5 | |
| 7.1 | 197-LL/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | TYP TRANS SECTION BHD |
15-Apr-2026 | 1 | |
| 7.2 | 197-LL/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | PROFILE AND DECK PLAN |
15-Apr-2026 | 1 | |
| 7.3 | 197-LL/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 7.4 | 197-LL/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.5 | 197-LL/4/2026 |
TRD 2601 (DELIVERY) 2601040055 |
CREW BOAT | MIDSHIP SECTION |
15-Apr-2026 | 1 | |
| 8 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT |
Multiple Items (7 Gambar) |
15-Apr-2026 | 7 | |
| 8.1 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | CABIN CONSTRUCTION |
15-Apr-2026 | 1 | |
| 8.2 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | TRANSVERSE BHD |
15-Apr-2026 | 1 | |
| 8.3 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | TRANSVERSE SECTION |
15-Apr-2026 | 1 | |
| 8.4 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | ENGINE FOUNDATION |
15-Apr-2026 | 1 | |
| 8.5 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 8.6 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | PROFILE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 8.7 | 211-LL/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 9 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 9.1 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | TRANSVERSE BULKHEADS |
15-Apr-2026 | 1 | |
| 9.2 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | MIDSHIP SECTION |
15-Apr-2026 | 1 | |
| 9.3 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | PROFILE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 9.4 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | AFTER AND FORE PEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 9.5 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9.6 | 215-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 10 | 230-LL/4/2026 |
KEPRI CORAL JAYA (FINAL) 2501021546 |
PASSENGER SHIP |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 10.1 | 230-LL/4/2026 |
KEPRI CORAL JAYA (FINAL) 2501021546 |
PASSENGER SHIP | STRUCTURAL FIRE PROTECTION |
16-Apr-2026 | 1 | |
| 10.2 | 230-LL/4/2026 |
KEPRI CORAL JAYA (FINAL) 2501021546 |
PASSENGER SHIP | SHAFT BRACKET |
16-Apr-2026 | 1 | |
| 10.3 | 230-LL/4/2026 |
KEPRI CORAL JAYA (FINAL) 2501021546 |
PASSENGER SHIP | RUDDER AND RUDDER STOCK |
16-Apr-2026 | 1 | |
| 11 | 236-LL/4/2026 |
KEPRI CORAL JAYA (FINAL) 2501021546 |
PASSENGER SHIP |
DOOR, WINDOWS AND HATCH ARRANGEMENT |
16-Apr-2026 | 1 | - |
| 12 | 33-LLI/4/2026 |
AST - 1209 (TOC) 2612020325 |
PONTOON |
Multiple Items (4 Gambar) |
16-Apr-2026 | 4 | |
| 12.1 | 33-LLI/4/2026 |
AST - 1209 (TOC) 2612020325 |
PONTOON | FRAMING AND BULKHEAD SECTION |
16-Apr-2026 | 1 | |
| 12.2 | 33-LLI/4/2026 |
AST - 1209 (TOC) 2612020325 |
PONTOON | PROFILE AND DECK |
16-Apr-2026 | 1 | |
| 12.3 | 33-LLI/4/2026 |
AST - 1209 (TOC) 2612020325 |
PONTOON | GENERAL ARRANGEMENT |
16-Apr-2026 | 1 | |
| 12.4 | 33-LLI/4/2026 |
AST - 1209 (TOC) 2612020325 |
PONTOON | SKEG DETAILS |
16-Apr-2026 | 1 | |
| 13 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER |
Multiple Items (19 Gambar) |
17-Apr-2026 | 19 | |
| 13.1 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | POOPDECK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.2 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 13.3 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | AFTER PEAK CONSTRUCTION 2 |
17-Apr-2026 | 1 | |
| 13.4 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | WHELLHOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.5 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | ENGINE GIRDER AND ENGINE ROOM CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.6 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | BOTTOM AND INNER BOTTOM CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.7 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | TRANSV SECTION 1 |
17-Apr-2026 | 1 | |
| 13.8 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | BOW CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.9 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 13.10 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | TRANSV SECTION 2 |
17-Apr-2026 | 1 | |
| 13.11 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | BOW THRUSTER CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.12 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | FOREPEAK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.13 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | TRANSV SECTION 3 |
17-Apr-2026 | 1 | |
| 13.14 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | CONSTRUCTION PROFILE |
17-Apr-2026 | 1 | |
| 13.15 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 13.16 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | AFTERPEAK CONSTRUCTION 1 |
17-Apr-2026 | 1 | |
| 13.17 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | STERN COSNTRUCTION |
17-Apr-2026 | 1 | |
| 13.18 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | SKEG KONSTRUCTION |
17-Apr-2026 | 1 | |
| 13.19 | 268-LL/4/2026 |
GRAHA SEGARA (PKBL NON TOC) 2602020195 |
OIL TANKER | BOAT DECK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 14 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT |
Multiple Items (11 Gambar) |
17-Apr-2026 | 11 | |
| 14.1 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | ZINC ANODE ARRANGEMENT |
17-Apr-2026 | 1 | |
| 14.2 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | WELDING SCHEDULLE |
17-Apr-2026 | 1 | |
| 14.3 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | DECK HOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 14.4 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | TOWING AND BOLDER CONSTRUCTION |
17-Apr-2026 | 1 | |
| 14.5 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | FIRE PROTECTION INSULATION PLAN |
17-Apr-2026 | 1 | |
| 14.6 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | KORT NOZZLE DETAIL |
17-Apr-2026 | 1 | |
| 14.7 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | ENGINE FOUNDATION |
17-Apr-2026 | 1 | |
| 14.8 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | RUDDER AND RUDDER STOCK |
17-Apr-2026 | 1 | |
| 14.9 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | X-RAY PLAN |
17-Apr-2026 | 1 | |
| 14.10 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | DOOR WINDOW AND SCUTTLE ARRANGEMENT |
17-Apr-2026 | 1 | |
| 14.11 | 242-LL/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | SKEG CONSTRUCTION |
17-Apr-2026 | 1 | |
| 15 | 259-LL/4/2026 |
WDS WINDSOR I 2603030168 |
CREW BOAT |
GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 16 | 269-LL/4/2026 |
HULL 038 2401030410 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 17 | 270-LL/4/2026 |
HULL 041 2401030407 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 18 | 272-LL/4/2026 |
HULL 045 2501030058 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 19 | 264-LL/4/2026 |
KEPRI CORAL JAYA (FINAL) 2501021546 |
PASSENGER SHIP |
LONGITUDINAL STRENGTH CALCULATION |
17-Apr-2026 | 1 | - |
| 20 | 287-LL/4/2026 |
HULL 039 2401030409 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 21 | 288-LL/4/2026 |
HULL 040 2401030408 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 22 | 290-LL/4/2026 |
HULL 043 2401030416 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 23 | 289-LL/4/2026 |
HULL 042 2401030406 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 24 | 292-LL/4/2026 |
HULL 046 2501030051 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 25 | 291-LL/4/2026 |
HULL 044 2501030036 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
DENY CAHYO NUGROHO, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 60-ML/4/2026 |
SYAFIRA FIVE 2402120004 |
TUG BOAT |
AC-DC ELECTRICAL WIRING DIAGRAM |
09-Apr-2026 | 1 | - |
| 2 | 69-ML/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG |
Multiple Items (3 Gambar) |
10-Apr-2026 | 3 | |
| 2.1 | 69-ML/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | MSB |
10-Apr-2026 | 1 | |
| 2.2 | 69-ML/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | BALANCE DAYA |
10-Apr-2026 | 1 | |
| 2.3 | 69-ML/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | WIRING DIAGRAM |
10-Apr-2026 | 1 | |
| 3 | 72-ML/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER |
Multiple Items (3 Gambar) |
10-Apr-2026 | 3 | |
| 3.1 | 72-ML/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | POWER LOAD CALCULATION BOOK |
10-Apr-2026 | 1 | |
| 3.2 | 72-ML/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | MAIN CABLE PATTERN |
10-Apr-2026 | 1 | |
| 3.3 | 72-ML/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | SINGLE LINE DIAGRAM OF THE MAIN SWITCHBOARD |
10-Apr-2026 | 1 | |
| 4 | 67-ML/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT |
Multiple Items (2 Gambar) |
10-Apr-2026 | 2 | |
| 4.1 | 67-ML/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | POWER BALANCE |
10-Apr-2026 | 1 | |
| 4.2 | 67-ML/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | WIRING DIAGRAM |
10-Apr-2026 | 1 | |
| 5 | 77-ML/4/2026 |
MS23 - 001 (BATAM TUG - 01) 2301021321 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 5.1 | 77-ML/4/2026 |
MS23 - 001 (BATAM TUG - 01) 2301021321 |
TUG BOAT | ELECTRICAL SCHEMATIC CIRCUIT DIAGRAM |
13-Apr-2026 | 1 | |
| 5.2 | 77-ML/4/2026 |
MS23 - 001 (BATAM TUG - 01) 2301021321 |
TUG BOAT | MAIN SWITCHBOARD |
13-Apr-2026 | 1 | |
| 6 | 85-ML/4/2026 |
SULTAN 38 2602030135 |
CREW BOAT |
WIRING DIAGRAM |
13-Apr-2026 | 1 | - |
| 7 | 82-ML/4/2026 |
MS23 - 002 (BATAM TUG - 02) 2301021320 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 7.1 | 82-ML/4/2026 |
MS23 - 002 (BATAM TUG - 02) 2301021320 |
TUG BOAT | ELECTRICAL SCH CIRCUIT DIAGRAM |
13-Apr-2026 | 1 | |
| 7.2 | 82-ML/4/2026 |
MS23 - 002 (BATAM TUG - 02) 2301021320 |
TUG BOAT | MAIN SWITCHBOARD |
13-Apr-2026 | 1 | |
| 8 | 78-ML/4/2026 |
SAHOYA 07 2501070075 |
OIL BARGE |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 8.1 | 78-ML/4/2026 |
SAHOYA 07 2501070075 |
OIL BARGE | ELECTRIC LOAD CALCULATION |
13-Apr-2026 | 1 | |
| 8.2 | 78-ML/4/2026 |
SAHOYA 07 2501070075 |
OIL BARGE | SINGLE LINE DIAGRAM |
13-Apr-2026 | 1 | |
| 9 | 81-ML/4/2026 |
ENTEBE MEGASTAR 73 2412140019 |
TUG BOAT |
WIRING DIAGRAM |
13-Apr-2026 | 1 | - |
| 10 | 75-ML/4/2026 |
HULL - 178 2401021408 |
TUG BOAT |
SCHEMATIC WIRING DIAGRAM |
13-Apr-2026 | 1 | - |
| 11 | 84-ML/4/2026 |
SSM - I W (FINAL) 2501020559 |
TUG BOAT |
SSM - I W - R0 - MAIN SWITCHBOARD PANEL |
13-Apr-2026 | 1 | - |
| 12 | 76-ML/4/2026 |
HULL - 184 FINAL 2501020129 |
TUG BOAT |
SCHEMATIC WIRING DIAGRAM |
13-Apr-2026 | 1 | - |
| 13 | 96-ML/4/2026 |
HULL - 112 (FINAL) 2501021403 |
CPO BARGE |
H-112 ELECTRIC LOAD BALANCE |
14-Apr-2026 | 1 | - |
| 14 | 99-ML/4/2026 |
H - 555 (FINAL) 2601020007 |
OIL BARGE |
MSB WIRING DIAGRAM |
14-Apr-2026 | 1 | - |
| 15 | 115-ML/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 15.1 | 115-ML/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 15.2 | 115-ML/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | MSB DIAGRAM |
15-Apr-2026 | 1 | |
| 15.3 | 115-ML/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 16 | 108-ML/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 16.1 | 108-ML/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | MAIN SWITCHBOARD |
15-Apr-2026 | 1 | |
| 16.2 | 108-ML/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 16.3 | 108-ML/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 17 | 112-ML/4/2026 |
MILLENIUM STAR 2603020316 |
OIL BARGE |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 17.1 | 112-ML/4/2026 |
MILLENIUM STAR 2603020316 |
OIL BARGE | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 17.2 | 112-ML/4/2026 |
MILLENIUM STAR 2603020316 |
OIL BARGE | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 17.3 | 112-ML/4/2026 |
MILLENIUM STAR 2603020316 |
OIL BARGE | MAIN SWITCHBOARD |
15-Apr-2026 | 1 | |
| 18 | 111-ML/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT |
NAVIGATION LIGHT ARRANGEMENT |
15-Apr-2026 | 1 | - |
| 19 | 132-ML/4/2026 |
MUTIARA INDAH XI 2603020317 |
BARGE |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 19.1 | 132-ML/4/2026 |
MUTIARA INDAH XI 2603020317 |
BARGE | MAIN SWITCHBOARD |
16-Apr-2026 | 1 | |
| 19.2 | 132-ML/4/2026 |
MUTIARA INDAH XI 2603020317 |
BARGE | WIRING DIAGRAM |
16-Apr-2026 | 1 | |
| 19.3 | 132-ML/4/2026 |
MUTIARA INDAH XI 2603020317 |
BARGE | POWER BALANCE CALCULATION |
16-Apr-2026 | 1 | |
| 20 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE |
Multiple Items (9 Gambar) |
16-Apr-2026 | 9 | |
| 20.1 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 09 - Emergency Stop Single Line Diagram |
16-Apr-2026 | 1 | |
| 20.2 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 03 - Fire Detection and Alarm Single Line Diagram |
16-Apr-2026 | 1 | |
| 20.3 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 02 - Single Line Diagram |
16-Apr-2026 | 1 | |
| 20.4 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 10 - Power Load Balance |
16-Apr-2026 | 1 | |
| 20.5 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 07 - Emergency Lighting Wiring Diagram |
16-Apr-2026 | 1 | |
| 20.6 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 08 - PTO Schematic Diagram |
16-Apr-2026 | 1 | |
| 20.7 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 04 - High Level Alarm Single Line Diagram |
16-Apr-2026 | 1 | |
| 20.8 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 06 - Cargo Engine Emergency Stop Schematic Diagram |
16-Apr-2026 | 1 | |
| 20.9 | 130-ML/4/2026 |
H - 081 FINAL 2501020131 |
PALM OIL BARGE | H 081-E 05 - Bilge and Fuel Oil Alarm Schematic Diagram |
16-Apr-2026 | 1 | |
| 21 | 125-ML/4/2026 |
PS1 - 00056 (FINAL) 2501021421 |
TUG BOAT |
PS1-00056 |
16-Apr-2026 | 1 | - |
| 22 | 141-ML/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 22.1 | 141-ML/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 22.2 | 141-ML/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | BALANCE DAYA |
17-Apr-2026 | 1 | |
| 22.3 | 141-ML/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | MAIN SWITCHBOARD |
17-Apr-2026 | 1 | |
| 23 | 148-ML/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 23.1 | 148-ML/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | MAIN SWITCHBOARD |
17-Apr-2026 | 1 | |
| 23.2 | 148-ML/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | POWER BALANCE DAYA |
17-Apr-2026 | 1 | |
| 23.3 | 148-ML/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 24 | 135-ML/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 24.1 | 135-ML/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | SINGLE LINE DIAGRAM OF MAIN SWITCHBOARD |
17-Apr-2026 | 1 | |
| 24.2 | 135-ML/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | PRIMARY POWER SYSTEM DIAGRAM |
17-Apr-2026 | 1 | |
| 24.3 | 135-ML/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | ELECTRICAL POWER BALANCE |
17-Apr-2026 | 1 | |
| 25 | 136-ML/4/2026 |
HULL - 373 (FINAL) 2501021113 |
CPO BARGE |
H373-BCM-E-03-R1-MSB WIRING DIAGRAM |
17-Apr-2026 | 1 | - |
| 26 | 150-ML/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE |
Multiple Items (4 Gambar) |
20-Apr-2026 | 4 | |
| 26.1 | 150-ML/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | SINGLE LINE WIRING DIAGRAM |
20-Apr-2026 | 1 | |
| 26.2 | 150-ML/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | ELECTRICAL ARRANGEMENT |
20-Apr-2026 | 1 | |
| 26.3 | 150-ML/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | POWER BALANCE CALCULATION |
20-Apr-2026 | 1 | |
| 26.4 | 150-ML/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE | MSB WIRING DIAGRAM |
20-Apr-2026 | 1 |
DIAN FEBRIAN, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 9-SCSS/4/2026 |
MEGUMI (APPROVAL PRB) 2605010134 |
PASSENGER SHIP |
SAFETY AND FIRE CONTROL PLAN |
16-Apr-2026 | 1 | - |
| 2 | 174-SC/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 3 | 181-SC/4/2026 |
TUG BOAT 27 METER (PHL-144) 2301050009 |
TUG BOAT |
TANK CAPACITY PLAN |
17-Apr-2026 | 1 | - |
| 4 | 182-SC/4/2026 |
TUG BOAT 27 METER (PHL-144) 2301050009 |
TUG BOAT |
FINAL STABILITY |
17-Apr-2026 | 1 | - |
DWIANA GALUH LISTIYARINI, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (25 Gambar) |
25-Mar-2026 | 25 | |
| 1.1 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 3 OF 3 |
25-Mar-2026 | 1 | |
| 1.2 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | SHELL EXPANSION |
25-Mar-2026 | 1 | |
| 1.3 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 7 OF 7 |
25-Mar-2026 | 1 | |
| 1.4 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 4 OF 7 |
25-Mar-2026 | 1 | |
| 1.5 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | NDT PLAN |
25-Mar-2026 | 1 | |
| 1.6 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 1 OF 3 |
25-Mar-2026 | 1 | |
| 1.7 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 5 OF 7 |
25-Mar-2026 | 1 | |
| 1.8 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | ENGINE CASING |
25-Mar-2026 | 1 | |
| 1.9 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 1 OF 7 |
25-Mar-2026 | 1 | |
| 1.10 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 2 OF 2 |
25-Mar-2026 | 1 | |
| 1.11 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | RUDDER ASSEMBLY |
25-Mar-2026 | 1 | |
| 1.12 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | AFTER AND FORE PEAK CONSTRUCTION 2 OF 2 |
25-Mar-2026 | 1 | |
| 1.13 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT 1 OF 2 |
25-Mar-2026 | 1 | |
| 1.14 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 2 OF 7 |
25-Mar-2026 | 1 | |
| 1.15 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | ENGINE GIRDER |
25-Mar-2026 | 1 | |
| 1.16 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | STRUCTURAL FIRE PROTECTION |
25-Mar-2026 | 1 | |
| 1.17 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 2 OF 3 |
25-Mar-2026 | 1 | |
| 1.18 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 6 OF 7 |
25-Mar-2026 | 1 | |
| 1.19 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | WELDING SCHEDULE |
25-Mar-2026 | 1 | |
| 1.20 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT 2 OF 2 |
25-Mar-2026 | 1 | |
| 1.21 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | MIDSHIP SECTION |
25-Mar-2026 | 1 | |
| 1.22 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 3 OF 7 |
25-Mar-2026 | 1 | |
| 1.23 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 1 OF 2 |
25-Mar-2026 | 1 | |
| 1.24 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | AFTER AND FORE PEAK CONSTRUCTION 1 OF 2 |
25-Mar-2026 | 1 | |
| 1.25 | 232-LL/3/2026 |
PUTRI BATAM 1 (FINAL) 2601020212 |
HIGH SPEED PASSANGER VESSEL | DOOR AND HATCH ARRANGEMENT |
25-Mar-2026 | 1 | |
| 2 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (25 Gambar) |
25-Mar-2026 | 25 | |
| 2.1 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 3 OF 3 |
25-Mar-2026 | 1 | |
| 2.2 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 7 OF 7 |
25-Mar-2026 | 1 | |
| 2.3 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | NDT PLAN |
25-Mar-2026 | 1 | |
| 2.4 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT 2 OF 2 |
25-Mar-2026 | 1 | |
| 2.5 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 3 OF 7 |
25-Mar-2026 | 1 | |
| 2.6 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | AFTER AND FORE PEAK CONSTRUCTION 1 OF 2 |
25-Mar-2026 | 1 | |
| 2.7 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | MIDSHIP SECTION |
25-Mar-2026 | 1 | |
| 2.8 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 1 OF 2 |
25-Mar-2026 | 1 | |
| 2.9 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | DOOR AND HATCH ARRANGEMENT |
25-Mar-2026 | 1 | |
| 2.10 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 1 OF 3 |
25-Mar-2026 | 1 | |
| 2.11 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 5 OF 7 |
25-Mar-2026 | 1 | |
| 2.12 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | ENGINE CASING |
25-Mar-2026 | 1 | |
| 2.13 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | SHELL EXPANSION |
25-Mar-2026 | 1 | |
| 2.14 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 4 OF 7 |
25-Mar-2026 | 1 | |
| 2.15 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | AFTER AND FORE PEAK CONSTRUCTION 2 OF 2 |
25-Mar-2026 | 1 | |
| 2.16 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE 2 OF 3 |
25-Mar-2026 | 1 | |
| 2.17 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 6 OF 7 |
25-Mar-2026 | 1 | |
| 2.18 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 1 OF 7 |
25-Mar-2026 | 1 | |
| 2.19 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | WELDING SCHEDULE |
25-Mar-2026 | 1 | |
| 2.20 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 2 OF 2 |
25-Mar-2026 | 1 | |
| 2.21 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | RUDDER ASSEMBLY |
25-Mar-2026 | 1 | |
| 2.22 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT 1 OF 2 |
25-Mar-2026 | 1 | |
| 2.23 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | FRAME SECTION 2 OF 7 |
25-Mar-2026 | 1 | |
| 2.24 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | ENGINE GIRDER |
25-Mar-2026 | 1 | |
| 2.25 | 250-LL/3/2026 |
PUTRI BATAM 2 (FINAL) 2601020211 |
HIGH SPEED PASSANGER VESSEL | STRUCTURAL FIRE PROTECTION |
25-Mar-2026 | 1 | |
| 3 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY |
Multiple Items (26 Gambar) |
25-Mar-2026 | 26 | |
| 3.1 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | MIDSHIP SECTIONS PLAN |
25-Mar-2026 | 1 | |
| 3.2 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | ENGINE ROOM AND TAIL SECTIONS PLAN (FR.23-FR.51) |
25-Mar-2026 | 1 | |
| 3.3 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | AFT VEHICLE RAMP STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.4 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | GENERAL ARRANGEMENT PLAN |
25-Mar-2026 | 1 | |
| 3.5 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | UPPER DECK AND LOWER WALL STRUCTURE |
25-Mar-2026 | 1 | |
| 3.6 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | NAVIGATION DECK AND LOWER WALL STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.7 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | INSULATION & DECK COVER ARRANGEMENT |
25-Mar-2026 | 1 | |
| 3.8 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | SCANTLING PROFILE STRUCTURE |
25-Mar-2026 | 1 | |
| 3.9 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | MAIN & GEAR BOX BASE STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.10 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | RUDDER ARRANGEMENT |
25-Mar-2026 | 1 | |
| 3.11 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | W.T. TRANS. BHD SECTIONS PLAN |
25-Mar-2026 | 1 | |
| 3.12 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | COMPASS DECK AND LOWER WALL STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.13 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | LONGITUDINAL STRENGTH CALCULATION |
25-Mar-2026 | 1 | |
| 3.14 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | VEHICLE LOADING ARRANGEMENT PLAN |
25-Mar-2026 | 1 | |
| 3.15 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | TRAN. SECTIONS PLAN (FR.51-FR.137) |
25-Mar-2026 | 1 | |
| 3.16 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | STERN FRAME |
25-Mar-2026 | 1 | |
| 3.17 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | VEHICLE SECURING DEVICE ARRANGEMENT PLAN |
25-Mar-2026 | 1 | |
| 3.18 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | FORE TRANS. & STEM POST SECTIONS |
25-Mar-2026 | 1 | |
| 3.19 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | PASSENGER DECK AND LOWER WALL STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.20 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | FIRE SUBDIVISION PLAN |
25-Mar-2026 | 1 | |
| 3.21 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | SHELL EXPANSION PLAN |
25-Mar-2026 | 1 | |
| 3.22 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | MID. VEHICLE RAMP STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.23 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | RUDDER STOCK |
25-Mar-2026 | 1 | |
| 3.24 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | AFTER TRANS. SECTIONS PLAN (AE - FR.23) |
25-Mar-2026 | 1 | |
| 3.25 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | FORE VEHICLE RAMP STRUCTURE PLAN |
25-Mar-2026 | 1 | |
| 3.26 | 252-LL/3/2026 |
KMP MEGUMI (PKBL) 2602010111 |
PASSANGER CAR FERRY | RUDDER BLADE |
25-Mar-2026 | 1 | |
| 4 | 61-LL/4/2026 |
SPM 12.500 DWT 2402360012 |
SINGLE POINT MOORING |
TURNTABLE - LANDING BOAT |
07-Apr-2026 | 1 | - |
| 5 | 141-LL/4/2026 |
FERRY 82 M DLU (NEW BUILDING - DELIVERY / FINAL) 2601040002 |
RO-RO PASSENGER SHIP |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 5.1 | 141-LL/4/2026 |
FERRY 82 M DLU (NEW BUILDING - DELIVERY / FINAL) 2601040002 |
RO-RO PASSENGER SHIP | FORE PEAK CONSTRUCTION |
13-Apr-2026 | 1 | |
| 5.2 | 141-LL/4/2026 |
FERRY 82 M DLU (NEW BUILDING - DELIVERY / FINAL) 2601040002 |
RO-RO PASSENGER SHIP | AFTER PEAK CONSTRUCTION |
13-Apr-2026 | 1 | |
| 6 | 186-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE |
WELDING SCHEDULE |
14-Apr-2026 | 1 | - |
| 7 | 32-LLI/4/2026 |
FLY POWER 2702 (TOC) 2612020288 |
PONTOON |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 7.1 | 32-LLI/4/2026 |
FLY POWER 2702 (TOC) 2612020288 |
PONTOON | CONSTRUCTION PROFILE |
15-Apr-2026 | 1 | |
| 7.2 | 32-LLI/4/2026 |
FLY POWER 2702 (TOC) 2612020288 |
PONTOON | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 8 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 8.1 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | CONSTRUCTION PROFILE |
15-Apr-2026 | 1 | |
| 8.2 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | SHELL EXPANSION |
15-Apr-2026 | 1 | |
| 8.3 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | BULKHEAD CONSTRUCTION |
15-Apr-2026 | 1 | |
| 8.4 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | ENGINE FOUNDATION |
15-Apr-2026 | 1 | |
| 8.5 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | MIDSHIP SECTION |
15-Apr-2026 | 1 | |
| 8.6 | 210-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9 | 212-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE |
RADIOGRAPHY PLAN |
15-Apr-2026 | 1 | - |
| 10 | 220-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER |
Multiple Items (4 Gambar) |
16-Apr-2026 | 4 | |
| 10.1 | 220-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | FORECASTLE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 10.2 | 220-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | POOP DECK CONSTRUCTION |
16-Apr-2026 | 1 | |
| 10.3 | 220-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | FOREPEAK CONSTRUCTION |
16-Apr-2026 | 1 | |
| 10.4 | 220-LL/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | AFTER PEAK CONSTRUCTION |
16-Apr-2026 | 1 | |
| 11 | 34-LLI/4/2026 |
OCEAN PHOENIX (PKBL TOCA) 2612120033 |
BULK CARRIER |
HATCH COVER REPAIR PLAN OF ROLLING STOPPER |
17-Apr-2026 | 1 | - |
| 12 | 248-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 12.1 | 248-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | DECK HOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 12.2 | 248-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | WINDOWS AND SCUTLLEARRANGEMENT |
17-Apr-2026 | 1 | |
| 12.3 | 248-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | SKEG CONSTRUCTION AND DETAIL |
17-Apr-2026 | 1 | |
| 12.4 | 248-LL/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | WEATHER AND WATERTIGHT DOOR ARRG |
17-Apr-2026 | 1 | |
| 13 | 249-LL/4/2026 |
RUN JI 9 (TOC) 2602020304 |
OIL TANKER |
GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 14 | 35-LLI/4/2026 |
NOVAH (DRAWING APPROVAL) 2605090072 |
OIL / CHEMICAL TANKER |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 14.1 | 35-LLI/4/2026 |
NOVAH (DRAWING APPROVAL) 2605090072 |
OIL / CHEMICAL TANKER | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 14.2 | 35-LLI/4/2026 |
NOVAH (DRAWING APPROVAL) 2605090072 |
OIL / CHEMICAL TANKER | CONSTRUCTION PROFILE AND DECK PLAN |
17-Apr-2026 | 1 | |
| 14.3 | 35-LLI/4/2026 |
NOVAH (DRAWING APPROVAL) 2605090072 |
OIL / CHEMICAL TANKER | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 14.4 | 35-LLI/4/2026 |
NOVAH (DRAWING APPROVAL) 2605090072 |
OIL / CHEMICAL TANKER | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 15 | 250-LL/4/2026 |
RUN JI 9 (TOC) 2602020304 |
OIL TANKER |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 15.1 | 250-LL/4/2026 |
RUN JI 9 (TOC) 2602020304 |
OIL TANKER | CONSTRUCTION PROFILE |
17-Apr-2026 | 1 | |
| 15.2 | 250-LL/4/2026 |
RUN JI 9 (TOC) 2602020304 |
OIL TANKER | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 15.3 | 250-LL/4/2026 |
RUN JI 9 (TOC) 2602020304 |
OIL TANKER | TYPICAL SECTION |
17-Apr-2026 | 1 | |
| 15.4 | 250-LL/4/2026 |
RUN JI 9 (TOC) 2602020304 |
OIL TANKER | BULKHEAD CONSTRUCTION |
17-Apr-2026 | 1 | |
| 16 | 36-LLI/4/2026 |
PRIMA SAKTI 80 (PKBL TOC) 2612030166 |
PONTOON |
Multiple Items (3 Gambar) |
20-Apr-2026 | 3 | |
| 16.1 | 36-LLI/4/2026 |
PRIMA SAKTI 80 (PKBL TOC) 2612030166 |
PONTOON | GENERAL ARRANGEMENT |
20-Apr-2026 | 1 | |
| 16.2 | 36-LLI/4/2026 |
PRIMA SAKTI 80 (PKBL TOC) 2612030166 |
PONTOON | CONSTRUCTION PLAN |
20-Apr-2026 | 1 | |
| 16.3 | 36-LLI/4/2026 |
PRIMA SAKTI 80 (PKBL TOC) 2612030166 |
PONTOON | SHELL EXPANSION |
20-Apr-2026 | 1 | |
| 17 | 37-LLI/4/2026 |
ANTA GEMILANG 3301 (PKBL TOC) 2612030167 |
PONTOON |
Multiple Items (3 Gambar) |
20-Apr-2026 | 3 | |
| 17.1 | 37-LLI/4/2026 |
ANTA GEMILANG 3301 (PKBL TOC) 2612030167 |
PONTOON | SHELL EXPANSION |
20-Apr-2026 | 1 | |
| 17.2 | 37-LLI/4/2026 |
ANTA GEMILANG 3301 (PKBL TOC) 2612030167 |
PONTOON | CONSTRUCTION PLAN |
20-Apr-2026 | 1 | |
| 17.3 | 37-LLI/4/2026 |
ANTA GEMILANG 3301 (PKBL TOC) 2612030167 |
PONTOON | GENERAL ARRANGEMENT |
20-Apr-2026 | 1 |
FACHRUDDIN, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO |
Multiple Items (17 Gambar) |
26-Mar-2026 | 17 | |
| 1.1 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | TYPICAL TRANSVESE BULKHEAD |
26-Mar-2026 | 1 | |
| 1.2 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | MIDSHIP SECTION |
26-Mar-2026 | 1 | |
| 1.3 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | STERN CONSTRUCTION |
26-Mar-2026 | 1 | |
| 1.4 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | RUDDER ASSEMBLY |
26-Mar-2026 | 1 | |
| 1.5 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | AFTER PEAK CONSTRUCTION |
26-Mar-2026 | 1 | |
| 1.6 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | TYPICAL HATCH END COAMING |
26-Mar-2026 | 1 | |
| 1.7 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | SHELL EXPANSION |
26-Mar-2026 | 1 | |
| 1.8 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | HATCH COAMING |
26-Mar-2026 | 1 | |
| 1.9 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | PROFILE CONSTRUCTION (2) |
26-Mar-2026 | 1 | |
| 1.10 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | ENGINE FOUNDATION |
26-Mar-2026 | 1 | |
| 1.11 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | FRAME SECTION AT ENGINE ROOM |
26-Mar-2026 | 1 | |
| 1.12 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | GENERAL ARRANGEMENT |
26-Mar-2026 | 1 | |
| 1.13 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | FORE PEAK CONSTRUCTION |
26-Mar-2026 | 1 | |
| 1.14 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | RUDDER STOCK DETAILS |
26-Mar-2026 | 1 | |
| 1.15 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | PROFILE CONSTRUCTION (1) |
26-Mar-2026 | 1 | |
| 1.16 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | FORE PEAK CONSTRUCTION (FRAME SECTION) |
26-Mar-2026 | 1 | |
| 1.17 | 281-LL/3/2026 |
LEGENDA SAMUDERA 666 2602070003 |
GENERAL CARGO | RUDDER BLADE |
26-Mar-2026 | 1 | |
| 2 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER |
Multiple Items (20 Gambar) |
30-Mar-2026 | 20 | |
| 2.1 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | GENERAL ARRANGEMENT |
30-Mar-2026 | 1 | |
| 2.2 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | FORE PEAK CONSTRUCTION (2) |
30-Mar-2026 | 1 | |
| 2.3 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | RUDDER ASSEMBLY |
30-Mar-2026 | 1 | |
| 2.4 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | SHELL EXPANSION |
30-Mar-2026 | 1 | |
| 2.5 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | BOAT DECK CONSTRUCTION |
30-Mar-2026 | 1 | |
| 2.6 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | FORE PEAK CONSTRUCTION (1) |
30-Mar-2026 | 1 | |
| 2.7 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | PROFILE CONSTRUCTION (1) |
30-Mar-2026 | 1 | |
| 2.8 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | AFTER PEAK CONSTRUCTION (1) |
30-Mar-2026 | 1 | |
| 2.9 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | RUDDER BLADE |
30-Mar-2026 | 1 | |
| 2.10 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | TRANSVERSE BULKHEAD (I.W.O. PUMP ROOM) |
30-Mar-2026 | 1 | |
| 2.11 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | COMPASS DECK CONSTRUCTION |
30-Mar-2026 | 1 | |
| 2.12 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | PROFILE CONSTRUCTION (2) |
30-Mar-2026 | 1 | |
| 2.13 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | AFTER PEAK CONSTRUCTION (2) |
30-Mar-2026 | 1 | |
| 2.14 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | RUDDER STOCK |
30-Mar-2026 | 1 | |
| 2.15 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | TRANSVERSE BULKHEAD (I.W.O. C.O.T) |
30-Mar-2026 | 1 | |
| 2.16 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | NAV. BRIDGE DECK CONSTRUCTION |
30-Mar-2026 | 1 | |
| 2.17 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | FORECASTLE DECK CONSTRUCTION |
30-Mar-2026 | 1 | |
| 2.18 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | MIDSHIP SECTION |
30-Mar-2026 | 1 | |
| 2.19 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | POOP DECK CONSTRUCTION |
30-Mar-2026 | 1 | |
| 2.20 | 304-LL/3/2026 |
BARONGKO 2602030143 |
OIL TANKER | ENGINE FOUNDATION |
30-Mar-2026 | 1 | |
| 3 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE |
Multiple Items (7 Gambar) |
31-Mar-2026 | 7 | |
| 3.1 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | GENERAL ARRANGEMENT |
31-Mar-2026 | 1 | |
| 3.2 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | TRANSVERSE SECTION |
31-Mar-2026 | 1 | |
| 3.3 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | SHELL EXPANSION |
31-Mar-2026 | 1 | |
| 3.4 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | CONSTRUCTION PROFILE 1 OF 2 |
31-Mar-2026 | 1 | |
| 3.5 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | TRANSVERSE BULKHEAD |
31-Mar-2026 | 1 | |
| 3.6 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | CONSTRUCTION PROFILE 2 OF 2 |
31-Mar-2026 | 1 | |
| 3.7 | 309-LL/3/2026 |
WIN 001 2502150041 |
SELF PROP.OIL BARGE | ENGINE FOUNDATION |
31-Mar-2026 | 1 | |
| 4 | 18-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP |
Multiple Items (2 Gambar) |
02-Apr-2026 | 2 | |
| 4.1 | 18-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP | FWD RAMPDOOR CONSTRUCTION |
02-Apr-2026 | 1 | |
| 4.2 | 18-LL/4/2026 |
KMP. 2025 2501130016 |
PASSENGER SHIP | AFTER RAMPDOOR CONSTRUCTION |
02-Apr-2026 | 1 | |
| 5 | 16-LL/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO |
Multiple Items (2 Gambar) |
02-Apr-2026 | 2 | |
| 5.1 | 16-LL/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | GENERAL ARRANGEMENT 1 OF 2 |
02-Apr-2026 | 1 | |
| 5.2 | 16-LL/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | GENERAL ARRANGEMENT 2 OF 2 |
02-Apr-2026 | 1 | |
| 6 | 52-LL/4/2026 |
LUCKY STAR 88 2604180020 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
06-Apr-2026 | 2 | |
| 6.1 | 52-LL/4/2026 |
LUCKY STAR 88 2604180020 |
GENERAL CARGO | CONSTRUCTION PROFILE |
06-Apr-2026 | 1 | |
| 6.2 | 52-LL/4/2026 |
LUCKY STAR 88 2604180020 |
GENERAL CARGO | GENERAL ARRANGEMENT |
06-Apr-2026 | 1 | |
| 7 | 39-LL/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT |
GENERAL ARRANGEMENT |
06-Apr-2026 | 1 | - |
| 8 | 2-LLSS/4/2026 |
MY STAR 2604170006 |
LANDING CRAFT |
CARGO SECURING MANUAL |
06-Apr-2026 | 1 | - |
| 9 | 53-LL/4/2026 |
BHIMA GIRI NUSA (APP. DRAWING) 2504040240 |
LANDING CRAFT |
MIDSHIP SECTION |
06-Apr-2026 | 1 | - |
| 10 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (7 Gambar) |
07-Apr-2026 | 7 | |
| 10.1 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | ENGINE FOUNDATION |
07-Apr-2026 | 1 | |
| 10.2 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | TRANSVERSE BULKHEAD |
07-Apr-2026 | 1 | |
| 10.3 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | SHELL EXPANSION |
07-Apr-2026 | 1 | |
| 10.4 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT |
07-Apr-2026 | 1 | |
| 10.5 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE |
07-Apr-2026 | 1 | |
| 10.6 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | MIDSHIP SECTION |
07-Apr-2026 | 1 | |
| 10.7 | 72-LL/4/2026 |
MILKE MARU 2602010118 |
HIGH SPEED PASSANGER VESSEL | DECKHOUSE CONSTRUCTION |
07-Apr-2026 | 1 | |
| 11 | 4-LLSS/4/2026 |
KEISHA (CARGO SECURING) 2605110013 |
PASSANGER CAR FERRY |
CARGO SECURING MANUAL |
07-Apr-2026 | 1 | - |
| 12 | 86-LL/4/2026 |
SAMUDRA SINDO 8 2601150011 |
TUG BOAT |
Multiple Items (2 Gambar) |
08-Apr-2026 | 2 | |
| 12.1 | 86-LL/4/2026 |
SAMUDRA SINDO 8 2601150011 |
TUG BOAT | FIRE STRUCTURAL PORTECTION PLAN |
08-Apr-2026 | 1 | |
| 12.2 | 86-LL/4/2026 |
SAMUDRA SINDO 8 2601150011 |
TUG BOAT | X RAY PLAN |
08-Apr-2026 | 1 | |
| 13 | 85-LL/4/2026 |
LUCKY STAR 88 2604180020 |
GENERAL CARGO |
MIDSHIP SECTION |
08-Apr-2026 | 1 | - |
| 14 | 77-LL/4/2026 |
VIRGO TRANSPORT 8 (PKBL) 2502021231 |
RO-RO PASSENGER SHIP |
LONG STRENGTH CALCULATION |
08-Apr-2026 | 1 | - |
| 15 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT |
Multiple Items (12 Gambar) |
09-Apr-2026 | 12 | |
| 15.1 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | GENERAL ARRANGEMENT |
09-Apr-2026 | 1 | |
| 15.2 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | FORE PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 15.3 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | DECK HOUSE CONSTRUCTIONS |
09-Apr-2026 | 1 | |
| 15.4 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | ENGINE FOUNDATION |
09-Apr-2026 | 1 | |
| 15.5 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 15.6 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | AFTER PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 15.7 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | WHEELHOUSE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 15.8 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | BULKHEAD CONSTRUCTION |
09-Apr-2026 | 1 | |
| 15.9 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | BOTTOM AND DECK PLAN |
09-Apr-2026 | 1 | |
| 15.10 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | SHELL EXPANSIONS |
09-Apr-2026 | 1 | |
| 15.11 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | PROFILE PLAN |
09-Apr-2026 | 1 | |
| 15.12 | 96-LL/4/2026 |
OCEAN STAR (FINAL) 2501030434 |
LANDING CRAFT | WELDING SCHEDULE |
09-Apr-2026 | 1 | |
| 16 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE |
Multiple Items (6 Gambar) |
13-Apr-2026 | 6 | |
| 16.1 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE | STERN CONSTRUCTION |
13-Apr-2026 | 1 | |
| 16.2 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE | MIDSHIP SECTION |
13-Apr-2026 | 1 | |
| 16.3 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE | CONSTRUCTION PROFILE PLAN VIEW |
13-Apr-2026 | 1 | |
| 16.4 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE | CONSTRUCTION PROFILE CARGO AREA |
13-Apr-2026 | 1 | |
| 16.5 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 16.6 | 152-LL/4/2026 |
ANGGADA - VII 2603020315 |
CHEMICAL BARGE | STEM CONSTRUCTION |
13-Apr-2026 | 1 | |
| 17 | 138-LL/4/2026 |
PANARUNG 2502030563 |
CREW BOAT |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 17.1 | 138-LL/4/2026 |
PANARUNG 2502030563 |
CREW BOAT | MIDSHIP SECTIONS |
13-Apr-2026 | 1 | |
| 17.2 | 138-LL/4/2026 |
PANARUNG 2502030563 |
CREW BOAT | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 17.3 | 138-LL/4/2026 |
PANARUNG 2502030563 |
CREW BOAT | PROFILE CONSTRUCTION |
13-Apr-2026 | 1 | |
| 17.4 | 138-LL/4/2026 |
PANARUNG 2502030563 |
CREW BOAT | BULKHEAD |
13-Apr-2026 | 1 | |
| 17.5 | 138-LL/4/2026 |
PANARUNG 2502030563 |
CREW BOAT | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 18 | 133-LL/4/2026 |
H - 049 2401020724 |
TUG BOAT |
ENGINE GIRDER CONSTRUCTION DETAILS |
13-Apr-2026 | 1 | - |
| 19 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE |
Multiple Items (16 Gambar) |
14-Apr-2026 | 16 | |
| 19.1 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | SHELL EXPANSION PLAN |
14-Apr-2026 | 1 | |
| 19.2 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | RUDDER CONSTRUCTION |
14-Apr-2026 | 1 | |
| 19.3 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | BOW STRUCTURE |
14-Apr-2026 | 1 | |
| 19.4 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | MAIN DECK HOUSE STRUCTURE |
14-Apr-2026 | 1 | |
| 19.5 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | |
| 19.6 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | LIVING DECK HOUSE STRUCTURE |
14-Apr-2026 | 1 | |
| 19.7 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | TRANSVERSE BULKHEAD STRUCTURE |
14-Apr-2026 | 1 | |
| 19.8 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | RUDDER STOCK ASSEMBLY |
14-Apr-2026 | 1 | |
| 19.9 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | BASIC STRUCTURE |
14-Apr-2026 | 1 | |
| 19.10 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | LOWER RUDDER STOCK |
14-Apr-2026 | 1 | |
| 19.11 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | MIDSHIP SECTION |
14-Apr-2026 | 1 | |
| 19.12 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | MAIN ENGINE SEAT CONSTRUCTION |
14-Apr-2026 | 1 | |
| 19.13 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | CRANE BASE STRUCTURE |
14-Apr-2026 | 1 | |
| 19.14 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | UPPER RUDDER STOCK |
14-Apr-2026 | 1 | |
| 19.15 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | ENGINE ROOM AND STERN STRUCTURE |
14-Apr-2026 | 1 | |
| 19.16 | 187-LL/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | WHEEL HOUSE STRUCTURE |
14-Apr-2026 | 1 | |
| 20 | 177-LL/4/2026 |
LEGENDA NUSANTARA 777 2502070088 |
LANDING CRAFT |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 20.1 | 177-LL/4/2026 |
LEGENDA NUSANTARA 777 2502070088 |
LANDING CRAFT | SKEG CONSTRUCTION |
14-Apr-2026 | 1 | |
| 20.2 | 177-LL/4/2026 |
LEGENDA NUSANTARA 777 2502070088 |
LANDING CRAFT | STOWAGE AND LASHING ARRANGEMENT |
14-Apr-2026 | 1 | |
| 20.3 | 177-LL/4/2026 |
LEGENDA NUSANTARA 777 2502070088 |
LANDING CRAFT | LONGITUDINAL STRENGTH CALCULATION |
14-Apr-2026 | 1 | |
| 21 | 160-LL/4/2026 |
DHARMA RUCITRA VII (APP. DRAWING) 2604040053 |
PASSANGER CAR FERRY |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 21.1 | 160-LL/4/2026 |
DHARMA RUCITRA VII (APP. DRAWING) 2604040053 |
PASSANGER CAR FERRY | KONSTRUKSI PENAMBAHAN RUANG VIP |
14-Apr-2026 | 1 | |
| 21.2 | 160-LL/4/2026 |
DHARMA RUCITRA VII (APP. DRAWING) 2604040053 |
PASSANGER CAR FERRY | RENCANA UMUM |
14-Apr-2026 | 1 | |
| 21.3 | 160-LL/4/2026 |
DHARMA RUCITRA VII (APP. DRAWING) 2604040053 |
PASSANGER CAR FERRY | KONSTRUKSI PENAMBAHAN RUANG TIDUR EKONOMI (252 P) |
14-Apr-2026 | 1 | |
| 22 | 201-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 22.1 | 201-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | AL087 sewage tank stbd |
15-Apr-2026 | 1 | |
| 22.2 | 201-LL/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | AL087 sewage tank port |
15-Apr-2026 | 1 | |
| 23 | 229-LL/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP |
Multiple Items (2 Gambar) |
16-Apr-2026 | 2 | |
| 23.1 | 229-LL/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP | GENERAL ARRANGEMENT |
16-Apr-2026 | 1 | |
| 23.2 | 229-LL/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP | CONSTRUCTION PROFILE |
16-Apr-2026 | 1 | |
| 24 | 260-LL/4/2026 |
PONTOON KAPAL INDUK 1 (FINAL) 2601120013 |
PONTOON |
CONSTRUCTION PROFILE |
17-Apr-2026 | 1 | - |
| 25 | 301-LL/4/2026 |
PONTOON KAPAL INDUK 2 (FINAL) 2601120014 |
PONTOON |
CONSTRUCTION PROFILE |
20-Apr-2026 | 1 | - |
FAHMI, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 132-SC/4/2026 |
ICON MIKHA VI 8 19 2602040001 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 1.1 | 132-SC/4/2026 |
ICON MIKHA VI 8 19 2602040001 |
GENERAL CARGO | DAMAGE STABILITY |
14-Apr-2026 | 1 | |
| 1.2 | 132-SC/4/2026 |
ICON MIKHA VI 8 19 2602040001 |
GENERAL CARGO | INTACT STABILITY |
14-Apr-2026 | 1 | |
| 2 | 183-SC/4/2026 |
HEBAT (APPROVAL PRB) 2604010133 |
CEMENT CARRIER |
CAPACITY PLAN |
17-Apr-2026 | 1 | - |
| 3 | 10-SCSS/4/2026 |
HEBAT (APPROVAL PRB) 2604010133 |
CEMENT CARRIER |
LIFE SAVING APPLIANCES |
17-Apr-2026 | 1 | - |
FAHRUL NUR HIDAYAT, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 4-MM/4/2026 |
GIBSON I (PKBL) 2502021484 |
OIL BARGE |
Multiple Items (2 Gambar) |
01-Apr-2026 | 2 | |
| 1.1 | 4-MM/4/2026 |
GIBSON I (PKBL) 2502021484 |
OIL BARGE | SCHEMATIC CARGO OIL SYSTEM |
01-Apr-2026 | 1 | |
| 1.2 | 4-MM/4/2026 |
GIBSON I (PKBL) 2502021484 |
OIL BARGE | ENGINE ROOM LAYOUT |
01-Apr-2026 | 1 | |
| 2 | 13-MM/4/2026 |
H420 LCT 19.9 M (DELIVERY) 2501010583 |
FAST PATROL BOAT |
ENGINE ROOM LAYOUT |
01-Apr-2026 | 1 | - |
| 3 | 38-MM/4/2026 |
SHENG HONG 108 (PKBL) 2412021402 |
OFSHORE SERVICE & FF1 |
STERNTUBE DETAIL |
02-Apr-2026 | 1 | - |
| 4 | 76-MM/4/2026 |
SHENG HONG 108 (PKBL) 2412021402 |
OFSHORE SERVICE & FF1 |
CO2 SYSTEM |
07-Apr-2026 | 1 | - |
| 5 | 143-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO |
Multiple Items (5 Gambar) |
09-Apr-2026 | 5 | |
| 5.1 | 143-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | STERN TUBE ARRANGEMENT & PROPELLER SHAFT (P&S) |
09-Apr-2026 | 1 | |
| 5.2 | 143-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | PROPELLER BLADE |
09-Apr-2026 | 1 | |
| 5.3 | 143-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | STEERING GEAR HYDRAULIC SYSTEM |
09-Apr-2026 | 1 | |
| 5.4 | 143-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | CO2 SYSTEM & CALCULATION |
09-Apr-2026 | 1 | |
| 5.5 | 143-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO | MAIN FIRE FIGHTING PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 6 | 153-MM/4/2026 |
BHS 02 2401110051 |
TUG BOAT |
Multiple Items (3 Gambar) |
10-Apr-2026 | 3 | |
| 6.1 | 153-MM/4/2026 |
BHS 02 2401110051 |
TUG BOAT | OWS SYSTEM |
10-Apr-2026 | 1 | |
| 6.2 | 153-MM/4/2026 |
BHS 02 2401110051 |
TUG BOAT | SOUNDING AIR AND OVERFLOW PIPING SYSTEM |
10-Apr-2026 | 1 | |
| 6.3 | 153-MM/4/2026 |
BHS 02 2401110051 |
TUG BOAT | STEERING GEAR SYSTEM |
10-Apr-2026 | 1 | |
| 7 | 168-MM/4/2026 |
HULL - 184 FINAL 2501020129 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 7.1 | 168-MM/4/2026 |
HULL - 184 FINAL 2501020129 |
TUG BOAT | Propeller Shaft and Sterntube Detail |
13-Apr-2026 | 1 | |
| 7.2 | 168-MM/4/2026 |
HULL - 184 FINAL 2501020129 |
TUG BOAT | SHAFTING DETAIL |
13-Apr-2026 | 1 | |
| 8 | 177-MM/4/2026 |
H420 LCT 19.9 M (DELIVERY) 2501010583 |
FAST PATROL BOAT |
FUEL OIL SYSTEM |
13-Apr-2026 | 1 | - |
| 9 | 182-MM/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE |
Multiple Items (3 Gambar) |
13-Apr-2026 | 3 | |
| 9.1 | 182-MM/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE | FUEL OIL SISTEM |
13-Apr-2026 | 1 | |
| 9.2 | 182-MM/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE | SCHEMATIC CARGO PIPE SYSTEM R0 |
13-Apr-2026 | 1 | |
| 9.3 | 182-MM/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE | SOUNDING AND AIR PIPE SYSTEM R0 |
13-Apr-2026 | 1 | |
| 10 | 185-MM/4/2026 |
H421 LCT 19.9 M (DELIVERY) 2501010587 |
PATROL BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 10.1 | 185-MM/4/2026 |
H421 LCT 19.9 M (DELIVERY) 2501010587 |
PATROL BOAT | FRESH WATER SYSTEM |
13-Apr-2026 | 1 | |
| 10.2 | 185-MM/4/2026 |
H421 LCT 19.9 M (DELIVERY) 2501010587 |
PATROL BOAT | SEWAGE SYSTEM |
13-Apr-2026 | 1 | |
| 11 | 183-MM/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE |
ENGINE COOLING SYSTEM R0 |
13-Apr-2026 | 1 | - |
| 12 | 175-MM/4/2026 |
HORUS 889 2301030380 |
TUG BOAT |
PROPELLER |
13-Apr-2026 | 1 | - |
| 13 | 192-MM/4/2026 |
LBN 11 (PKBL NON TOCA) 2602120005 |
GENERAL CARGO |
SOUNDING, AIR & FILLING PIPE SYSTEM |
14-Apr-2026 | 1 | - |
| 14 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER |
Multiple Items (20 Gambar) |
15-Apr-2026 | 20 | |
| 14.1 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | GENERAL VENT SOUNDING FILLING SYSTEM |
15-Apr-2026 | 1 | |
| 14.2 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | STERN SHAFT |
15-Apr-2026 | 1 | |
| 14.3 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | FO TRANSFER PIPING |
15-Apr-2026 | 1 | |
| 14.4 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | SHAFT COUPLING |
15-Apr-2026 | 1 | |
| 14.5 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | ER BILGE BALLAST FIRE WATER PIPING |
15-Apr-2026 | 1 | |
| 14.6 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | LO TRANSFER AND PURIFYING PIPING |
15-Apr-2026 | 1 | |
| 14.7 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 14.8 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | AIR COMPRESSED PIPING |
15-Apr-2026 | 1 | |
| 14.9 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | GENERAL WATER FIRE FIGHTING PIPING |
15-Apr-2026 | 1 | |
| 14.10 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | PROPELLER |
15-Apr-2026 | 1 | |
| 14.11 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | CO2 FIRE FIGHTING PIPING |
15-Apr-2026 | 1 | |
| 14.12 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | WATER COOLING PIPING |
15-Apr-2026 | 1 | |
| 14.13 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | MIDDLE SHAFT |
15-Apr-2026 | 1 | |
| 14.14 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | FO PURIFYING PIPING |
15-Apr-2026 | 1 | |
| 14.15 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | ELECTRO HYDRAULIC RUDDER SYSTEM |
15-Apr-2026 | 1 | |
| 14.16 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | FUEL OIL SERVICE SYSTEM |
15-Apr-2026 | 1 | |
| 14.17 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | ASSEMBLING STERN SHAFT AND STERN TUBE |
15-Apr-2026 | 1 | |
| 14.18 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | ENGINE ROOM LAY OUT |
15-Apr-2026 | 1 | |
| 14.19 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | LO SERVICE PIPING |
15-Apr-2026 | 1 | |
| 14.20 | 224-MM/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | PROPELLER SHAFT |
15-Apr-2026 | 1 | |
| 15 | 250-MM/4/2026 |
H051 (FINAL) 2501120119 |
PATROL BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 15.1 | 250-MM/4/2026 |
H051 (FINAL) 2501120119 |
PATROL BOAT | BILGE OWS AND SLUDGE SYSTEM |
15-Apr-2026 | 1 | |
| 15.2 | 250-MM/4/2026 |
H051 (FINAL) 2501120119 |
PATROL BOAT | COMPRESSED AIR SYSTEM |
15-Apr-2026 | 1 | |
| 16 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (9 Gambar) |
15-Apr-2026 | 9 | |
| 16.1 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | FUEL OIL SYSTEM |
15-Apr-2026 | 1 | |
| 16.2 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | BILGE FIRE AND GS SYSTEM |
15-Apr-2026 | 1 | |
| 16.3 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | PROPELLER |
15-Apr-2026 | 1 | |
| 16.4 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 16.5 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 16.6 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | AIR FILLING AND SOUNDING PIPE |
15-Apr-2026 | 1 | |
| 16.7 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | STEERING GEAR SYSTEM |
15-Apr-2026 | 1 | |
| 16.8 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | SHAFTING ARRANGEMENT AND DETAIL |
15-Apr-2026 | 1 | |
| 16.9 | 238-MM/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | SPRINKLER SYSTEM |
15-Apr-2026 | 1 | |
| 17 | 223-MM/4/2026 |
HULL - 035 (FINAL) 2601020008 |
CPO BARGE |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 17.1 | 223-MM/4/2026 |
HULL - 035 (FINAL) 2601020008 |
CPO BARGE | AIR SOUNDING PIPE ARRANGEMENT |
15-Apr-2026 | 1 | |
| 17.2 | 223-MM/4/2026 |
HULL - 035 (FINAL) 2601020008 |
CPO BARGE | PUMP ROOM VENTILATION SYSTEM |
15-Apr-2026 | 1 | |
| 18 | 234-MM/4/2026 |
MILLENIUM STAR 2603020316 |
OIL BARGE |
ENGINE AND PUMP ROOM LAYOUT |
15-Apr-2026 | 1 | - |
| 19 | 241-MM/4/2026 |
SHENG HONG 108 (PKBL) 2412021402 |
OFSHORE SERVICE & FF1 |
CPP SYSTEM INTALLATION MANUAL |
15-Apr-2026 | 1 | - |
| 20 | 220-MM/4/2026 |
KH 53 (DELIVERY) 2501010518 |
CREW BOAT |
ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | - |
| 21 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE |
Multiple Items (9 Gambar) |
16-Apr-2026 | 9 | |
| 21.1 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | PUMP ROOM VENTILATION SYSTEM |
16-Apr-2026 | 1 | |
| 21.2 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | EXHAUST GAS PIPING SYSTEM |
16-Apr-2026 | 1 | |
| 21.3 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | ENGINE COOLING SYSTEM |
16-Apr-2026 | 1 | |
| 21.4 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | MAIN CARGO |
16-Apr-2026 | 1 | |
| 21.5 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | FUEL OIL SCHEMATIC DIAGRAM |
16-Apr-2026 | 1 | |
| 21.6 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | AIR SOUNDING PIPE ARRANGEMENT |
16-Apr-2026 | 1 | |
| 21.7 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | WASHING PIPE |
16-Apr-2026 | 1 | |
| 21.8 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | DOMESTIC FRESH WATER SANITARY SYTEM |
16-Apr-2026 | 1 | |
| 21.9 | 258-MM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE | BILGE BALLAST FIRE MAIN SYSTEM |
16-Apr-2026 | 1 | |
| 22 | 268-MM/4/2026 |
H - 940 (FINAL) 2501020843 |
SELF PROPELLED OIL/CHEMICAL BARGE |
SHAFTING ARRANGEMENT |
16-Apr-2026 | 1 | - |
| 23 | 260-MM/4/2026 |
HULL - 413 (FINAL) 2501021181 |
CPO BARGE |
Multiple Items (5 Gambar) |
16-Apr-2026 | 5 | |
| 23.1 | 260-MM/4/2026 |
HULL - 413 (FINAL) 2501021181 |
CPO BARGE | FUEL OIL SCHEMATIC DIAGRAM |
16-Apr-2026 | 1 | |
| 23.2 | 260-MM/4/2026 |
HULL - 413 (FINAL) 2501021181 |
CPO BARGE | WASHING CARGO PIPE |
16-Apr-2026 | 1 | |
| 23.3 | 260-MM/4/2026 |
HULL - 413 (FINAL) 2501021181 |
CPO BARGE | BILGE BALLAST FIRE MAIN SYSTEM |
16-Apr-2026 | 1 | |
| 23.4 | 260-MM/4/2026 |
HULL - 413 (FINAL) 2501021181 |
CPO BARGE | AIR SOUNDING PIPE ARRANGEMENT |
16-Apr-2026 | 1 | |
| 23.5 | 260-MM/4/2026 |
HULL - 413 (FINAL) 2501021181 |
CPO BARGE | MAIN CARGO |
16-Apr-2026 | 1 | |
| 24 | 267-MM/4/2026 |
H - 904 (FINAL) 2501020701 |
SELF PROPELLED OIL/CHEMICAL BARGE |
SHAFTING ARRANGEMENT |
16-Apr-2026 | 1 | - |
| 25 | 261-MM/4/2026 |
H - 169 (FINAL) 2501021067 |
SELF PROPELLED OIL/CHEMICAL BARGE |
sch bilge ballast firemain system |
16-Apr-2026 | 1 | - |
| 26 | 300-MM/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 26.1 | 300-MM/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP | SISTEM PIPA BALLAST |
17-Apr-2026 | 1 | |
| 26.2 | 300-MM/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP | BILGE BALLAST AND FIRE GS SYSTEM |
17-Apr-2026 | 1 | |
| 26.3 | 300-MM/4/2026 |
ALEXINDO 8 2603010106 |
CONTAINER SHIP | SOUNDING FILLING AND AIR PIPE |
17-Apr-2026 | 1 | |
| 27 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT |
Multiple Items (9 Gambar) |
17-Apr-2026 | 9 | |
| 27.1 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | ENGINE ROOM LAYOUT |
17-Apr-2026 | 1 | |
| 27.2 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | STEERING GEAR SYSTEM |
17-Apr-2026 | 1 | |
| 27.3 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SCHEMATIC COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 27.4 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SEA CHEST CONSTRUCTION |
17-Apr-2026 | 1 | |
| 27.5 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SCHEMATIC BILGE, BALLAST & FIRE SYSTEM |
17-Apr-2026 | 1 | |
| 27.6 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SCHEMATIC FRESH WATER & SEA WATER SYSTEM |
17-Apr-2026 | 1 | |
| 27.7 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SCHEMATIC OWS & SLUDGE SYSTEM |
17-Apr-2026 | 1 | |
| 27.8 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SCHEMATIC TANK VENT, SOUNDING & FILLING SYSTEM |
17-Apr-2026 | 1 | |
| 27.9 | 310-MM/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SCHEMATIC DRAINAGE & SEWAGE SYSTEM |
17-Apr-2026 | 1 | |
| 28 | 290-MM/4/2026 |
H - 551 (FINAL) 2501020814 |
CPO BARGE |
H-551-VENTILATION ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 29 | 312-MM/4/2026 |
HULL - 390 (FINAL) 2601020086 |
OIL/CHEMICAL BARGE |
Multiple Items (2 Gambar) |
20-Apr-2026 | 2 | |
| 29.1 | 312-MM/4/2026 |
HULL - 390 (FINAL) 2601020086 |
OIL/CHEMICAL BARGE | AE CARGO EXHAUST PIPING DIAGRAM |
20-Apr-2026 | 1 | |
| 29.2 | 312-MM/4/2026 |
HULL - 390 (FINAL) 2601020086 |
OIL/CHEMICAL BARGE | BILGE BALLAST FIRE PIPING DIAGRAM |
20-Apr-2026 | 1 |
FARHAND ALLY FAHMI
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
Multiple Items (19 Gambar) |
15-Apr-2026 | 19 | ||
| 1.1 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
FLANGE, COMPANION |
15-Apr-2026 | 1 | ||
| 1.2 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
PINION (GR:2.71) |
15-Apr-2026 | 1 | ||
| 1.3 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
PINION (GR:3.00) |
15-Apr-2026 | 1 | ||
| 1.4 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SHAFT AS., DRIVE |
15-Apr-2026 | 1 | ||
| 1.5 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
GEAR, REV. |
15-Apr-2026 | 1 | ||
| 1.6 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
DOCUMENT LIST FOR DESIGN APPROVAL MODEL : MGX-66221SC |
15-Apr-2026 | 1 | ||
| 1.7 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SHAFT, DRIVE |
15-Apr-2026 | 1 | ||
| 1.8 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SCREW, HEX. HEAD |
15-Apr-2026 | 1 | ||
| 1.9 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
GEAR (GR:2.71) |
15-Apr-2026 | 1 | ||
| 1.10 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SHAFT AS., GEAR |
15-Apr-2026 | 1 | ||
| 1.11 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
GEAR (GR:3.00) |
15-Apr-2026 | 1 | ||
| 1.12 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
PINION (GR:2.47) |
15-Apr-2026 | 1 | ||
| 1.13 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
GEAR, REV. |
15-Apr-2026 | 1 | ||
| 1.14 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
GEAR (GR:2.47) |
15-Apr-2026 | 1 | ||
| 1.15 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
FLANGE, INPUT |
15-Apr-2026 | 1 | ||
| 1.16 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
GENERAL VIEW |
15-Apr-2026 | 1 | ||
| 1.17 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SECTIONAL VIEW |
15-Apr-2026 | 1 | ||
| 1.18 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SHAFT, GEAR |
15-Apr-2026 | 1 | ||
| 1.19 | 9-TAMK/4/2026 |
(MARINE GEARBOX (MGX-6621SC)) TWIN DISC (FAR EAST) PTE LTD 2641090092 |
SHAFT, OUTPUT |
15-Apr-2026 | 1 | ||
| 2 | 47-MMMK/4/2026 |
(PROPELLER) 38M HIGH SPEED FERRY H087 AL 2609020319 |
PASSENGER SHIP |
PROPELLER C 1080X1450 |
16-Apr-2026 | 1 | - |
| 3 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO |
Multiple Items (17 Gambar) |
17-Apr-2026 | 17 | |
| 3.1 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | NDT PROCEDURE MAGNETIC PARTICLE TESTING (ASME) |
17-Apr-2026 | 1 | |
| 3.2 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | C.V. AND CERTIFICATE OF QUALIFICATION - WAHYU ADI HABIBULOH |
17-Apr-2026 | 1 | |
| 3.3 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | COMPANY LEGALITY |
17-Apr-2026 | 1 | |
| 3.4 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | NDT PROCEDURE MAGNETIC PARTICLE TESTING (AWS) |
17-Apr-2026 | 1 | |
| 3.5 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | NDT PROCEDURE ULTRASONIC TESTING (ASME) |
17-Apr-2026 | 1 | |
| 3.6 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | CUSTOMER COMPLAIN FORM (NDT) |
17-Apr-2026 | 1 | |
| 3.7 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | QUALITY MANUAL |
17-Apr-2026 | 1 | |
| 3.8 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | RENCANA PELATIHAN PERSONIL (TRAINING PLAN) |
17-Apr-2026 | 1 | |
| 3.9 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | WRITTEN PRATICTICE FOR CERTIFICATION OF NDT PERSONNEL |
17-Apr-2026 | 1 | |
| 3.10 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | COMPANY PROFILE |
17-Apr-2026 | 1 | |
| 3.11 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | NDT PROCEDURE LIQUID PENETRANT TESTING (AWS) |
17-Apr-2026 | 1 | |
| 3.12 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | DAFTAR PERALATAN DAN SERTIFIKAT KALIBRASI |
17-Apr-2026 | 1 | |
| 3.13 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | STRUKTUR ORGANISASI |
17-Apr-2026 | 1 | |
| 3.14 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | NDT PROCEDURE ULTRASONIC TESTING (AWS) |
17-Apr-2026 | 1 | |
| 3.15 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | NDT PROCEDURE LIQUID PENETRANT TESTING (ASME) |
17-Apr-2026 | 1 | |
| 3.16 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | C.V. AND CERTIFICATE OF QUALIFICATION - ARI ADITYA |
17-Apr-2026 | 1 | |
| 3.17 | 4-SAMK/4/2026 |
(COMPANY FOR CARRYING OUT NDT) PT. SAMUDRA GAMA ULTRANINDO 2240020685 |
GENERAL CARGO | DAFTAR TEKNISI |
17-Apr-2026 | 1 | |
| 4 | 49-MMMK/4/2026 |
(PROPELLER) BERKAT USAHA MULYA - 77 LCT. 2609040058 |
LANDING CRAFT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 5 | 62-MMMK/4/2026 |
(PROPELLER) DRAKO VALIANT TB. 2608020326 |
TUG BOAT |
PROPELLER |
17-Apr-2026 | 1 | - |
| 6 | 50-MMMK/4/2026 |
(PROPELLER SHAFT) BERKAT USAHA MULYA - 77 TB. 2609040059 |
LANDING CRAFT |
SHAFT AND STERN TUBE DETAILS |
17-Apr-2026 | 1 | - |
| 7 | 55-MMMK/4/2026 |
(PROPELLER) DELTA - 106 TB. 2608040064 |
TUG BOAT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 8 | 60-MMMK/4/2026 |
(PROPELLER) SABB - 01 TB. 2609040069 |
TUG BOAT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 9 | 48-MMMK/4/2026 |
(PROPELLER) ANTARA SAMUDRA - 02 LCT. 2609040057 |
LANDING CRAFT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 10 | 56-MMMK/4/2026 |
(PROPELLER) DELTA AYU - 688 TB. 2609040065 |
TUG BOAT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 11 | 61-MMMK/4/2026 |
(PROPELLER SHAFT) LINTAS BRANTAS MV. 2608040056 |
GENERAL CARGO |
PROPELLER SHAFT & STERN TUBE |
17-Apr-2026 | 1 | - |
| 12 | 58-MMMK/4/2026 |
(PROPELLER) NAPOLEON - 71 TB. 2609040067 |
TUG BOAT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 13 | 57-MMMK/4/2026 |
(PROPELLER) MBS - 19 TB. 2608040066 |
TUG BOAT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 14 | 59-MMMK/4/2026 |
(PROPELLER) NAPOLEON - 72 TB. 2609040068 |
TUG BOAT |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
FAULINCIA, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 66-ML/4/2026 |
BHS 02 2401110051 |
TUG BOAT |
Multiple Items (3 Gambar) |
10-Apr-2026 | 3 | |
| 1.1 | 66-ML/4/2026 |
BHS 02 2401110051 |
TUG BOAT | MSB |
10-Apr-2026 | 1 | |
| 1.2 | 66-ML/4/2026 |
BHS 02 2401110051 |
TUG BOAT | BALANS DAYA |
10-Apr-2026 | 1 | |
| 1.3 | 66-ML/4/2026 |
BHS 02 2401110051 |
TUG BOAT | WIRING DIAGRAM |
10-Apr-2026 | 1 | |
| 2 | 86-ML/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT |
WIRING DIAGRAM |
13-Apr-2026 | 1 | - |
| 3 | 79-ML/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 3.1 | 79-ML/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE | MSB |
13-Apr-2026 | 1 | |
| 3.2 | 79-ML/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE | WIRING DIAGRAM |
13-Apr-2026 | 1 | |
| 4 | 87-ML/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 4.1 | 87-ML/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | MAIN SWITCHBOARD |
13-Apr-2026 | 1 | |
| 4.2 | 87-ML/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | BALANCE DAYA |
13-Apr-2026 | 1 | |
| 5 | 88-ML/4/2026 |
HULL - 410 (FINAL) 2501020944 |
TUG BOAT |
ELECTRICAL CALCULATION |
13-Apr-2026 | 1 | - |
| 6 | 101-ML/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG |
Multiple Items (3 Gambar) |
14-Apr-2026 | 3 | |
| 6.1 | 101-ML/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | WIRING DIAGRAM |
14-Apr-2026 | 1 | |
| 6.2 | 101-ML/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | MSB DIAGRAM |
14-Apr-2026 | 1 | |
| 6.3 | 101-ML/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | ELECTRIC LOAD ANALYSIS |
14-Apr-2026 | 1 | |
| 7 | 106-ML/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 7.1 | 106-ML/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 7.2 | 106-ML/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | MAIN SWITCHBOARD |
15-Apr-2026 | 1 | |
| 7.3 | 106-ML/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 8 | 121-ML/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 8.1 | 121-ML/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 8.2 | 121-ML/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 8.3 | 121-ML/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT | MAIN SWITCHBOARD |
15-Apr-2026 | 1 | |
| 9 | 109-ML/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT |
Multiple Items (4 Gambar) |
15-Apr-2026 | 4 | |
| 9.1 | 109-ML/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ELECTRICAL CALCULATION |
15-Apr-2026 | 1 | |
| 9.2 | 109-ML/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ELECTRICAL SINGLE LINE SCHEMATIC DIAGRAM |
15-Apr-2026 | 1 | |
| 9.3 | 109-ML/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | NAVIGATION LIGHT ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9.4 | 109-ML/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ARRANGEMENT OF ELECTRIC EQUIPMENT (DC AC) |
15-Apr-2026 | 1 | |
| 10 | 107-ML/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 10.1 | 107-ML/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | ELECTRIC POWER BALANCE |
15-Apr-2026 | 1 | |
| 10.2 | 107-ML/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | MSB DIAGRAM |
15-Apr-2026 | 1 | |
| 10.3 | 107-ML/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 11 | 118-ML/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 11.1 | 118-ML/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 11.2 | 118-ML/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | POWER BALANCE |
15-Apr-2026 | 1 | |
| 12 | 105-ML/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT |
NAVIGATION LIGHT ARRANGEMENT |
15-Apr-2026 | 1 | - |
| 13 | 129-ML/4/2026 |
SULTAN 77 (NOT TOCA) 2602030133 |
CREW BOAT |
WIRING DIAGRAM |
16-Apr-2026 | 1 | - |
| 14 | 137-ML/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 14.1 | 137-ML/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE | POWER BALANCE CALCULATION |
17-Apr-2026 | 1 | |
| 14.2 | 137-ML/4/2026 |
MHM 3502 (PKBL) 2502021511 |
OIL BARGE | ELECTRIC WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 15 | 144-ML/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 15.1 | 144-ML/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | ELECTRIC LOAD BALANCE |
17-Apr-2026 | 1 | |
| 15.2 | 144-ML/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | SCHEMATIC WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 16 | 145-ML/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 16.1 | 145-ML/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | SCHEMATIC WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 16.2 | 145-ML/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | ELECTRIC LOAD BALANCE |
17-Apr-2026 | 1 | |
| 17 | 140-ML/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 17.1 | 140-ML/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | MSB DIAGRAM |
17-Apr-2026 | 1 | |
| 17.2 | 140-ML/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 17.3 | 140-ML/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | ELECTRIC POWER BALANCE |
17-Apr-2026 | 1 | |
| 18 | 149-ML/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP |
Multiple Items (5 Gambar) |
20-Apr-2026 | 5 | |
| 18.1 | 149-ML/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | HULL 87 ELECTRICAL LOAD CALCULATION |
20-Apr-2026 | 1 | |
| 18.2 | 149-ML/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | HULL 87 CABLE LADDER LAY OUT DRAWING |
20-Apr-2026 | 1 | |
| 18.3 | 149-ML/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | HULL 87 FIRE ALARM LAY OUT DRAWING |
20-Apr-2026 | 1 | |
| 18.4 | 149-ML/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | HULL 87 LIGHTING LAY OUT DRAWING |
20-Apr-2026 | 1 | |
| 18.5 | 149-ML/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | HULL 87 SINGLE LINE DRAWING |
20-Apr-2026 | 1 |
FIVID RIVANTORO, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
Multiple Items (15 Gambar) |
08-Apr-2026 | 15 | |
| 1.1 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SCHEMATIC DIAGRAM OF LUBRICATING OIL SUPPLY PIPELINE SYSTEM |
08-Apr-2026 | 1 | |
| 1.2 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | CO2 SYSTEM |
08-Apr-2026 | 1 | |
| 1.3 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SCHEMATIC DIAGRAM OF FUEL OIL PURIFIED PIPING SYSTEM |
08-Apr-2026 | 1 | |
| 1.4 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SHAFTING AND STERN TUBE DETAIL |
08-Apr-2026 | 1 | |
| 1.5 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SHAFTING ARRANGEMENT |
08-Apr-2026 | 1 | |
| 1.6 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | ENGINE ROOM ARRANGEMENT |
08-Apr-2026 | 1 | |
| 1.7 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | FUEL SUPPLY PIPELINE SCHEMATIC DIAGRAM |
08-Apr-2026 | 1 | |
| 1.8 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | PROPELLER |
08-Apr-2026 | 1 | |
| 1.9 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | STEERING GEAR SYSTEM |
08-Apr-2026 | 1 | |
| 1.10 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SCHEMATIC DIAGRAM OF THE ENGINE ROOM OILY WATER TREATMENT |
08-Apr-2026 | 1 | |
| 1.11 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | BILGE BALLAST GS FIRE FIGHTING SYSTEM |
08-Apr-2026 | 1 | |
| 1.12 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | ENGINE ROOM EXHAUST AND VENTILATION PIPING ARRANGEMENT |
08-Apr-2026 | 1 | |
| 1.13 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SCHEMATIC DIAGRAM OF THE SHIPS AIR AND DEPTH SOUNDING SYSTEM |
08-Apr-2026 | 1 | |
| 1.14 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | FRESHWATER COOLING PIPE SYSTEM SCHEMATIC DIAGRAM |
08-Apr-2026 | 1 | |
| 1.15 | 91-MM/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SCHEMATIC DIAGRAM OF SEAWATER COOLING SYSTEM |
08-Apr-2026 | 1 | |
| 2 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP |
Multiple Items (10 Gambar) |
09-Apr-2026 | 10 | |
| 2.1 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Engine Exhaust Sea Water Cooling System H87 |
09-Apr-2026 | 1 | |
| 2.2 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | FUEL OIL SERVICE SYSTEM H87 |
09-Apr-2026 | 1 | |
| 2.3 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Bilge Piping System H87 |
09-Apr-2026 | 1 | |
| 2.4 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | SPRINKLER SYSTEM H87 |
09-Apr-2026 | 1 | |
| 2.5 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | FRESH WATER SEA WATER SEWAGE PIPING SYSTEM H87 |
09-Apr-2026 | 1 | |
| 2.6 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | AC Cooling System H87 |
09-Apr-2026 | 1 | |
| 2.7 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | 38m Sounding Filling Air Pipe H87 |
09-Apr-2026 | 1 | |
| 2.8 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | Sewage Piping System |
09-Apr-2026 | 1 | |
| 2.9 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | DISCHARGE PIPING ARRANGEMENT AND DETAIL H87 |
09-Apr-2026 | 1 | |
| 2.10 | 123-MM/4/2026 |
HULL AL - 087 (FINAL) 2501021418 |
PASSENGER SHIP | FIRE FIGHTING SYSTEM H87 |
09-Apr-2026 | 1 | |
| 3 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO |
Multiple Items (8 Gambar) |
09-Apr-2026 | 8 | |
| 3.1 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | LAY OUT ENGINE ROOM |
09-Apr-2026 | 1 | |
| 3.2 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | FRESH WATER COOLER PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 3.3 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | SEA WATER COOLER PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 3.4 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | PROPELLER FOR ME PORT |
09-Apr-2026 | 1 | |
| 3.5 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | FUEL OIL PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 3.6 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | SHAFTING ARRANGEMENT |
09-Apr-2026 | 1 | |
| 3.7 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | SHAFT DETAIL |
09-Apr-2026 | 1 | |
| 3.8 | 126-MM/4/2026 |
MULYA SENTOSA II 2604140003 |
RO-RO CARGO | PROPELLER FOR ME STBD AND CENTER |
09-Apr-2026 | 1 | |
| 4 | 174-MM/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 4.1 | 174-MM/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | SW SERVICE COOLING SW PIPE SYSTEM |
13-Apr-2026 | 1 | |
| 4.2 | 174-MM/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | LAYOUT ENGINE ROOM |
13-Apr-2026 | 1 | |
| 4.3 | 174-MM/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | HEAT TRANSFER OIL PIPE SYSTEM |
13-Apr-2026 | 1 | |
| 4.4 | 174-MM/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | AIR EXHAUST MIST PIPE SYSTEM |
13-Apr-2026 | 1 | |
| 4.5 | 174-MM/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | FO TRANSFER AND PURIFICATION PIPE SYSTEM |
13-Apr-2026 | 1 | |
| 5 | 179-MM/4/2026 |
ENTEBE MEGASTAR 73 2412140019 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 5.1 | 179-MM/4/2026 |
ENTEBE MEGASTAR 73 2412140019 |
TUG BOAT | SCHEMATIC FUEL OIL SYSTEM |
13-Apr-2026 | 1 | |
| 5.2 | 179-MM/4/2026 |
ENTEBE MEGASTAR 73 2412140019 |
TUG BOAT | PROPELLER |
13-Apr-2026 | 1 | |
| 6 | 215-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL |
Multiple Items (4 Gambar) |
14-Apr-2026 | 4 | |
| 6.1 | 215-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF02-17-VENT PIPE ARRANGEMENT |
14-Apr-2026 | 1 | |
| 6.2 | 215-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF02-15-GAS VENTILATION SYSTEM (SCHEMATIC) |
14-Apr-2026 | 1 | |
| 6.3 | 215-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF02-16-GAS VENTILATION SYSTEM |
14-Apr-2026 | 1 | |
| 6.4 | 215-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF02-18-DOUBLE WALL PIPE DETAIL |
14-Apr-2026 | 1 | |
| 7 | 227-MM/4/2026 |
PORTLINK VIII (DRAWING APPROVAL) 2604160004 |
PASSANGER FERRY |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 7.1 | 227-MM/4/2026 |
PORTLINK VIII (DRAWING APPROVAL) 2604160004 |
PASSANGER FERRY | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.2 | 227-MM/4/2026 |
PORTLINK VIII (DRAWING APPROVAL) 2604160004 |
PASSANGER FERRY | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 8 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP |
Multiple Items (12 Gambar) |
15-Apr-2026 | 12 | |
| 8.1 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SCH MACHINERY COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 8.2 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | PROPELLER SHAFT |
15-Apr-2026 | 1 | |
| 8.3 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SOUNDING FILLING AND AIR PIPE DIAGRAM |
15-Apr-2026 | 1 | |
| 8.4 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 8.5 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SHAFTING ARRANGEMENT AND INTERMEDIATE SHAFT |
15-Apr-2026 | 1 | |
| 8.6 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SCH BILGE GSAND FIRE MAIN SYSTEM |
15-Apr-2026 | 1 | |
| 8.7 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | STERN SHAFT AND STERN TUBE |
15-Apr-2026 | 1 | |
| 8.8 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SCH MACHINERY FUEL OIL SYSTEM |
15-Apr-2026 | 1 | |
| 8.9 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SCH OILY-BILGE SEPARATOR SYSTEM |
15-Apr-2026 | 1 | |
| 8.10 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | PROPELLER |
15-Apr-2026 | 1 | |
| 8.11 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | STEERING LAYOUT AND PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 8.12 | 231-MM/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | SCH CO2 FIXED FIRE-FIGHTING SYSTEM |
15-Apr-2026 | 1 | |
| 9 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE |
Multiple Items (17 Gambar) |
15-Apr-2026 | 17 | |
| 9.1 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 9.2 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | SEWAGE TREATMENT SYSTEM DIAGRAM |
15-Apr-2026 | 1 | |
| 9.3 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | EMERGENCY FIRE SYSTEM |
15-Apr-2026 | 1 | |
| 9.4 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | SCHEMATIC DIAGRAM OF CO2 FIRE FIGHTING SYSTEM |
15-Apr-2026 | 1 | |
| 9.5 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | GENERAL VENT SOUNDING SYSTEM |
15-Apr-2026 | 1 | |
| 9.6 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | STERN SHAFT AND STERN TUBE GENERAL DRAWING |
15-Apr-2026 | 1 | |
| 9.7 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | PROPELLER |
15-Apr-2026 | 1 | |
| 9.8 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | BILGE OIL SEWAGE TREATMENT SYSTEM DIAGRAM |
15-Apr-2026 | 1 | |
| 9.9 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | INTERMEDIATE SHAFT |
15-Apr-2026 | 1 | |
| 9.10 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | BILGE AND FIRE WATER SYSTEM DRAWING |
15-Apr-2026 | 1 | |
| 9.11 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | COMPRESSED AIR PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 9.12 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | FUEL OIL SERVICE SYSTEM |
15-Apr-2026 | 1 | |
| 9.13 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9.14 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | OPEN DECK DRAINAGE PIPE SYSTEM DIAGRAM |
15-Apr-2026 | 1 | |
| 9.15 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | BILGE FIRE WATER PIPING DRAWING |
15-Apr-2026 | 1 | |
| 9.16 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | SCHEMATIC DIAGRAM OF STEERING GEAR HYDRAULIC SYSTEM |
15-Apr-2026 | 1 | |
| 9.17 | 243-MM/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | COOLING WATER SYSTEM |
15-Apr-2026 | 1 | |
| 10 | 55-MMBM/4/2026 |
H - 8039 (FINAL) 2501020665 |
TUG BOAT |
PROPELLER |
16-Apr-2026 | 1 | - |
| 11 | 269-MM/4/2026 |
H - 958 (FINAL) 2501021273 |
SELF PROPELLED OIL/CHEMICAL BARGE |
SHAFFTING ARRANGEMENT |
16-Apr-2026 | 1 | - |
| 12 | 56-MMBM/4/2026 |
H - 8038 (FINAL) 2501020666 |
TUG BOAT |
PROPELLER |
16-Apr-2026 | 1 | - |
| 13 | 259-MM/4/2026 |
H - 58 (FINAL) 2501021415 |
CPO BARGE |
PT IPP-CPO-255X68X18FT-ENGINE ROOM-PUMP ROOM LAYOUT |
16-Apr-2026 | 1 | - |
| 14 | 57-MMBM/4/2026 |
H - 8037 (FINAL) 2501020672 |
TUG BOAT |
PROPELLER |
16-Apr-2026 | 1 | - |
| 15 | 281-MM/4/2026 |
HULL - 033 (FINAL) 2501021229 |
CPO BARGE |
AIR SOUNDING PIPE ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 16 | 58-MMBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 16.1 | 58-MMBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
17-Apr-2026 | 1 | |
| 16.2 | 58-MMBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | SHAFTING DETAIL |
17-Apr-2026 | 1 | |
| 17 | 59-MMBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 17.1 | 59-MMBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
17-Apr-2026 | 1 | |
| 17.2 | 59-MMBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | SHAFTING DETAIL |
17-Apr-2026 | 1 | |
| 18 | 289-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 18.1 | 289-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF 02-27-SCH GAS VALVE UNIT SYSTEM |
17-Apr-2026 | 1 | |
| 18.2 | 289-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF 02-26-GAS VALVE UNIT CASING DETAIL |
17-Apr-2026 | 1 | |
| 18.3 | 289-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF02-14- ELECTRONIC CONTROL UNIT DIAGRAM |
17-Apr-2026 | 1 | |
| 18.4 | 289-MM/4/2026 |
ELOK JAYA (DRAW APP) 2504010178 |
OFFSHORE SUPPORT VESSEL | DDF01-24-OPERATION AND MAINTENANCE MANUAL |
17-Apr-2026 | 1 | |
| 19 | 283-MM/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE |
Multiple Items (4 Gambar) |
17-Apr-2026 | 4 | |
| 19.1 | 283-MM/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | SCH COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 19.2 | 283-MM/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | SCH DRAINAGE AND FW-SW SYSTEM |
17-Apr-2026 | 1 | |
| 19.3 | 283-MM/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | SCH BILGE-BALLAST AND FIRE MAIN SYSTEM |
17-Apr-2026 | 1 | |
| 19.4 | 283-MM/4/2026 |
PHL - 180 (FINAL) 2601050013 |
OIL BARGE | SCH FUEL OIL SYSTEM |
17-Apr-2026 | 1 | |
| 20 | 52-MMMK/4/2026 |
(PROPELLER SHAFT & STERN TUBE) BERKAT ANUGRAH - 09 SPOB. 2609040061 |
LANDING CRAFT |
SHAFTING & STERN TUBE DETAILS |
17-Apr-2026 | 1 | - |
| 21 | 53-MMMK/4/2026 |
(PROPELLER) BERKAT ANUGRAH - 10 SPOB. 2609040062 |
SELF PROP.OIL BARGE |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 22 | 293-MM/4/2026 |
H - 471 2401021389 |
SELF PROP.OIL BARGE |
FUEL OIL SYSTEM |
17-Apr-2026 | 1 | - |
| 23 | 61-MMBM/4/2026 |
PS1-00058 (FINAL) 2601020057 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 23.1 | 61-MMBM/4/2026 |
PS1-00058 (FINAL) 2601020057 |
TUG BOAT | SHAFT DETAIL |
17-Apr-2026 | 1 | |
| 23.2 | 61-MMBM/4/2026 |
PS1-00058 (FINAL) 2601020057 |
TUG BOAT | SHAFT INSTALLATION GUIDANCE |
17-Apr-2026 | 1 | |
| 24 | 285-MM/4/2026 |
RAWABI OPAL (TOC) 2412021282 |
ANCHOR HANDLING TUG |
CPP PROPELLER |
17-Apr-2026 | 1 | - |
| 25 | 51-MMMK/4/2026 |
(PROPELLER) BERKAT ANUGRAH - 09 SPOB. 2609040060 |
SELF PROP.OIL BARGE |
PROPELLER DETAIL |
17-Apr-2026 | 1 | - |
| 26 | 54-MMMK/4/2026 |
(PROPELLER SHAFT & STERN TUBE) BERKAT ANUGRAH - 10 SPOB. 2609040063 |
SELF PROP.OIL BARGE |
SHAFTING & STERN TUBEDETAILS |
17-Apr-2026 | 1 | - |
| 27 | 311-MM/4/2026 |
SK-21 2502120131 |
GENERAL CARGO |
Multiple Items (4 Gambar) |
20-Apr-2026 | 4 | |
| 27.1 | 311-MM/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | LAYOUT ENGINE ROOM |
20-Apr-2026 | 1 | |
| 27.2 | 311-MM/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | SCHEMATIC STEERING GEAR HYDRAULIC PIPING SYSTEM |
20-Apr-2026 | 1 | |
| 27.3 | 311-MM/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | CO2 LAYOUT DIAGRAM |
20-Apr-2026 | 1 | |
| 27.4 | 311-MM/4/2026 |
SK-21 2502120131 |
GENERAL CARGO | HIGH PRESSURE CO2 SYSTEM |
20-Apr-2026 | 1 |
HATRI NINRA DAUD, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 321-MM/3/2026 |
ALEXINDO 8 (DRAWING) 2404020414 |
GENERAL CARGO |
SISTEM PIPA BALLAST |
30-Mar-2026 | 1 | - |
| 2 | 32-MM/4/2026 |
EXCELLENT SELATAN 2602040023 |
OIL TANKER |
Multiple Items (3 Gambar) |
02-Apr-2026 | 3 | |
| 2.1 | 32-MM/4/2026 |
EXCELLENT SELATAN 2602040023 |
OIL TANKER | BILGE AND FIRE SYSTEM |
02-Apr-2026 | 1 | |
| 2.2 | 32-MM/4/2026 |
EXCELLENT SELATAN 2602040023 |
OIL TANKER | COOLING SYSTEM |
02-Apr-2026 | 1 | |
| 2.3 | 32-MM/4/2026 |
EXCELLENT SELATAN 2602040023 |
OIL TANKER | FUEL OIL SYSTEM |
02-Apr-2026 | 1 | |
| 3 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE |
Multiple Items (8 Gambar) |
02-Apr-2026 | 8 | |
| 3.1 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | STEERING GEAR SYSTEM |
02-Apr-2026 | 1 | |
| 3.2 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | F.O. SYSTEM |
02-Apr-2026 | 1 | |
| 3.3 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | ENGINE ROOM LAYOUT |
02-Apr-2026 | 1 | |
| 3.4 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | SHAFTING ARRANGEMENT & DETAIL |
02-Apr-2026 | 1 | |
| 3.5 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | EXHAUST GAS SYSTEM |
02-Apr-2026 | 1 | |
| 3.6 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | COOLING SYSTEM |
02-Apr-2026 | 1 | |
| 3.7 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | PROPELLER |
02-Apr-2026 | 1 | |
| 3.8 | 33-MM/4/2026 |
INFINITIE 01 (NOT TOCA) 2602030131 |
SELF PROP.OIL BARGE | CARGO PIPING SYSTEM |
02-Apr-2026 | 1 | |
| 4 | 30-MM/4/2026 |
SMS 160 20 2501140020 |
TUG BOAT |
STEERING GEAR SYSTEM |
02-Apr-2026 | 1 | - |
| 5 | 40-MM/4/2026 |
HENDRA 18 2602030051 |
CREW BOAT |
PIPING SYSTEM |
02-Apr-2026 | 1 | - |
| 6 | 59-MM/4/2026 |
TRANSKO CEMPALA 2412120126 |
TUG BOAT |
PROPELLER |
06-Apr-2026 | 1 | - |
| 7 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE |
Multiple Items (10 Gambar) |
07-Apr-2026 | 10 | |
| 7.1 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | EXHAUST GAS SYSTEM |
07-Apr-2026 | 1 | |
| 7.2 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | SW COOLING SYSTEM |
07-Apr-2026 | 1 | |
| 7.3 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | ENGINE ROOM LAYOUT |
07-Apr-2026 | 1 | |
| 7.4 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | FUEL OIL SYSTEM |
07-Apr-2026 | 1 | |
| 7.5 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | CARGO SYSTEM |
07-Apr-2026 | 1 | |
| 7.6 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | BILGA-GS-FW AND FIRE SYSTEM |
07-Apr-2026 | 1 | |
| 7.7 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | STEERING GEAR SYSTEM |
07-Apr-2026 | 1 | |
| 7.8 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | PROPELLER |
07-Apr-2026 | 1 | |
| 7.9 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | AIR-FILLING AND SOUNDING PIPE |
07-Apr-2026 | 1 | |
| 7.10 | 83-MM/4/2026 |
HULL.NO.007.25 (FINAL) 2501030187 |
SELF PROP.OIL BARGE | SHAFTING DETAIL |
07-Apr-2026 | 1 | |
| 8 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT |
Multiple Items (6 Gambar) |
07-Apr-2026 | 6 | |
| 8.1 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | SHAFTING DETAIL |
07-Apr-2026 | 1 | |
| 8.2 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | SW COOLING SYSTEM |
07-Apr-2026 | 1 | |
| 8.3 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | EXHAUST GAS SYSTEM |
07-Apr-2026 | 1 | |
| 8.4 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | STEERING GEAR SYSTEM |
07-Apr-2026 | 1 | |
| 8.5 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | AIR-FILLING AND SOUNDING PIPE |
07-Apr-2026 | 1 | |
| 8.6 | 86-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT | SHAFTING ARRANGEMENT |
07-Apr-2026 | 1 | |
| 9 | 116-MM/4/2026 |
KMS 113 2501030033 |
TUG BOAT |
PROPELLER |
08-Apr-2026 | 1 | - |
| 10 | 129-MM/4/2026 |
MS25 - 012 FINAL 2501020126 |
TUG BOAT |
OILY WATER SEPARATOR |
09-Apr-2026 | 1 | - |
| 11 | 136-MM/4/2026 |
MTA 888 (PKBL NON TOC) 2602030146 |
CREW BOAT |
Multiple Items (2 Gambar) |
09-Apr-2026 | 2 | |
| 11.1 | 136-MM/4/2026 |
MTA 888 (PKBL NON TOC) 2602030146 |
CREW BOAT | ENGINE ROOM LAYOUT |
09-Apr-2026 | 1 | |
| 11.2 | 136-MM/4/2026 |
MTA 888 (PKBL NON TOC) 2602030146 |
CREW BOAT | PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 12 | 130-MM/4/2026 |
BERKAH PANDAWA 01 2502030170 |
SELF PROP.OIL BARGE |
ENGINE ROOM LAYOUT |
09-Apr-2026 | 1 | - |
| 13 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT |
Multiple Items (6 Gambar) |
10-Apr-2026 | 6 | |
| 13.1 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | ENGINE COOLING SYSTEM |
10-Apr-2026 | 1 | |
| 13.2 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | HYDRAULIC SYSTEM |
10-Apr-2026 | 1 | |
| 13.3 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | ENGINE ROOM LAY OUT |
10-Apr-2026 | 1 | |
| 13.4 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | WATERJET ARRANGEMENT |
10-Apr-2026 | 1 | |
| 13.5 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | FUEL OIL SYSTEM |
10-Apr-2026 | 1 | |
| 13.6 | 154-MM/4/2026 |
KNI 30 (PKBL NON TOC) 2602030155 |
CREW BOAT | BILGE SYSTEM |
10-Apr-2026 | 1 | |
| 14 | 198-MM/4/2026 |
ASL 99 2503030247 |
ACCOMODATION WORK BARGE |
FIXED FIRE SYSTEM |
14-Apr-2026 | 1 | - |
| 15 | 225-MM/4/2026 |
WNL 2 2603020314 |
OIL BARGE |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 15.1 | 225-MM/4/2026 |
WNL 2 2603020314 |
OIL BARGE | CARGO PIPE SYSTEM |
15-Apr-2026 | 1 | |
| 15.2 | 225-MM/4/2026 |
WNL 2 2603020314 |
OIL BARGE | AIR VENT AND SOUNDING PIPE |
15-Apr-2026 | 1 | |
| 16 | 247-MM/4/2026 |
RIVER HORSE 2502030495 |
DREDGER |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 16.1 | 247-MM/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | COUPLING BLOCK LAYOUT |
15-Apr-2026 | 1 | |
| 16.2 | 247-MM/4/2026 |
RIVER HORSE 2502030495 |
DREDGER | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 17 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 17.1 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | ENGINE COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 17.2 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | ENGINE ROOM LAY OUT |
15-Apr-2026 | 1 | |
| 17.3 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | HYDRAULIC SYSTEM |
15-Apr-2026 | 1 | |
| 17.4 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | WATERJET ARRANGEMENT |
15-Apr-2026 | 1 | |
| 17.5 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | FUEL OIL SYSTEM |
15-Apr-2026 | 1 | |
| 17.6 | 245-MM/4/2026 |
KNI 29 (PKBL NON TOC) 2602030162 |
CREW BOAT | BILGE SYSTEM |
15-Apr-2026 | 1 | |
| 18 | 239-MM/4/2026 |
AWB 26 00001 (FINAL) 2601030023 |
TUG BOAT |
DOMESTIC FW AND SANITARY SYSTEM |
15-Apr-2026 | 1 | - |
| 19 | 251-MM/4/2026 |
PIS CEPU (TOCA) 2512020243 |
OIL TANKER |
RUDDER SYSTEM |
15-Apr-2026 | 1 | - |
| 20 | 232-MM/4/2026 |
KPC SRIWIJAYA IX 2504080088 |
PILOT BOAT |
ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | - |
| 21 | 219-MM/4/2026 |
KARYA ANUGERAH 09 2401030343 |
TUG BOAT |
SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | - |
| 22 | 242-MM/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 22.1 | 242-MM/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 22.2 | 242-MM/4/2026 |
SULTAN 888 2602030145 |
CREW BOAT | PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 23 | 253-MM/4/2026 |
DELTA ENERGY 2 2502030429 |
TUG BOAT |
FUEL OIL SYSTEM |
15-Apr-2026 | 1 | - |
| 24 | 274-MM/4/2026 |
SYAHRAH SAVITRI 2602030045 |
OIL TANKER |
BILGE OWS GS FIRE PIPING SYSTEM |
16-Apr-2026 | 1 | - |
| 25 | 275-MM/4/2026 |
PGL 008 EKS CHANG YUAN 008 2402010283 |
SELF PROPELLED BARGE |
SHAFTING DETAIL |
16-Apr-2026 | 1 | - |
| 26 | 271-MM/4/2026 |
PGL 008 EKS CHANG YUAN 008 2402010283 |
SELF PROPELLED BARGE |
SHAFTING ARRANGEMENT |
16-Apr-2026 | 1 | - |
| 27 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE |
Multiple Items (9 Gambar) |
17-Apr-2026 | 9 | |
| 27.1 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | BILGE GS AND FW SYSTEM |
17-Apr-2026 | 1 | |
| 27.2 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | CARGO PIPE SYSTEM |
17-Apr-2026 | 1 | |
| 27.3 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | FUEL OIL SYSTEM |
17-Apr-2026 | 1 | |
| 27.4 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | PROPELLER PLAN |
17-Apr-2026 | 1 | |
| 27.5 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | SHAFTING ARRANGEMENT |
17-Apr-2026 | 1 | |
| 27.6 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | ENGINE ROOM LAYOUT |
17-Apr-2026 | 1 | |
| 27.7 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | SW COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 27.8 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | SOUNDING AIR AND FILLING PIPE |
17-Apr-2026 | 1 | |
| 27.9 | 309-MM/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | SHAFTING DETAIL |
17-Apr-2026 | 1 | |
| 28 | 278-MM/4/2026 |
AWB 26 00002 (FINAL) 2601030024 |
TUG BOAT |
PROPELLER |
17-Apr-2026 | 1 | - |
HERI SISWANTO, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO |
Multiple Items (22 Gambar) |
28-Feb-2026 | 22 | |
| 1.1 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | WO0307272 LTR WO0307272 |
28-Feb-2026 | 1 | |
| 1.2 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62038EQUIPMENT LAYOUT P009 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.3 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62050EQUIPMENT LAYOUT B003 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.4 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62035EQUIPMENT LAYOUT P006 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.5 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62048EQUIPMENT LAYOUT B001 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.6 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62034EQUIPMENT LAYOUT P005 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.7 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62045EQUIPMENT LAYOUT S007 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.8 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | IN-2209-SF3-ABS-00058 |
28-Feb-2026 | 1 | |
| 1.9 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62032EQUIPMENT LAYOUT P003 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.10 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62042EQUIPMENT LAYOUT S004 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.11 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62053EQUIPMENT LAYOUT B006 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.12 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62031EQUIPMENT LAYOUT P002 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.13 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62041EQUIPMENT LAYOUT S003 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.14 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62052EQUIPMENT LAYOUT B005 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.15 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62030EQUIPMENT LAYOUT P001 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.16 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62039EQUIPMENT LAYOUT S001 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.17 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62051EQUIPMENT LAYOUT B004 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.18 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62037EQUIPMENT LAYOUT P008 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.19 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62049EQUIPMENT LAYOUT B002 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.20 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62033EQUIPMENT LAYOUT P004 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.21 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62044EQUIPMENT LAYOUT S006 - PLAN AND ELEVATION VIEWEXDE00 |
28-Feb-2026 | 1 | |
| 1.22 | 422-LL/2/2026 |
HULL NO. CMHI-301-01 2501360013 |
FPSO | 220901BTDG62107FPSO - TOPSIDE GENERAL ARRANGEMENT PLAN AND ELEVATIONEXDE00 |
28-Feb-2026 | 1 | |
| 2 | 43-LL/4/2026 |
SPM 35.000 DWT FT MEDAN 2502360021 |
SINGLE POINT MOORING |
MOORING STRENGTH ANALYSIS |
06-Apr-2026 | 1 | - |
| 3 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
Multiple Items (11 Gambar) |
08-Apr-2026 | 11 | |
| 3.1 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | TYPICAL CROSS SECTION |
08-Apr-2026 | 1 | |
| 3.2 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | RUDDER AND RUDDER STOCK ARRANGEMENT |
08-Apr-2026 | 1 | |
| 3.3 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | TRANSVERSE BULKHEAD CONSTRUCITON |
08-Apr-2026 | 1 | |
| 3.4 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | HATCH COVER ARRANGEMENT AND CONSTRUCTION |
08-Apr-2026 | 1 | |
| 3.5 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | FORE CONSTRUCTION |
08-Apr-2026 | 1 | |
| 3.6 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | HATCH COAMING CONSTRUCTION |
08-Apr-2026 | 1 | |
| 3.7 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | ENGINE FOUNDATION |
08-Apr-2026 | 1 | |
| 3.8 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | GENERAL ARRANGEMENT PLAN |
08-Apr-2026 | 1 | |
| 3.9 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | CONSTRUCTION PROFILE |
08-Apr-2026 | 1 | |
| 3.10 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | SHELL EXPANSION |
08-Apr-2026 | 1 | |
| 3.11 | 76-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO | AFTER CONSTRUCTION |
08-Apr-2026 | 1 | |
| 4 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (15 Gambar) |
09-Apr-2026 | 15 | |
| 4.1 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | AFT AND FOREPEAK CONSTRUCTION 1 OF 3 |
09-Apr-2026 | 1 | |
| 4.2 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | DOOR AND HATCH ARRANGEMENT |
09-Apr-2026 | 1 | |
| 4.3 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 1 OF 4 |
09-Apr-2026 | 1 | |
| 4.4 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | AFT AND FOREPEAK CONSTRUCTION 3 OF 3 |
09-Apr-2026 | 1 | |
| 4.5 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 4 OF 4 |
09-Apr-2026 | 1 | |
| 4.6 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | WELDING SCHEDULE |
09-Apr-2026 | 1 | |
| 4.7 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | ENGINE GIRDER 1 OF 2 |
09-Apr-2026 | 1 | |
| 4.8 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | NDT PLAN 1 OF 2 |
09-Apr-2026 | 1 | |
| 4.9 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | AFT AND FOREPEAK CONSTRUCTION 2 OF 3 |
09-Apr-2026 | 1 | |
| 4.10 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | ENGINE GIRDER 2 OF 2 |
09-Apr-2026 | 1 | |
| 4.11 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | NDT PLAN 2 OF 2 |
09-Apr-2026 | 1 | |
| 4.12 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 2 OF 4 |
09-Apr-2026 | 1 | |
| 4.13 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | ENGINE CASING 1 OF 2 |
09-Apr-2026 | 1 | |
| 4.14 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | BULKHEAD CONSTRUCTION 3 OF 4 |
09-Apr-2026 | 1 | |
| 4.15 | 103-LL/4/2026 |
OCEANNA 25 (FINAL) 2501021531 |
HIGH SPEED PASSANGER VESSEL | ENGINE CASING 2 OF 2 |
09-Apr-2026 | 1 | |
| 5 | 150-LL/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 5.1 | 150-LL/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | CONSTRUCTION PROFILE |
13-Apr-2026 | 1 | |
| 5.2 | 150-LL/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 5.3 | 150-LL/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | MIDSHIP SECTION |
13-Apr-2026 | 1 | |
| 5.4 | 150-LL/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 5.5 | 150-LL/4/2026 |
TRANS OCEAN 2602010128 |
HIGH SPEED PASSANGER VESSEL | ENGINE FOUNDATION |
13-Apr-2026 | 1 | |
| 6 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER |
Multiple Items (22 Gambar) |
14-Apr-2026 | 22 | |
| 6.1 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | MIDSHIP SECTION PLAN |
14-Apr-2026 | 1 | |
| 6.2 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | BOAT DECK AND CASING WALL CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.3 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | UPPER RUDDER STOCK |
14-Apr-2026 | 1 | |
| 6.4 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | SHELL EXPANSION |
14-Apr-2026 | 1 | |
| 6.5 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | NAV BRIDGE DECK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.6 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | LOWER RUDDER STOCK |
14-Apr-2026 | 1 | |
| 6.7 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | STERN CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.8 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | ENGINE FOUNDATION |
14-Apr-2026 | 1 | |
| 6.9 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | RUDDER ARRANGEMENT |
14-Apr-2026 | 1 | |
| 6.10 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | |
| 6.11 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | COMPAS DECK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.12 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | LONGITUDINAL BULKHEAD |
14-Apr-2026 | 1 | |
| 6.13 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | CONTRUCTION PLAN |
14-Apr-2026 | 1 | |
| 6.14 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | POOP CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.15 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | RUDDER BLADE CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.16 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | FORE PEAK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.17 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | CARGO OIL TANK STRUCTURE |
14-Apr-2026 | 1 | |
| 6.18 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | RUDDER SLEEVE |
14-Apr-2026 | 1 | |
| 6.19 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | CAPTAIN DECK AND CASING WALL CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.20 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | TRANSVERSE BULKHEAD -2 |
14-Apr-2026 | 1 | |
| 6.21 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | FORE CASTLE CONSTRUCTION |
14-Apr-2026 | 1 | |
| 6.22 | 170-LL/4/2026 |
CHANGQI 6 (PKBL) 2602010127 |
CHEMICAL TANKER | TRANSVERSE BULKHEAD -1 |
14-Apr-2026 | 1 | |
| 7 | 207-LL/4/2026 |
SEA FLYTE 1802020334 |
PASSENGER SHIP |
Multiple Items (4 Gambar) |
15-Apr-2026 | 4 | |
| 7.1 | 207-LL/4/2026 |
SEA FLYTE 1802020334 |
PASSENGER SHIP | BULKHEAD AND FRAME 1 OF 4 |
15-Apr-2026 | 1 | |
| 7.2 | 207-LL/4/2026 |
SEA FLYTE 1802020334 |
PASSENGER SHIP | BULKHEAD AND FRAME 2 OF 4 |
15-Apr-2026 | 1 | |
| 7.3 | 207-LL/4/2026 |
SEA FLYTE 1802020334 |
PASSENGER SHIP | BULKHEAD AND FRAME 3 OF 4 |
15-Apr-2026 | 1 | |
| 7.4 | 207-LL/4/2026 |
SEA FLYTE 1802020334 |
PASSENGER SHIP | BULKHEAD AND FRAME 4 OF 4 |
15-Apr-2026 | 1 | |
| 8 | 195-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
LONGITUDINAL STRENGTH CAL |
15-Apr-2026 | 1 | - |
| 9 | 225-LL/4/2026 |
KIR 001 (NEW BUILDING - DELIVERY / FINAL) 2501170031 |
SELF PROP.OIL BARGE |
Multiple Items (5 Gambar) |
16-Apr-2026 | 5 | |
| 9.1 | 225-LL/4/2026 |
KIR 001 (NEW BUILDING - DELIVERY / FINAL) 2501170031 |
SELF PROP.OIL BARGE | ENGINE FOUNDATION |
16-Apr-2026 | 1 | |
| 9.2 | 225-LL/4/2026 |
KIR 001 (NEW BUILDING - DELIVERY / FINAL) 2501170031 |
SELF PROP.OIL BARGE | STRUCTURAL FIRE PROTECTION |
16-Apr-2026 | 1 | |
| 9.3 | 225-LL/4/2026 |
KIR 001 (NEW BUILDING - DELIVERY / FINAL) 2501170031 |
SELF PROP.OIL BARGE | RUDDER AND STOCK ASSEMBLY |
16-Apr-2026 | 1 | |
| 9.4 | 225-LL/4/2026 |
KIR 001 (NEW BUILDING - DELIVERY / FINAL) 2501170031 |
SELF PROP.OIL BARGE | DOOR WINDOW SIDE SCUTTLE AND HATCH ARRANGEMENT |
16-Apr-2026 | 1 | |
| 9.5 | 225-LL/4/2026 |
KIR 001 (NEW BUILDING - DELIVERY / FINAL) 2501170031 |
SELF PROP.OIL BARGE | X-RAY PLAN |
16-Apr-2026 | 1 | |
| 10 | 231-LL/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
SUPERSTRUCTURE AND DECK HOUSE CONSTRUCTION |
16-Apr-2026 | 1 | - |
| 11 | 241-LL/4/2026 |
HEBAT (APPROVAL PRB) 2604010133 |
CEMENT CARRIER |
GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 12 | 246-LL/4/2026 |
H - 031 (FINAL) 2501030542 |
OIL TANKER |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 12.1 | 246-LL/4/2026 |
H - 031 (FINAL) 2501030542 |
OIL TANKER | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 12.2 | 246-LL/4/2026 |
H - 031 (FINAL) 2501030542 |
OIL TANKER | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 13 | 267-LL/4/2026 |
LIAN HANG 351 2502120002 |
GENERAL CARGO |
LONGITUDINAL STRENGTH CALCULATION |
17-Apr-2026 | 1 | - |
| 14 | 255-LL/4/2026 |
AL 24 - 09 ABHIMATA 7 2401021478 |
HIGH SPEED PASSANGER VESSEL |
RUDDER AND RUDDER STOCK |
17-Apr-2026 | 1 | - |
HIJRAWATI, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 7-MMSS/2/2026 |
CENDRAWASIH PARADISE EX SINAR MINAHASA - DRAWING APPROVAL - IHM (VSCP) 2605090026 |
OIL/CHEMICAL TANKER |
Multiple Items (4 Gambar) |
24-Feb-2026 | 4 | |
| 1.1 | 7-MMSS/2/2026 |
CENDRAWASIH PARADISE EX SINAR MINAHASA - DRAWING APPROVAL - IHM (VSCP) 2605090026 |
OIL/CHEMICAL TANKER | IHM MAINTENANCE RECORD |
24-Feb-2026 | 1 | |
| 1.2 | 7-MMSS/2/2026 |
CENDRAWASIH PARADISE EX SINAR MINAHASA - DRAWING APPROVAL - IHM (VSCP) 2605090026 |
OIL/CHEMICAL TANKER | IHM MANUAL PART I |
24-Feb-2026 | 1 | |
| 1.3 | 7-MMSS/2/2026 |
CENDRAWASIH PARADISE EX SINAR MINAHASA - DRAWING APPROVAL - IHM (VSCP) 2605090026 |
OIL/CHEMICAL TANKER | IHM MANUAL PART I-REVISION |
24-Feb-2026 | 1 | |
| 1.4 | 7-MMSS/2/2026 |
CENDRAWASIH PARADISE EX SINAR MINAHASA - DRAWING APPROVAL - IHM (VSCP) 2605090026 |
OIL/CHEMICAL TANKER | STATEMENT OF COMPLIANCE INTERNTIONAL IHM |
24-Feb-2026 | 1 | |
| 2 | 63-MMMK/3/2026 |
(PROPELLER) BIAK - 56 TB. 2609090047 |
TUG BOAT |
PROPELLER DRAWING |
25-Mar-2026 | 1 | - |
| 3 | 65-MMMK/3/2026 |
(PROPELLER STOCK (IDN26005)(RH-E202986/LH-E202987)) NAKASHIMA PHILIPPINES CORPORATION 2609090044 |
TUG BOAT |
PROPELLER DRAWING |
25-Mar-2026 | 1 | - |
| 4 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT |
Multiple Items (7 Gambar) |
01-Apr-2026 | 7 | |
| 4.1 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | SWCOOLING |
01-Apr-2026 | 1 | |
| 4.2 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | BILGE SYSTEM |
01-Apr-2026 | 1 | |
| 4.3 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | STEERING GEAR SYSTEM |
01-Apr-2026 | 1 | |
| 4.4 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | SHAFTING ARRANGEMENT |
01-Apr-2026 | 1 | |
| 4.5 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | FOSYSTEM |
01-Apr-2026 | 1 | |
| 4.6 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | PROPELLER PLAN |
01-Apr-2026 | 1 | |
| 4.7 | 3-MM/4/2026 |
T - 42 / KINGSTON - 171 2401030461 |
TUG BOAT | SHAFTING DETAIL |
01-Apr-2026 | 1 | |
| 5 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER |
Multiple Items (21 Gambar) |
02-Apr-2026 | 21 | |
| 5.1 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | SEA WATER FIRE PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.2 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | FIRE AND BALLAST PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.3 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | SHAFTING ARRANGEMENT |
02-Apr-2026 | 1 | |
| 5.4 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | SEA WATER COOLING PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.5 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | COMPRESSED AIR PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.6 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | LUBRICATING OIL SYSTEM PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.7 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | PUMP PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.8 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | CO2 FIRE EXTINGUISHER SYSTEM |
02-Apr-2026 | 1 | |
| 5.9 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | THERMAL EQUILIBRIUM PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.10 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | FUEL OIL SYSTEM PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.11 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | PROPELLER |
02-Apr-2026 | 1 | |
| 5.12 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | LOW TEMP FRESH WATER AE PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.13 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | BILGE PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.14 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | LOW TEMP FRESH WATER ME PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.15 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | STEAM PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.16 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | ENGINE ROOM LAYOUT |
02-Apr-2026 | 1 | |
| 5.17 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | STARTING AIR PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.18 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | FRESH WATER SERVICE PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.19 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | CLEAN DRAIN PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.20 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | HIGH TEMP FRESH WATER AE PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 5.21 | 34-MM/4/2026 |
DHARMA RUCITRA V 2502040293 |
PASSENGER AND CAR CARRIER | SEWAGE AND DRAINAGE PIPE DIAGRAM |
02-Apr-2026 | 1 | |
| 6 | 19-MM/4/2026 |
SS STAR (FINAL) 2501030167 |
SELF PROP.OIL BARGE |
Multiple Items (3 Gambar) |
02-Apr-2026 | 3 | |
| 6.1 | 19-MM/4/2026 |
SS STAR (FINAL) 2501030167 |
SELF PROP.OIL BARGE | PROPELLER DETAIL |
02-Apr-2026 | 1 | |
| 6.2 | 19-MM/4/2026 |
SS STAR (FINAL) 2501030167 |
SELF PROP.OIL BARGE | SCUPPER SYSTEM |
02-Apr-2026 | 1 | |
| 6.3 | 19-MM/4/2026 |
SS STAR (FINAL) 2501030167 |
SELF PROP.OIL BARGE | PUMP ROOM VENTILATION |
02-Apr-2026 | 1 | |
| 7 | 70-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
06-Apr-2026 | 2 | |
| 7.1 | 70-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | PROPELLER SHAFT AND STERN TUBE |
06-Apr-2026 | 1 | |
| 7.2 | 70-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | PROPELLER BLADE |
06-Apr-2026 | 1 | |
| 8 | 64-MM/4/2026 |
RYUOH (PKBL) 2502021093 |
CEMENT CARRIER |
ELECTRIC HYDRAULIC STEERING GEAR SYSTEM (INCLUDING PIPING SYSTEM) |
06-Apr-2026 | 1 | - |
| 9 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT |
Multiple Items (13 Gambar) |
07-Apr-2026 | 13 | |
| 9.1 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF COOLING SYSTEM |
07-Apr-2026 | 1 | |
| 9.2 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | ENGINE ROOM LAYOUT |
07-Apr-2026 | 1 | |
| 9.3 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF EXHAUST PIPE SYSTEM |
07-Apr-2026 | 1 | |
| 9.4 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF BILGE BALLAST FIRE SYSTEM |
07-Apr-2026 | 1 | |
| 9.5 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | CHOCKFAST CALCULATION |
07-Apr-2026 | 1 | |
| 9.6 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF FUEL OIL SYSTEM |
07-Apr-2026 | 1 | |
| 9.7 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | PROPELLER DETAIL |
07-Apr-2026 | 1 | |
| 9.8 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF LUBRICATING OIL SYSTEM |
07-Apr-2026 | 1 | |
| 9.9 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF DOMESTIC SANITARY SYSTEM |
07-Apr-2026 | 1 | |
| 9.10 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF BLACK AND GREY SYSTEM |
07-Apr-2026 | 1 | |
| 9.11 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | STEERING GEAR ARR AND DETAIL |
07-Apr-2026 | 1 | |
| 9.12 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SCHEMATIC OF AIR PIPE SYSTEM |
07-Apr-2026 | 1 | |
| 9.13 | 7-MMI/4/2026 |
GMS CEMERLANG 1 (PKBL TOCA) 2612120043 |
TUG BOAT | SHAFTING AND STERNTUBE ARRANGEMENT |
07-Apr-2026 | 1 | |
| 10 | 89-MM/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT |
Multiple Items (5 Gambar) |
07-Apr-2026 | 5 | |
| 10.1 | 89-MM/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | SOUNDING FILLING AND AIR PIPE |
07-Apr-2026 | 1 | |
| 10.2 | 89-MM/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | OILY WATER SEPARATOR SYSTEM |
07-Apr-2026 | 1 | |
| 10.3 | 89-MM/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | SCHEMATIC BILGE BALLAST AND FIRE MAIN SYSTEM |
07-Apr-2026 | 1 | |
| 10.4 | 89-MM/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | FUEL OIL SYSTEM |
07-Apr-2026 | 1 | |
| 10.5 | 89-MM/4/2026 |
CATHAY 68 2602100013 |
TUG BOAT | SCHEMATIC COOLING SYSTEM |
07-Apr-2026 | 1 | |
| 11 | 75-MM/4/2026 |
SYS FORTUNA 88 2503160016 |
OIL/CHEMICAL TANKER |
Multiple Items (2 Gambar) |
07-Apr-2026 | 2 | |
| 11.1 | 75-MM/4/2026 |
SYS FORTUNA 88 2503160016 |
OIL/CHEMICAL TANKER | ENGINE ROOM AND PUMP ROOM VENTILATION |
07-Apr-2026 | 1 | |
| 11.2 | 75-MM/4/2026 |
SYS FORTUNA 88 2503160016 |
OIL/CHEMICAL TANKER | AIR PIPE FILLING PIPE SOUNDING PIPE AND CARGO TANK VENT SYSTEM |
07-Apr-2026 | 1 | |
| 12 | 106-MM/4/2026 |
TRANSHIP II 2604040047 |
PASSANGER FERRY |
Multiple Items (3 Gambar) |
08-Apr-2026 | 3 | |
| 12.1 | 106-MM/4/2026 |
TRANSHIP II 2604040047 |
PASSANGER FERRY | INTERMEDIATE SHAFT |
08-Apr-2026 | 1 | |
| 12.2 | 106-MM/4/2026 |
TRANSHIP II 2604040047 |
PASSANGER FERRY | SHAFT PROPELLER |
08-Apr-2026 | 1 | |
| 12.3 | 106-MM/4/2026 |
TRANSHIP II 2604040047 |
PASSANGER FERRY | LAYOUT ENGINE ROOM |
08-Apr-2026 | 1 | |
| 13 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Multiple Items (14 Gambar) |
09-Apr-2026 | 14 | |
| 13.1 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | FUEL OIL SYSTEM |
09-Apr-2026 | 1 | |
| 13.2 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | ENGINE ROOM AND PUMP ROOM ARRANGEMENT |
09-Apr-2026 | 1 | |
| 13.3 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | OILY WATER SEPARATOR AND LUBE OIL SYSTEM |
09-Apr-2026 | 1 | |
| 13.4 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | ENGINE COOLING SYSTEM |
09-Apr-2026 | 1 | |
| 13.5 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | SOUNDING FILLING AND AIR VENT PIPE |
09-Apr-2026 | 1 | |
| 13.6 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | FIXED FOAM FIRE FIGHTING SYSTEM |
09-Apr-2026 | 1 | |
| 13.7 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | CARGO OIL PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 13.8 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | PUMP ROOM VENT AND EXHAUST GAS PIPE |
09-Apr-2026 | 1 | |
| 13.9 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | FIXED CO2 FIRE FIGHTING SYSTEM |
09-Apr-2026 | 1 | |
| 13.10 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | BILGE GS AND FIRE MAIN SYSTEM |
09-Apr-2026 | 1 | |
| 13.11 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | PROPELLER PLAN |
09-Apr-2026 | 1 | |
| 13.12 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | STEERING GEAR LAYOUT AND SYSTEM |
09-Apr-2026 | 1 | |
| 13.13 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | DOMESTIC FW SW AND SANITARY DISCHARGE SYSTEM |
09-Apr-2026 | 1 | |
| 13.14 | 125-MM/4/2026 |
HULL XXX (FINAL) 2501120136 |
SELF PROPELLED OIL/CHEMICAL BARGE | SHAFTING ARRANGEMENT AND DETAILS |
09-Apr-2026 | 1 | |
| 14 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT |
Multiple Items (15 Gambar) |
09-Apr-2026 | 15 | |
| 14.1 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SHAFTING DETAIL Rev.A |
09-Apr-2026 | 1 | |
| 14.2 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC DOMESTIC HOT WATER & F.W. SUPPLY & DISCHARGE SYSTEM |
09-Apr-2026 | 1 | |
| 14.3 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SHAFTING DETAIL |
09-Apr-2026 | 1 | |
| 14.4 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC COOLING SYSTEM |
09-Apr-2026 | 1 | |
| 14.5 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SEA CHEST DETAIL |
09-Apr-2026 | 1 | |
| 14.6 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC OILY WATER SYSTEM |
09-Apr-2026 | 1 | |
| 14.7 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | STEERING GEAR LAYOUT DETAIL |
09-Apr-2026 | 1 | |
| 14.8 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | VENTILATION ARRANGEMENT |
09-Apr-2026 | 1 | |
| 14.9 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | PROPELLER |
09-Apr-2026 | 1 | |
| 14.10 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
09-Apr-2026 | 1 | |
| 14.11 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC BILGE, BALLAST AND FIRE-MAIN SYSTEM |
09-Apr-2026 | 1 | |
| 14.12 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SHAFTING ARRANGEMENT |
09-Apr-2026 | 1 | |
| 14.13 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC FUEL OIL TRANSFER SYSTEM |
09-Apr-2026 | 1 | |
| 14.14 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC TANK VENT, SOUNDING & FILLING SYSTEM |
09-Apr-2026 | 1 | |
| 14.15 | 8-MMI/4/2026 |
BAHAR 2225 2612070019 |
TUG BOAT | SCHEMATIC LUBE OIL SYSTEM |
09-Apr-2026 | 1 | |
| 15 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT |
Multiple Items (11 Gambar) |
09-Apr-2026 | 11 | |
| 15.1 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SCHEMATIC LUBE OIL PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 15.2 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SCHEMATIC OILY BILGE PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 15.3 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SCHEMATIC FUEL OIL PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 15.4 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SCHEMATIC BILGE, BALLAST AND FIRE MAIN PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 15.5 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SHAFTING DETAILS |
09-Apr-2026 | 1 | |
| 15.6 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
09-Apr-2026 | 1 | |
| 15.7 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SHAFTING ARRANGEMENT |
09-Apr-2026 | 1 | |
| 15.8 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SCHEMATIC DOMESTIC F.W. & SANITARY SUPPLY PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 15.9 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | PROPELLER DETAILS PLAN |
09-Apr-2026 | 1 | |
| 15.10 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | STEERING GEAR LAYOUT DETAILS |
09-Apr-2026 | 1 | |
| 15.11 | 9-MMI/4/2026 |
PING (PKBL TOC) 2612030123 |
TUG BOAT | SCHEMATIC VENT, SOUNDING AND FILLING PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 16 | 127-MM/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER |
Multiple Items (4 Gambar) |
09-Apr-2026 | 4 | |
| 16.1 | 127-MM/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER | EXHAUST GAS PIPING SYSTEM |
09-Apr-2026 | 1 | |
| 16.2 | 127-MM/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER | ENGINE ROOM LAYOUT |
09-Apr-2026 | 1 | |
| 16.3 | 127-MM/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER | COOLING SYSTEM |
09-Apr-2026 | 1 | |
| 16.4 | 127-MM/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER | FUEL OIL SYSTEM |
09-Apr-2026 | 1 | |
| 17 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT |
Multiple Items (14 Gambar) |
10-Apr-2026 | 14 | |
| 17.1 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Engine Room Layout |
10-Apr-2026 | 1 | |
| 17.2 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Shafting Arrangement |
10-Apr-2026 | 1 | |
| 17.3 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Oily Water Separator System |
10-Apr-2026 | 1 | |
| 17.4 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | VENTILATION LAYOUT |
10-Apr-2026 | 1 | |
| 17.5 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Fuel Oil System |
10-Apr-2026 | 1 | |
| 17.6 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Shafting Detail |
10-Apr-2026 | 1 | |
| 17.7 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Propeller |
10-Apr-2026 | 1 | |
| 17.8 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Filling Air Vent AND Sounding Type System |
10-Apr-2026 | 1 | |
| 17.9 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Steering Gear Layout |
10-Apr-2026 | 1 | |
| 17.10 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | BILGE BALLAST AND FIRE MAIN SYSTEM |
10-Apr-2026 | 1 | |
| 17.11 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Sea water Cooling System |
10-Apr-2026 | 1 | |
| 17.12 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Fresh Water Sea Water Sanitary System |
10-Apr-2026 | 1 | |
| 17.13 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Sea Chest Detail |
10-Apr-2026 | 1 | |
| 17.14 | 13-MMI/4/2026 |
PACIFIC TWENTY SIX 2612130009 |
TUG BOAT | Stern Tube Detail |
10-Apr-2026 | 1 | |
| 18 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT |
Multiple Items (14 Gambar) |
10-Apr-2026 | 14 | |
| 18.1 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | OILY WATER SEPERATOR SYSTEM LAYOUT |
10-Apr-2026 | 1 | |
| 18.2 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | VENTILATION DETAILS |
10-Apr-2026 | 1 | |
| 18.3 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | DOMESTIC FW SUPPLY AND SW SANITARY SYSTEM |
10-Apr-2026 | 1 | |
| 18.4 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | ENGINE ROOM LAYOUT |
10-Apr-2026 | 1 | |
| 18.5 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | SHAFTING DETAIL |
10-Apr-2026 | 1 | |
| 18.6 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | FILLING PIPE AIR ESCAPE VENT AND SOUNDING PIPE |
10-Apr-2026 | 1 | |
| 18.7 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | STERN TUBE DETAIL |
10-Apr-2026 | 1 | |
| 18.8 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | SEA CHEST DETAIL |
10-Apr-2026 | 1 | |
| 18.9 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | SCHEMATIC BILGE BALLAST AND FIREMAIN SYSTEM |
10-Apr-2026 | 1 | |
| 18.10 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | ENGINES COOLING SYSTEM |
10-Apr-2026 | 1 | |
| 18.11 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | SHIPS FUEL SYSTEM |
10-Apr-2026 | 1 | |
| 18.12 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | POSITION OF TANK VENTS SOUNDING AND FILLING PIPE |
10-Apr-2026 | 1 | |
| 18.13 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | SHAFTING ARRANGEMENT |
10-Apr-2026 | 1 | |
| 18.14 | 10-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | CREWS SPACE EMERGENCY EXIT AND WINDLASS HYDRAULIC PUMP LOCKET LAYOUT |
10-Apr-2026 | 1 | |
| 19 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT |
Multiple Items (15 Gambar) |
10-Apr-2026 | 15 | |
| 19.1 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Black AND Grey Water Discharge System Layout 1-2 |
10-Apr-2026 | 1 | |
| 19.2 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Schematic Domestic FW Supply SW Sanitary AND Sewage Drainage System |
10-Apr-2026 | 1 | |
| 19.3 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Filling PipeAir Escape Vent AND Sounding Pipe |
10-Apr-2026 | 1 | |
| 19.4 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Ship s Fuel System |
10-Apr-2026 | 1 | |
| 19.5 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Black AND Grey Water Discharge System Layout 2-2 |
10-Apr-2026 | 1 | |
| 19.6 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Sea Chest Details |
10-Apr-2026 | 1 | |
| 19.7 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | ME AND AE Exhaust Pipe Arrangement |
10-Apr-2026 | 1 | |
| 19.8 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Steering Gear Layout Details |
10-Apr-2026 | 1 | |
| 19.9 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Engine Cooling System |
10-Apr-2026 | 1 | |
| 19.10 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Shafting Arrangement |
10-Apr-2026 | 1 | |
| 19.11 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Position of Tank VentsSounding AND Filling Pipes |
10-Apr-2026 | 1 | |
| 19.12 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Engine Room Layout |
10-Apr-2026 | 1 | |
| 19.13 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | OWS System Layout |
10-Apr-2026 | 1 | |
| 19.14 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Shafting Details |
10-Apr-2026 | 1 | |
| 19.15 | 14-MMI/4/2026 |
SLM HERAKLES 1 2612180026 |
TUG BOAT | Stern Tube Details |
10-Apr-2026 | 1 | |
| 20 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE |
Multiple Items (8 Gambar) |
10-Apr-2026 | 8 | |
| 20.1 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | BILGE FIRE-FIGTHING SYSTEM |
10-Apr-2026 | 1 | |
| 20.2 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | COOLING SYSTEM DIAGRAM |
10-Apr-2026 | 1 | |
| 20.3 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | AIR VENT AND SOUNDING SYSTEM |
10-Apr-2026 | 1 | |
| 20.4 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | EXHAUST GAS ARRANGEMENT |
10-Apr-2026 | 1 | |
| 20.5 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | FUEL OIL SYSTEM |
10-Apr-2026 | 1 | |
| 20.6 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | ENGINE ROOM AND PUMP ROOM ARRANGEMENT |
10-Apr-2026 | 1 | |
| 20.7 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | CALCULATION OF FIXED CO2 FIRE-EXTINGUSHING SYSTEM |
10-Apr-2026 | 1 | |
| 20.8 | 11-MMI/4/2026 |
SLM ARTEMIS 2 2612010130 |
OIL BARGE | FIXED CO2 FIRE-EXTINGUSHING SYSTEM |
10-Apr-2026 | 1 | |
| 21 | 162-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER |
Multiple Items (2 Gambar) |
10-Apr-2026 | 2 | |
| 21.1 | 162-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | EMERGENCY GENERATOR ROOM ARRANGEMENT PIPING |
10-Apr-2026 | 1 | |
| 21.2 | 162-MM/4/2026 |
GUO YANG 178 2602110008 |
OIL TANKER | CARGO OIL TANK VENTILATION AND SOUNDING PIPING DIAGRAM |
10-Apr-2026 | 1 | |
| 22 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE |
Multiple Items (9 Gambar) |
10-Apr-2026 | 9 | |
| 22.1 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | FUEL OIL SYSTEM |
10-Apr-2026 | 1 | |
| 22.2 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | ENGINE COOLING SYSTEM |
10-Apr-2026 | 1 | |
| 22.3 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | ENGINE ROOM LAYOUT |
10-Apr-2026 | 1 | |
| 22.4 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | STEERING GEAR SYSTEM |
10-Apr-2026 | 1 | |
| 22.5 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | BILGE GS AND FIRE MAIN SYSTEM |
10-Apr-2026 | 1 | |
| 22.6 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | PROPELLER |
10-Apr-2026 | 1 | |
| 22.7 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | CARGO OIL PIPING SYSTEM |
10-Apr-2026 | 1 | |
| 22.8 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | SOUNDING FILLING AND AIR PIPE |
10-Apr-2026 | 1 | |
| 22.9 | 150-MM/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | SHAFTING ARRANGEMENT AND DETAILS |
10-Apr-2026 | 1 | |
| 23 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT |
Multiple Items (11 Gambar) |
13-Apr-2026 | 11 | |
| 23.1 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SCHEMATIC DOMESTIC F.W. & SANITARY SUPPLY PIPING SYSTEM |
13-Apr-2026 | 1 | |
| 23.2 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | PROPELLER DETAILS PLAN |
13-Apr-2026 | 1 | |
| 23.3 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SCHEMATIC VENT, SOUNDING AND FILLING PIPING SYSTEM |
13-Apr-2026 | 1 | |
| 23.4 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SCHEMATIC FUEL OIL PIPING SYSTEM |
13-Apr-2026 | 1 | |
| 23.5 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | STEERING GEAR LAYOUT DETAILS |
13-Apr-2026 | 1 | |
| 23.6 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SCHEMATIC LUBE OIL PIPING SYSTEM |
13-Apr-2026 | 1 | |
| 23.7 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SCHEMATIC BILGE, BALLAST AND FIRE MAIN PIPING SYSTEM |
13-Apr-2026 | 1 | |
| 23.8 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SHAFTING DETAILS |
13-Apr-2026 | 1 | |
| 23.9 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SCHEMATIC OILY BILGE PIPING SYSTEM |
13-Apr-2026 | 1 | |
| 23.10 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
13-Apr-2026 | 1 | |
| 23.11 | 15-MMI/4/2026 |
YI (PKBL TOC) 2612030122 |
TUG BOAT | SHAFTING ARRANGEMENT |
13-Apr-2026 | 1 | |
| 24 | 16-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 24.1 | 16-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | STEERING GEAR LAYOUT DETAILS |
13-Apr-2026 | 1 | |
| 24.2 | 16-MMI/4/2026 |
MBP 122 (TOC) 2612070022 |
TUG BOAT | ENGINE AND GENERATOR EXHAUST PIPE |
13-Apr-2026 | 1 | |
| 25 | 218-MM/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER |
Multiple Items (5 Gambar) |
14-Apr-2026 | 5 | |
| 25.1 | 218-MM/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | FO SYSTEM |
14-Apr-2026 | 1 | |
| 25.2 | 218-MM/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | STEERING HYD SYSTEM |
14-Apr-2026 | 1 | |
| 25.3 | 218-MM/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | ENGINE ROOM LAYOUT |
14-Apr-2026 | 1 | |
| 25.4 | 218-MM/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | SW COOLING SYSTEM |
14-Apr-2026 | 1 | |
| 25.5 | 218-MM/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER | SHAFT AND STERN TUBE DETAIL |
14-Apr-2026 | 1 | |
| 26 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER |
Multiple Items (19 Gambar) |
15-Apr-2026 | 19 | |
| 26.1 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | FUEL OIL SUPPLY SYSTEM |
15-Apr-2026 | 1 | |
| 26.2 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | SHIPS BALLAST WATER PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 26.3 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | ER BILGEBALLASTFIRE EXTINGUISHING SYSTEM |
15-Apr-2026 | 1 | |
| 26.4 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | PUMP ROOM VENTILATION |
15-Apr-2026 | 1 | |
| 26.5 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | AE COOLING WATER PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 26.6 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | FUEL OIL TRANSFER SYSTEM |
15-Apr-2026 | 1 | |
| 26.7 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | SHIPS BILGEFIRE EXTINGUISHING PIPING DRAWING |
15-Apr-2026 | 1 | |
| 26.8 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | ENGINE ROOM ARRANGEMENT |
15-Apr-2026 | 1 | |
| 26.9 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | SCHEMATIC DIAGRAM OF STEERING GEAR HYDRAULIC SYSTEM |
15-Apr-2026 | 1 | |
| 26.10 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | EXHAUST GAS PIPING DIAGRAM |
15-Apr-2026 | 1 | |
| 26.11 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 26.12 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | CO2 SYSTEM |
15-Apr-2026 | 1 | |
| 26.13 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | PROPELLER |
15-Apr-2026 | 1 | |
| 26.14 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | BILGE OILY WATER SEPARATOR SYSTEM |
15-Apr-2026 | 1 | |
| 26.15 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | INTERMEDIATE SHAFT |
15-Apr-2026 | 1 | |
| 26.16 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | SOUNDINGFILLINGVENT PIPING DRAWING |
15-Apr-2026 | 1 | |
| 26.17 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | CARGO OIL SYSTEM |
15-Apr-2026 | 1 | |
| 26.18 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | ME COOLING WATER PIPING SYSTEM |
15-Apr-2026 | 1 | |
| 26.19 | 240-MM/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | STERN SHAFT AND STERNTUBE ASSEMBLY |
15-Apr-2026 | 1 | |
| 27 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
Multiple Items (10 Gambar) |
16-Apr-2026 | 10 | |
| 27.1 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | FIRE FIGHTING SYSTEM |
16-Apr-2026 | 1 | |
| 27.2 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | FW COOLING AND SERVICE SYSTEM |
16-Apr-2026 | 1 | |
| 27.3 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | AIR PRESSURE SYSTEM |
16-Apr-2026 | 1 | |
| 27.4 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | STEERING GEAR SYSTEM |
16-Apr-2026 | 1 | |
| 27.5 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | LUBRICATING OIL SYSTEM |
16-Apr-2026 | 1 | |
| 27.6 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | EXHAUST GAS AND MIST SYSTEM |
16-Apr-2026 | 1 | |
| 27.7 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | CO2 SYSTEM |
16-Apr-2026 | 1 | |
| 27.8 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | BILGE AND BALAST SYSTEM |
16-Apr-2026 | 1 | |
| 27.9 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | SW COOLING SYSTEM |
16-Apr-2026 | 1 | |
| 27.10 | 276-MM/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | FUEL OIL SYSTEM |
16-Apr-2026 | 1 | |
| 28 | 270-MM/4/2026 |
TRANSHIP II 2604040047 |
PASSANGER FERRY |
SHAFTING LAYOUT CONSTRUCTION |
16-Apr-2026 | 1 | - |
| 29 | 17-MMI/4/2026 |
OCEAN PHOENIX (PKBL TOCA) 2612120033 |
BULK CARRIER |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 29.1 | 17-MMI/4/2026 |
OCEAN PHOENIX (PKBL TOCA) 2612120033 |
BULK CARRIER | PROPELLER SHAFT |
17-Apr-2026 | 1 | |
| 29.2 | 17-MMI/4/2026 |
OCEAN PHOENIX (PKBL TOCA) 2612120033 |
BULK CARRIER | INTERMEDIATE SHAFT |
17-Apr-2026 | 1 | |
| 30 | 299-MM/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE |
MAIN FIRE FIGHTING PIPING SYSTEM |
17-Apr-2026 | 1 | - |
| 31 | 236-MM/4/2026 |
SEA FLYTE 1802020334 |
PASSENGER SHIP |
PROPELLER DESIGN |
20-Apr-2026 | 1 | - |
I GUSTI PUTU SUANTARA, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 24-LLBM/4/2026 |
HULL - 037 (FINAL) 2601020058 |
CPO BARGE |
Multiple Items (5 Gambar) |
01-Apr-2026 | 5 | |
| 1.1 | 24-LLBM/4/2026 |
HULL - 037 (FINAL) 2601020058 |
CPO BARGE | NDT PLAN 1-2 |
01-Apr-2026 | 1 | |
| 1.2 | 24-LLBM/4/2026 |
HULL - 037 (FINAL) 2601020058 |
CPO BARGE | WELDING SCHEDULE |
01-Apr-2026 | 1 | |
| 1.3 | 24-LLBM/4/2026 |
HULL - 037 (FINAL) 2601020058 |
CPO BARGE | NDT PLAN 2-2 |
01-Apr-2026 | 1 | |
| 1.4 | 24-LLBM/4/2026 |
HULL - 037 (FINAL) 2601020058 |
CPO BARGE | SHELL EXPANSION |
01-Apr-2026 | 1 | |
| 1.5 | 24-LLBM/4/2026 |
HULL - 037 (FINAL) 2601020058 |
CPO BARGE | DECKHOUSE CONSTRUCTION |
01-Apr-2026 | 1 | |
| 2 | 3-LLBM/4/2026 |
HULL - 390 (FINAL) 2601020086 |
OIL/CHEMICAL BARGE |
FORE PEAK CONSTRUCTION |
01-Apr-2026 | 1 | - |
| 3 | 2-LLBM/4/2026 |
HULL - 032 (FINAL) 2501021179 |
CPO BARGE |
DOOR HATCH WINDOW SIDE SCUTTLE ARRANGEMENT |
01-Apr-2026 | 1 | - |
| 4 | 14-LLBM/4/2026 |
H - 958 (FINAL) 2501021273 |
SELF PROPELLED OIL/CHEMICAL BARGE |
RUDDER AND RUDDER STOCK CONSTRUCTION |
01-Apr-2026 | 1 | - |
| 5 | 34-LLBM/4/2026 |
H - 551 (FINAL) 2501020814 |
CPO BARGE |
X RAY PLAN |
02-Apr-2026 | 1 | - |
| 6 | 32-LLBM/4/2026 |
H - 585 (FINAL) 2501021363 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Flysheet Air Hole Detail Welding Access |
02-Apr-2026 | 1 | - |
| 7 | 27-LLBM/4/2026 |
KTU - 2190 (FINAL) 2501021540 |
PONTOON |
GENERAL ARRANGEMENT-REV 0 |
02-Apr-2026 | 1 | - |
| 8 | 60-LLBM/4/2026 |
HULL - 034 (FINAL) 2501021412 |
CPO BARGE |
LONG STRENGTH CALCULATION CPO SAMUDRA SINDO 39 H-034 |
06-Apr-2026 | 1 | - |
| 9 | 70-LLBM/4/2026 |
HULL - 422 (FINAL) 2601020019 |
CPO BARGE |
PRELIMINARY LONG STRENGTH CALCULATION |
06-Apr-2026 | 1 | - |
| 10 | 44-LLBM/4/2026 |
H - 004 (FINAL) 2501020319 |
SELF PROPELLED OIL/CHEMICAL BARGE |
DOOR HATCH AND WINDOW |
06-Apr-2026 | 1 | - |
| 11 | 48-LLBM/4/2026 |
H - 585 (FINAL) 2501021363 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Window Door Hatch Side Scuttle Arr |
06-Apr-2026 | 1 | - |
| 12 | 49-LLBM/4/2026 |
H - 585 (FINAL) 2501021363 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Fresh Water Hacth |
06-Apr-2026 | 1 | - |
| 13 | 84-LLBM/4/2026 |
H - 087 (FINAL) 2601020222 |
PONTOON |
Longitudinal Strength Calculation |
07-Apr-2026 | 1 | - |
| 14 | 104-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE |
Multiple Items (2 Gambar) |
08-Apr-2026 | 2 | |
| 14.1 | 104-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE | DOOR WINDOWS SIDESCUTTLES ARRANGEMENT |
08-Apr-2026 | 1 | |
| 14.2 | 104-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE | MANHOLE AND HATCH COVER ARRANGEMENT |
08-Apr-2026 | 1 | |
| 15 | 102-LLBM/4/2026 |
H - 555 2401021192 |
PONTOON |
H555 FINAL LONGITUDINAL STRENGTH |
08-Apr-2026 | 1 | - |
| 16 | 121-LLBM/4/2026 |
BG - 062 2401021325 |
PONTOON |
FINAL LONGITUDINAL STRENGTH - BG062 |
09-Apr-2026 | 1 | - |
| 17 | 118-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE |
Multiple Items (2 Gambar) |
09-Apr-2026 | 2 | |
| 17.1 | 118-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE | TRANSVERSE SECTION 1 OF 2 |
09-Apr-2026 | 1 | |
| 17.2 | 118-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE | TRANSVERSE SECTION 2 OF 2 |
09-Apr-2026 | 1 | |
| 18 | 120-LLBM/4/2026 |
BG - 061 2401021324 |
PONTOON |
FINAL LONGITUDINAL STRENGTH - BG061 |
09-Apr-2026 | 1 | - |
| 19 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Multiple Items (11 Gambar) |
13-Apr-2026 | 11 | |
| 19.1 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | DECK STRUCTURE I W O WINDLASS |
13-Apr-2026 | 1 | |
| 19.2 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | DECK STRUCTURE I W O BOLLARD |
13-Apr-2026 | 1 | |
| 19.3 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | PROFILE CONSTRUCTION |
13-Apr-2026 | 1 | |
| 19.4 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SHELL EXPANSION |
13-Apr-2026 | 1 | |
| 19.5 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | GENERAL ARRANGEMENT |
13-Apr-2026 | 1 | |
| 19.6 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | N D T PLAN 3 OF 3 |
13-Apr-2026 | 1 | |
| 19.7 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | N D T PLAN 2 OF 3 |
13-Apr-2026 | 1 | |
| 19.8 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | INNERSIDE MAIN DECK AND RAISED DECK PLAN |
13-Apr-2026 | 1 | |
| 19.9 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | MIDSHIP SECTION |
13-Apr-2026 | 1 | |
| 19.10 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | BOTTOM AND INNER BOTTOM PLAN |
13-Apr-2026 | 1 | |
| 19.11 | 131-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | N D T PLAN 1 OF 3 |
13-Apr-2026 | 1 | |
| 20 | 139-LLBM/4/2026 |
H - 585 (FINAL) 2501021363 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Railing Arrangement |
13-Apr-2026 | 1 | - |
| 21 | 141-LLBM/4/2026 |
KTU - 2094 (FINAL) 2501020582 |
PONTOON |
FINAL LONGITUDINAL STRENGTH CALCULATION-REV 0 |
13-Apr-2026 | 1 | - |
| 22 | 127-LLBM/4/2026 |
H - 585 (FINAL) 2501021363 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Bollard Mooring Arrangement |
13-Apr-2026 | 1 | - |
| 23 | 150-LLBM/4/2026 |
MPS - 010 2401021447 |
PONTOON |
LONGITUDINAL STRENGTH MPS -010 - FINAL R0 |
13-Apr-2026 | 1 | - |
| 24 | 156-LLBM/4/2026 |
HULL - 112 (FINAL) 2501021403 |
CPO BARGE |
H-112 DECK HOUSE |
14-Apr-2026 | 1 | - |
| 25 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Multiple Items (19 Gambar) |
15-Apr-2026 | 19 | |
| 25.1 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | DIRTY OIL TANK AND LUBRICATING OIL TANK |
15-Apr-2026 | 1 | |
| 25.2 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SECTION FR 56 |
15-Apr-2026 | 1 | |
| 25.3 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | CONNECTING ROD TUNNEL |
15-Apr-2026 | 1 | |
| 25.4 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | HAWSE PIPE DETAIL 1 OF 2 |
15-Apr-2026 | 1 | |
| 25.5 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SUPERSTRUCTURE AND WHEEL HOUSE 2 OF 4 |
15-Apr-2026 | 1 | |
| 25.6 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | ENGINE ROOM FRAME AND AFTER SECTION |
15-Apr-2026 | 1 | |
| 25.7 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SKEG DETAIL |
15-Apr-2026 | 1 | |
| 25.8 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | DETAIL BRAKET TRANSVERSAL BULKHEAD |
15-Apr-2026 | 1 | |
| 25.9 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | HAWSE PIPE DETAIL 2 OF 2 |
15-Apr-2026 | 1 | |
| 25.10 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SUPERSTRUCTURE AND WHEEL HOUSE 3 OF 4 |
15-Apr-2026 | 1 | |
| 25.11 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | MAIN ENGINE GIRDER DETAIL |
15-Apr-2026 | 1 | |
| 25.12 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SUPERSTRUCTURE AND WHEEL HOUSE 4 OF 4 |
15-Apr-2026 | 1 | |
| 25.13 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | DETAIL WEB TRANSVERSAL BULKHEAD |
15-Apr-2026 | 1 | |
| 25.14 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | RUDDER AND RUDDER STOCK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 25.15 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | TRANSVERSAL BULKHEAD FR 21 AND 23 |
15-Apr-2026 | 1 | |
| 25.16 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | F O T LONG BULKHEAD |
15-Apr-2026 | 1 | |
| 25.17 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | STANCHION IN CARGO TANK |
15-Apr-2026 | 1 | |
| 25.18 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | FORWARD SECTION |
15-Apr-2026 | 1 | |
| 25.19 | 159-LLBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SUPERSTRUCTURE AND WHEELHOUSE 1 OF 4 |
15-Apr-2026 | 1 | |
| 26 | 165-LLBM/4/2026 |
H - 593 (FINAL) 2601020219 |
OIL/CHEMICAL BARGE |
SHELL EXPANSION |
15-Apr-2026 | 1 | - |
| 27 | 164-LLBM/4/2026 |
H - 592 (FINAL) 2601020061 |
OIL/CHEMICAL BARGE |
SHELL EXPANSION |
15-Apr-2026 | 1 | - |
| 28 | 161-LLBM/4/2026 |
H - 846 (FINAL) 2501020687 |
OIL BARGE |
H-846 Preliminary Long Strenght |
15-Apr-2026 | 1 | - |
| 29 | 167-LLBM/4/2026 |
H - 596 (FINAL) 2601020217 |
OIL/CHEMICAL BARGE |
SHELL EXPANSION |
15-Apr-2026 | 1 | - |
| 30 | 166-LLBM/4/2026 |
H - 595 (FINAL) 2601020218 |
OIL/CHEMICAL BARGE |
SHELL EXPANSION |
15-Apr-2026 | 1 | - |
| 31 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON |
Multiple Items (6 Gambar) |
16-Apr-2026 | 6 | |
| 31.1 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON | GIM- H 2007-H-04-BHD TRANSVERSAL SECTION-REV 0 |
16-Apr-2026 | 1 | |
| 31.2 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON | GIM- H 2007-H-03-DECK AND BOTTOM PLAN-REV 0 |
16-Apr-2026 | 1 | |
| 31.3 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON | GIM- H 2007-H-02-GENERAL ARRANGEMENT-REV 0 |
16-Apr-2026 | 1 | |
| 31.4 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON | GIM- H 2007-H-05-PROFILE PLAN PLAN-REV 0 |
16-Apr-2026 | 1 | |
| 31.5 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON | GIM- H 2007-H-07-WELDING SCHEDULE-REV 0 |
16-Apr-2026 | 1 | |
| 31.6 | 172-LLBM/4/2026 |
H - 2007 2401020481 |
PONTOON | GIM- H 2007-H-06-SHELL EXPANSION-REV 0 |
16-Apr-2026 | 1 | |
| 32 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | |
| 32.1 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON | H-033 DECK BOTTOM PLAN |
17-Apr-2026 | 1 | |
| 32.2 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON | H-033 X-RAY PLAN |
17-Apr-2026 | 1 | |
| 32.3 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON | H-033 BULKHEAD TRANSVERSAL SECTION |
17-Apr-2026 | 1 | |
| 32.4 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON | H-033 SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 32.5 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON | H-033 PROFILE PLAN |
17-Apr-2026 | 1 | |
| 32.6 | 183-LLBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON | H-033 GENERAL ARRANGEMENT cw RAMP DOOR |
17-Apr-2026 | 1 | |
| 33 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | |
| 33.1 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON | H-035 H-036 H-037 X-RAY PLAN |
17-Apr-2026 | 1 | |
| 33.2 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON | H-035 H-036 H-037 SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 33.3 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON | H-035 H-036 H-037 DECK BOTTOM PLAN |
17-Apr-2026 | 1 | |
| 33.4 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON | H-035 H-036 H-037 GENERAL ARRANGEMENT cw RAMP DOOR |
17-Apr-2026 | 1 | |
| 33.5 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON | H-035 H-036 H-037 BULKHEAD TRANSVERSAL SECTION |
17-Apr-2026 | 1 | |
| 33.6 | 184-LLBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON | H-035 H-036 H-037 PROFILE PLAN |
17-Apr-2026 | 1 | |
| 34 | 187-LLBM/4/2026 |
H - 840 (FINAL) 2501020907 |
ACCOMODATION BARGE |
FIRE PROTECTION PLAN |
17-Apr-2026 | 1 | - |
| 35 | 188-LLBM/4/2026 |
HULL - 033 (FINAL) 2501021229 |
CPO BARGE |
DOOR HATCH WINDOW SIDE SCUTTLE ARRANGEMENT |
17-Apr-2026 | 1 | - |
| 36 | 197-LLBM/4/2026 |
HULL - 390 (FINAL) 2601020086 |
OIL/CHEMICAL BARGE |
NDT PLAN |
20-Apr-2026 | 1 | - |
JUSAK SONANG FERRARI SIAHAAN
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 203-MM/4/2026 |
TTH131 (CAL 1209) 2501100031 |
TUG BOAT |
SCHEMATIC BILGE AND FIRE-MAIN SYSTEM |
14-Apr-2026 | 1 | - |
| 2 | 214-MM/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 2.1 | 214-MM/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | SHAFTING ARRANGEMENT AND STERN TUBE |
14-Apr-2026 | 1 | |
| 2.2 | 214-MM/4/2026 |
MRP 99 2501030059 |
ANCHOR HANDLING TUG | ENGINE ROOM LAYOUT |
14-Apr-2026 | 1 | |
| 3 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT |
Multiple Items (16 Gambar) |
15-Apr-2026 | 16 | |
| 3.1 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | BILGE KEEL ARRANGEMENT AND DETAILS |
15-Apr-2026 | 1 | |
| 3.2 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC OILY WATER SYSTEM |
15-Apr-2026 | 1 | |
| 3.3 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC DOMESTIC FW SUPPLY SYSTEM |
15-Apr-2026 | 1 | |
| 3.4 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 3.5 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 3.6 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 3.7 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC FUEL OIL TRANSFER SYSTEM |
15-Apr-2026 | 1 | |
| 3.8 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | VENTILATION ARRANGEMENT |
15-Apr-2026 | 1 | |
| 3.9 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SANITARY DISCHARGE SYSTEM |
15-Apr-2026 | 1 | |
| 3.10 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC TANK VENTS SOUNDING AND FILLING SYSTEM |
15-Apr-2026 | 1 | |
| 3.11 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC BILGE AND FIRE-MAIN SYSTEM |
15-Apr-2026 | 1 | |
| 3.12 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SEA CHEST DETAIL |
15-Apr-2026 | 1 | |
| 3.13 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC ENGINE EXHAUST SYSTEM |
15-Apr-2026 | 1 | |
| 3.14 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | STEERING GEAR LAYOUT DETAIL |
15-Apr-2026 | 1 | |
| 3.15 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
15-Apr-2026 | 1 | |
| 3.16 | 230-MM/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCHEMATIC LUB OIL SYSTEM |
15-Apr-2026 | 1 | |
| 4 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT |
Multiple Items (10 Gambar) |
15-Apr-2026 | 10 | |
| 4.1 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | FW AND SW SUPPLY SYSTEM |
15-Apr-2026 | 1 | |
| 4.2 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | PROPELLER DETAILS |
15-Apr-2026 | 1 | |
| 4.3 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | BILGE BALLAST AND FIRE SYSTEM |
15-Apr-2026 | 1 | |
| 4.4 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | STEERING GEAR LAYOUT |
15-Apr-2026 | 1 | |
| 4.5 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | FO SYSTEM |
15-Apr-2026 | 1 | |
| 4.6 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 4.7 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | SHAFTING ARRANGEMENT AND DETAILS |
15-Apr-2026 | 1 | |
| 4.8 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | OILY WATER SYSTEM |
15-Apr-2026 | 1 | |
| 4.9 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 4.10 | 226-MM/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | SOUNDING FILLING AND AIR PIPE |
15-Apr-2026 | 1 | |
| 5 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT |
Multiple Items (10 Gambar) |
15-Apr-2026 | 10 | |
| 5.1 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | LAY OUT ENGINE ROOM |
15-Apr-2026 | 1 | |
| 5.2 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SOUNDING FILLING AND AIR PIPE |
15-Apr-2026 | 1 | |
| 5.3 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | ENGINE COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 5.4 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SCREW PROPELLER PLAN |
15-Apr-2026 | 1 | |
| 5.5 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | FUEL OIL SYSTEM |
15-Apr-2026 | 1 | |
| 5.6 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SANITARY DISCHARGE SYSTEM |
15-Apr-2026 | 1 | |
| 5.7 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | BILGE GS AND FW PIPE |
15-Apr-2026 | 1 | |
| 5.8 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | STERN TUBE AND PROPELLER SHAFT |
15-Apr-2026 | 1 | |
| 5.9 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | EXHAUST GAS SYSTEM |
15-Apr-2026 | 1 | |
| 5.10 | 228-MM/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | FIRE FIGHTING SYSTEM |
15-Apr-2026 | 1 | |
| 6 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT |
Multiple Items (13 Gambar) |
15-Apr-2026 | 13 | |
| 6.1 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 6.2 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 6.3 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | EXHAUST GAS SYSTEM |
15-Apr-2026 | 1 | |
| 6.4 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | BILGE-BALLAST AND GS FIRE SYSTEM |
15-Apr-2026 | 1 | |
| 6.5 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 6.6 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | ENGINE ROOM LAYOUT |
15-Apr-2026 | 1 | |
| 6.7 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | PROPELLER DETAIL |
15-Apr-2026 | 1 | |
| 6.8 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | AIR PIPE-SOUNDING AND FILLING SYSTEM |
15-Apr-2026 | 1 | |
| 6.9 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | SEA CHEST DETAIL |
15-Apr-2026 | 1 | |
| 6.10 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | DIRTY OIL SYSTEM |
15-Apr-2026 | 1 | |
| 6.11 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | STEERING GEAR SYSTEM |
15-Apr-2026 | 1 | |
| 6.12 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | FUEL OIL SYSTEM |
15-Apr-2026 | 1 | |
| 6.13 | 229-MM/4/2026 |
PSB - PPSJ - 04 (FINAL) 2501030371 |
TUG BOAT | FW AND SW SANITARY SYSTEM |
15-Apr-2026 | 1 | |
| 7 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT |
Multiple Items (12 Gambar) |
15-Apr-2026 | 12 | |
| 7.1 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCH BILGE AND FIRE MAIN SYSTEM |
15-Apr-2026 | 1 | |
| 7.2 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 7.3 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCH FUEL OIL TRANSFER SYSTEM |
15-Apr-2026 | 1 | |
| 7.4 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | VENTILATION ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.5 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.6 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.7 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SEA CHEST DETAIL |
15-Apr-2026 | 1 | |
| 7.8 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCHEMATIC COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 7.9 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCHEMATIC OILY WATER SYSTEM |
15-Apr-2026 | 1 | |
| 7.10 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCH TANK VENT SOUNDING AND FILLING SYSTEM |
15-Apr-2026 | 1 | |
| 7.11 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | SCH DOMESTIC FW AND SW SUPPLY AND DISCH SYSTEM |
15-Apr-2026 | 1 | |
| 7.12 | 221-MM/4/2026 |
BERLIAN PACIFIC 7 2601150013 |
TUG BOAT | STEERING GEAR LAYOUT |
15-Apr-2026 | 1 | |
| 8 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT |
Multiple Items (8 Gambar) |
17-Apr-2026 | 8 | |
| 8.1 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | SOUNDING FILLING AND AIR PIPE |
17-Apr-2026 | 1 | |
| 8.2 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | STERN TUBE AND PROPELLER SHAFT |
17-Apr-2026 | 1 | |
| 8.3 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | SCREW PROPELLER PLAN |
17-Apr-2026 | 1 | |
| 8.4 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | ENGINE COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 8.5 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | FUEL OIL SYSTEM |
17-Apr-2026 | 1 | |
| 8.6 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | FIRE FIGHTING SYSTEM |
17-Apr-2026 | 1 | |
| 8.7 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | BILGE GS AND FW PIPE |
17-Apr-2026 | 1 | |
| 8.8 | 298-MM/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | LAY OUT ENGINE ROOM |
17-Apr-2026 | 1 | |
| 9 | 292-MM/4/2026 |
MP 2809 (FINAL) 2601030071 |
TUG BOAT |
LAYOUT ENGINE ROOM |
17-Apr-2026 | 1 | - |
KRISHNA WIJAYADI, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 102-ML/4/2026 |
BATAMFAST 6 1802020335 |
PASSENGER SHIP |
ELECTRICAL WIRING DIAGRAM |
14-Apr-2026 | 1 | - |
| 2 | 114-ML/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 2.1 | 114-ML/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER | ELECTRIC POWER CONSUMPTION TABLE |
15-Apr-2026 | 1 | |
| 2.2 | 114-ML/4/2026 |
FERIMAS BAHAGIA 2604040041 |
OIL TANKER | SINGLE LINE WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 3 | 117-ML/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER |
Multiple Items (4 Gambar) |
15-Apr-2026 | 4 | |
| 3.1 | 117-ML/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | MAIN SWITCHBOARD |
15-Apr-2026 | 1 | |
| 3.2 | 117-ML/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | POWER BALANCE CALCULATION |
15-Apr-2026 | 1 | |
| 3.3 | 117-ML/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | WIRING DIAGRAM |
15-Apr-2026 | 1 | |
| 3.4 | 117-ML/4/2026 |
ZULFA - ADMISSION TO CLASS NATIONAL LL PM39 (EXISTING SHIP NOT TOCA) 2602090094 |
OIL TANKER | EMERGENCY SWITCHBOARD |
15-Apr-2026 | 1 | |
| 4 | 119-ML/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 4.1 | 119-ML/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | DIAGRAM OF POWER SYSTEM |
15-Apr-2026 | 1 | |
| 4.2 | 119-ML/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | MAIN SWITCHBOARD SINGLE-LINE DIAGRAM |
15-Apr-2026 | 1 | |
| 4.3 | 119-ML/4/2026 |
BMU 001 EKS XING HAN 68 2602070013 |
SELF PROPELLED CRANE BARGE | POWER LOAD CALCULATION BOOK |
15-Apr-2026 | 1 | |
| 5 | 133-ML/4/2026 |
SYAHRAH SAVITRI 2602030045 |
OIL TANKER |
MAIN SWITCHBOARD |
16-Apr-2026 | 1 | - |
| 6 | 134-ML/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 6.1 | 134-ML/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | ELECTRICAL WIRING DIAGRAM |
16-Apr-2026 | 1 | |
| 6.2 | 134-ML/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | ELECTRICAL POWER BALANCE |
16-Apr-2026 | 1 | |
| 6.3 | 134-ML/4/2026 |
LBN 17 2602120003 |
GENERAL CARGO | MAIN SWITCHBOARD DIAGRAM |
16-Apr-2026 | 1 | |
| 7 | 131-ML/4/2026 |
BATAMFAST 6 1802020335 |
PASSENGER SHIP |
LIGHTING AND SOCKET ARRANGEMENT |
16-Apr-2026 | 1 | - |
| 8 | 127-ML/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO |
Multiple Items (3 Gambar) |
16-Apr-2026 | 3 | |
| 8.1 | 127-ML/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | POWER BALANCE CALCULATION |
16-Apr-2026 | 1 | |
| 8.2 | 127-ML/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | WIRING DIAGRAM |
16-Apr-2026 | 1 | |
| 8.3 | 127-ML/4/2026 |
DAISHIN (PKBL NON TOCA) 2502120101 |
GENERAL CARGO | MAIN SWITCHBOARD |
16-Apr-2026 | 1 | |
| 9 | 142-ML/4/2026 |
GD 1101 2604120051 |
WORK BARGE |
Multiple Items (3 Gambar) |
17-Apr-2026 | 3 | |
| 9.1 | 142-ML/4/2026 |
GD 1101 2604120051 |
WORK BARGE | WIRING DIAGRAM |
17-Apr-2026 | 1 | |
| 9.2 | 142-ML/4/2026 |
GD 1101 2604120051 |
WORK BARGE | MSB DIAGRAM |
17-Apr-2026 | 1 | |
| 9.3 | 142-ML/4/2026 |
GD 1101 2604120051 |
WORK BARGE | POWER BALANCE CALCULATION |
17-Apr-2026 | 1 |
LIDYA SALIM, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 199-SC/3/2026 |
MGDI - 002 (FINAL) 2501020370 |
PASSENGER SHIP |
FINAL STABILITY REPORT |
25-Mar-2026 | 1 | - |
| 2 | 21-SC/4/2026 |
MY STAR 2604170006 |
LANDING CRAFT |
FINAL INTACT STABILITY BOOKLET |
02-Apr-2026 | 1 | - |
| 3 | 125-SC/4/2026 |
MP 55 2602040034 |
CREW BOAT |
INTACT STABILITY |
13-Apr-2026 | 1 | - |
| 4 | 117-SC/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 4.1 | 117-SC/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE | STABILITY BOOKLET |
13-Apr-2026 | 1 | |
| 4.2 | 117-SC/4/2026 |
BATRAMA 09 2502030532 |
SELF PROP.OIL BARGE | CAPACITY PLAN |
13-Apr-2026 | 1 | |
| 5 | 116-SC/4/2026 |
MBM 02 2602040035 |
CREW BOAT |
INTACT STABILITY |
13-Apr-2026 | 1 | - |
| 6 | 121-SC/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
INTACT STABILITY BOOKLET |
13-Apr-2026 | 1 | - |
| 7 | 105-SC/4/2026 |
PANARUNG 2502030563 |
CREW BOAT |
CAPACITY PLAN |
13-Apr-2026 | 1 | - |
| 8 | 148-SC/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP |
Multiple Items (2 Gambar) |
14-Apr-2026 | 2 | |
| 8.1 | 148-SC/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | FINAL INTACT STABILITY |
14-Apr-2026 | 1 | |
| 8.2 | 148-SC/4/2026 |
BENUA 333 (PKBL) 2602010095 |
DRY CARGO SHIP | FINAL DAMAGE STABILITY |
14-Apr-2026 | 1 | |
| 9 | 152-SC/4/2026 |
AMBON STRAIT 2602150015 |
GENERAL CARGO |
DAMAGE STABILITY |
15-Apr-2026 | 1 | - |
| 10 | 192-SC/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 10.1 | 192-SC/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | STABILITY BOOKLET |
17-Apr-2026 | 1 | |
| 10.2 | 192-SC/4/2026 |
STK MERLION - 111 2603020102 |
OIL BARGE | CAPACITY PLAN |
17-Apr-2026 | 1 | |
| 11 | 193-SC/4/2026 |
KARYA CEMERLANG 89 2501030276 |
LANDING CRAFT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 11.1 | 193-SC/4/2026 |
KARYA CEMERLANG 89 2501030276 |
LANDING CRAFT | TANK CAPACITY PLAN |
17-Apr-2026 | 1 | |
| 11.2 | 193-SC/4/2026 |
KARYA CEMERLANG 89 2501030276 |
LANDING CRAFT | INTACT STABILITY BOOKLET |
17-Apr-2026 | 1 |
M. FAHMI AULIARAHMAN
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 45-MMBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT |
Multiple Items (2 Gambar) |
09-Apr-2026 | 2 | |
| 1.1 | 45-MMBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | SCHEMATIC OF FILLING AIR PIPE AND SOUNDING PIPE |
09-Apr-2026 | 1 | |
| 1.2 | 45-MMBM/4/2026 |
HULL - 161 (FINAL) 2501021566 |
TUG BOAT | SCHEMATIC SEWAGE SYSTEM |
09-Apr-2026 | 1 | |
| 2 | 46-MMBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT |
Multiple Items (2 Gambar) |
09-Apr-2026 | 2 | |
| 2.1 | 46-MMBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT | SCHEMATIC OF FILLING AIR PIPE AND SOUNDING PIPE |
09-Apr-2026 | 1 | |
| 2.2 | 46-MMBM/4/2026 |
HULL - 159 (FINAL) 2501021567 |
TUG BOAT | SCHEMATIC SEWAGE SYSTEM |
09-Apr-2026 | 1 | |
| 3 | 144-MM/4/2026 |
SYAFIRA FIVE 2402120004 |
TUG BOAT |
ENGINE ROOM ARRANGEMENT |
09-Apr-2026 | 1 | - |
| 4 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG |
Multiple Items (9 Gambar) |
10-Apr-2026 | 9 | |
| 4.1 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | FO SYSTEM |
10-Apr-2026 | 1 | |
| 4.2 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SHAFTING DETAIL |
10-Apr-2026 | 1 | |
| 4.3 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SOUNDING FILLING AND AIR PIPE |
10-Apr-2026 | 1 | |
| 4.4 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SWCOOLING SYSTEM |
10-Apr-2026 | 1 | |
| 4.5 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | BILGE SYSTEM |
10-Apr-2026 | 1 | |
| 4.6 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | SHAFTING ARRANGEMENT |
10-Apr-2026 | 1 | |
| 4.7 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | ENGINE ROOM LAY OUT |
10-Apr-2026 | 1 | |
| 4.8 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | STEERING GEAR SYSTEM |
10-Apr-2026 | 1 | |
| 4.9 | 156-MM/4/2026 |
FORTUNA 17 (NOT TOCA) 2602030080 |
ANCHOR HANDLING TUG | PROPELLER PLAN |
10-Apr-2026 | 1 | |
| 5 | 160-MM/4/2026 |
SYAFIRA FIVE 2402120004 |
TUG BOAT |
STEERING GEAR SYSTEM |
10-Apr-2026 | 1 | - |
| 6 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT |
Multiple Items (9 Gambar) |
10-Apr-2026 | 9 | |
| 6.1 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | AIR FILLING AND SOUNDING PIPE |
10-Apr-2026 | 1 | |
| 6.2 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | STEERING GEAR SYSTEM |
10-Apr-2026 | 1 | |
| 6.3 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | FUEL OIL SYSTEM |
10-Apr-2026 | 1 | |
| 6.4 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | PROPELLER |
10-Apr-2026 | 1 | |
| 6.5 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | COOLING SYSTEM |
10-Apr-2026 | 1 | |
| 6.6 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | BILGE FIRE AND GS SYSTEM |
10-Apr-2026 | 1 | |
| 6.7 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | SHAFTING ARRANGEMENT AND DETAIL |
10-Apr-2026 | 1 | |
| 6.8 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | EXHAUST GAS SYSTEM |
10-Apr-2026 | 1 | |
| 6.9 | 152-MM/4/2026 |
BINA VISTA I 2602140028 |
TUG BOAT | ENGINE ROOM LAYOUT |
10-Apr-2026 | 1 | |
| 7 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT |
Multiple Items (8 Gambar) |
13-Apr-2026 | 8 | |
| 7.1 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | SHAFTING ARRANGEMENT |
13-Apr-2026 | 1 | |
| 7.2 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | SCH. ENGINE COOLING SYSTEM |
13-Apr-2026 | 1 | |
| 7.3 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | SHAFTING DETAIL |
13-Apr-2026 | 1 | |
| 7.4 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | SCH. FIRE & MAIN DECK WASH SYSTEM |
13-Apr-2026 | 1 | |
| 7.5 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
13-Apr-2026 | 1 | |
| 7.6 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | PROPELLER DESAIN |
13-Apr-2026 | 1 | |
| 7.7 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | SCH. FUEL & OIL SYSTEM |
13-Apr-2026 | 1 | |
| 7.8 | 166-MM/4/2026 |
RODA MAS KALBAR 2502140086 |
TUG BOAT | SCH. FRESH WATER & SANITARY SYSTEM |
13-Apr-2026 | 1 | |
| 8 | 205-MM/4/2026 |
MANGGALA 2 2501140010 |
TUG BOAT |
FW AND SANITARY SYSTEM |
14-Apr-2026 | 1 | - |
| 9 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT |
Multiple Items (13 Gambar) |
15-Apr-2026 | 13 | |
| 9.1 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH FO TRANSFER SYSTEM |
15-Apr-2026 | 1 | |
| 9.2 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | VENTILATION ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9.3 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | ENGINE ROOM ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9.4 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SEA CHEST DETAIL |
15-Apr-2026 | 1 | |
| 9.5 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH TANK VENT SOUNDING AND FILLING SYSTEM |
15-Apr-2026 | 1 | |
| 9.6 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH COOLING SYSTEM |
15-Apr-2026 | 1 | |
| 9.7 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SHAFTING DETAIL |
15-Apr-2026 | 1 | |
| 9.8 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH LUBE OIL SYSTEM |
15-Apr-2026 | 1 | |
| 9.9 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH OILY WATER SYSTEM |
15-Apr-2026 | 1 | |
| 9.10 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH BILGE AND FIRE MAIN SYSTEM |
15-Apr-2026 | 1 | |
| 9.11 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SHAFTING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 9.12 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCH DOMESTIC FW AND SW SUPPLY AND DISCHARGE SYSTEM |
15-Apr-2026 | 1 | |
| 9.13 | 233-MM/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | STEERING GEAR LAYOUT DETAIL |
15-Apr-2026 | 1 | |
| 10 | 222-MM/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 10.1 | 222-MM/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | FO SYSTEM |
15-Apr-2026 | 1 | |
| 10.2 | 222-MM/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | BILGE BALLAS GS AND FIRE SYSTEM |
15-Apr-2026 | 1 | |
| 11 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE |
Multiple Items (10 Gambar) |
16-Apr-2026 | 10 | |
| 11.1 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | EXHAUST GAS PIPING SYSTEM |
16-Apr-2026 | 1 | |
| 11.2 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | BILGE BALLAST FIRE MAIN SYSTEM |
16-Apr-2026 | 1 | |
| 11.3 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | PUMP ROOM VENTILATION SYSTEM |
16-Apr-2026 | 1 | |
| 11.4 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | AIR SOUNDING PIPE ARRANGEMENT |
16-Apr-2026 | 1 | |
| 11.5 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | PUMP ROOM LAYOUT |
16-Apr-2026 | 1 | |
| 11.6 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | ENGINE COOLING SYSTEM |
16-Apr-2026 | 1 | |
| 11.7 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | DOMESTIC FRESH WATER SANITARY SYTEM |
16-Apr-2026 | 1 | |
| 11.8 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | FUEL OIL SCHEMATIC DIAGRAM |
16-Apr-2026 | 1 | |
| 11.9 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | WASHING PIPE |
16-Apr-2026 | 1 | |
| 11.10 | 255-MM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE | MAIN CARGO |
16-Apr-2026 | 1 | |
| 12 | 257-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Multiple Items (4 Gambar) |
16-Apr-2026 | 4 | |
| 12.1 | 257-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SHAFFTING ARRANGEMENT |
16-Apr-2026 | 1 | |
| 12.2 | 257-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | ENGINE ROOM ARRANGEMENT |
16-Apr-2026 | 1 | |
| 12.3 | 257-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | PROPELLER SHAFT AND STERNTUBE |
16-Apr-2026 | 1 | |
| 12.4 | 257-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | EXHAUST GAS SYSTEM |
16-Apr-2026 | 1 | |
| 13 | 263-MM/4/2026 |
MPS - 015 (FINAL) 2501020766 |
TUG BOAT |
Steering Gear System |
16-Apr-2026 | 1 | - |
| 14 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT |
Multiple Items (10 Gambar) |
16-Apr-2026 | 10 | |
| 14.1 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | SEA CHEST DETAILS |
16-Apr-2026 | 1 | |
| 14.2 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | STEERING GEAR SYSTEM |
16-Apr-2026 | 1 | |
| 14.3 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | OILY WATER SEPARATOR SYSTEM |
16-Apr-2026 | 1 | |
| 14.4 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | FILLING AIR VENT AND SOUNDING PIPE DETAILS |
16-Apr-2026 | 1 | |
| 14.5 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | FRESH WATER AND SEA WATER DOMESTIC SANITARY SYSTEM |
16-Apr-2026 | 1 | |
| 14.6 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | FUEL OIL SYSTEM |
16-Apr-2026 | 1 | |
| 14.7 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | POSITION OF TANK VENT SOUNDING AND FILLING PIPE |
16-Apr-2026 | 1 | |
| 14.8 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | BILGE BALLAST AND FIREMAIN SYSTEM |
16-Apr-2026 | 1 | |
| 14.9 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | EXHAUST PIPING SYSTEM |
16-Apr-2026 | 1 | |
| 14.10 | 266-MM/4/2026 |
HULL - 186 (FINAL) 2501020709 |
TUG BOAT | ENGINE COOLING SYSTEM |
16-Apr-2026 | 1 | |
| 15 | 265-MM/4/2026 |
MPS - 021 (FINAL) 2501020871 |
TUG BOAT |
Steering Gear System |
16-Apr-2026 | 1 | - |
| 16 | 54-MMBM/4/2026 |
H - 1010 (FINAL) 2601020001 |
TUG BOAT |
GIM-1010-M-01 ENGINE ROOM LAY OUT |
16-Apr-2026 | 1 | - |
| 17 | 264-MM/4/2026 |
MPS - 017 (FINAL) 2501020768 |
TUG BOAT |
Steering Gear System |
16-Apr-2026 | 1 | - |
| 18 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT |
Multiple Items (10 Gambar) |
17-Apr-2026 | 10 | |
| 18.1 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | FUEL SYSTEM |
17-Apr-2026 | 1 | |
| 18.2 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | ENGINE ROOM LAYOUT |
17-Apr-2026 | 1 | |
| 18.3 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | STEERING SYSTEM |
17-Apr-2026 | 1 | |
| 18.4 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | PROPELLER |
17-Apr-2026 | 1 | |
| 18.5 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | AIRFILLING AND SOUNDING PIPE |
17-Apr-2026 | 1 | |
| 18.6 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | SWCOOLING SYSTEM |
17-Apr-2026 | 1 | |
| 18.7 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | BILGAGSFW AND FIRE SYSTEM |
17-Apr-2026 | 1 | |
| 18.8 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | SHAFTING AND STERN TUBE DETAIL |
17-Apr-2026 | 1 | |
| 18.9 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | EXHAUST GAS SYSTEM |
17-Apr-2026 | 1 | |
| 18.10 | 301-MM/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | SHAFTING ARRANGEMENT |
17-Apr-2026 | 1 | |
| 19 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT |
Multiple Items (10 Gambar) |
17-Apr-2026 | 10 | |
| 19.1 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | BILGE BALLAST AND FIREMAIN SYSTEM |
17-Apr-2026 | 1 | |
| 19.2 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | ENGINE COOLING SYSTEM |
17-Apr-2026 | 1 | |
| 19.3 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | SEA CHEST DETAILS |
17-Apr-2026 | 1 | |
| 19.4 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | STEERING GEAR SYSTEM |
17-Apr-2026 | 1 | |
| 19.5 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | FUEL OIL SYSTEM |
17-Apr-2026 | 1 | |
| 19.6 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | FILLING AIR VENT AND SOUNDING PIPE DETAILS |
17-Apr-2026 | 1 | |
| 19.7 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | POSITION OF TANK VENT SOUNDING AND FILLING PIPE |
17-Apr-2026 | 1 | |
| 19.8 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | FRESH WATER AND SEA WATER DOMESTIC SANITARY SYSTEM |
17-Apr-2026 | 1 | |
| 19.9 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | OILY WATER SEPARATOR SYSTEM |
17-Apr-2026 | 1 | |
| 19.10 | 279-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | EXHAUST PIPING SYSTEM |
17-Apr-2026 | 1 | |
| 20 | 282-MM/4/2026 |
26-6 (FINAL) 2601120028 |
TUG BOAT |
EXHAUST GAS PIPING SYSTEM |
17-Apr-2026 | 1 | - |
| 21 | 280-MM/4/2026 |
26-4 (FINAL) 2601120026 |
TUG BOAT |
EXHAUST GAS PIPING SYSTEM |
17-Apr-2026 | 1 | - |
| 22 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE |
Multiple Items (10 Gambar) |
17-Apr-2026 | 10 | |
| 22.1 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC SANITARY DISCHARGE SYSTEM |
17-Apr-2026 | 1 | |
| 22.2 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC CARGO SYSTEM |
17-Apr-2026 | 1 | |
| 22.3 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | AIR PIPE FILLING SOUNDING ARRANGEMENT |
17-Apr-2026 | 1 | |
| 22.4 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SHAFTING ARRANGEMENT |
17-Apr-2026 | 1 | |
| 22.5 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC ENGINE COOLING STYSTEM |
17-Apr-2026 | 1 | |
| 22.6 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC SLOP SYSTEM |
17-Apr-2026 | 1 | |
| 22.7 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC O D M E SYSTEM |
17-Apr-2026 | 1 | |
| 22.8 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC OIL WATER SEPARATOR SYSTEM |
17-Apr-2026 | 1 | |
| 22.9 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCH BILGA BALLAST AND FIREMAIN SYSTEM |
17-Apr-2026 | 1 | |
| 22.10 | 288-MM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE | SCHEMATIC FRESH WATER SANITARY SYSTEM |
17-Apr-2026 | 1 | |
| 23 | 303-MM/4/2026 |
26-5 (FINAL) 2601120027 |
TUG BOAT |
EXHAUST GAS PIPING SYSTEM |
17-Apr-2026 | 1 | - |
| 24 | 296-MM/4/2026 |
MUTIARA INDAH XI 2603020317 |
BARGE |
PUMP ROOM AND GENERATOR ROOM LAYOUT |
17-Apr-2026 | 1 | - |
| 25 | 313-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT |
Multiple Items (3 Gambar) |
20-Apr-2026 | 3 | |
| 25.1 | 313-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | DETAILS OF PROPELLER |
20-Apr-2026 | 1 | |
| 25.2 | 313-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | ENGINE ROOM LAYOUT |
20-Apr-2026 | 1 | |
| 25.3 | 313-MM/4/2026 |
HULL - 191 (FINAL) 2501020901 |
TUG BOAT | SHAFT ARRANGEMENT |
20-Apr-2026 | 1 |
MUHAMMAD IQRA RAMADHAN
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT |
Multiple Items (17 Gambar) |
09-Apr-2026 | 17 | |
| 1.1 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | BULKHEAD SECTION |
09-Apr-2026 | 1 | |
| 1.2 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | DOORS AND WINDOWS ARRANGEMENT |
09-Apr-2026 | 1 | |
| 1.3 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | TOWING HOOK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.4 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | SUPERSTRUCTURE |
09-Apr-2026 | 1 | |
| 1.5 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | FIRE INSULATION PLAN |
09-Apr-2026 | 1 | |
| 1.6 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | WHEEL HOUSE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.7 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 1.8 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | RUDDER AND RUDDER STOCK |
09-Apr-2026 | 1 | |
| 1.9 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.10 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | SKEG CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.11 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | PROFILE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.12 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | NDT PLAN |
09-Apr-2026 | 1 | |
| 1.13 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | SHELL EXPANSION |
09-Apr-2026 | 1 | |
| 1.14 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | FORE PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 1.15 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | GENERAL ARRANGEMENT |
09-Apr-2026 | 1 | |
| 1.16 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | ENGINE FOUNDATION |
09-Apr-2026 | 1 | |
| 1.17 | 100-LL/4/2026 |
HULL 010 (FINAL) 2501030383 |
TUG BOAT | WELDING SCHEDULE |
09-Apr-2026 | 1 | |
| 2 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT |
Multiple Items (6 Gambar) |
09-Apr-2026 | 6 | |
| 2.1 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 2.2 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | SHELL EXPANSION |
09-Apr-2026 | 1 | |
| 2.3 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | PROFILE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 2.4 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | GENERAL ARRANGEMENT |
09-Apr-2026 | 1 | |
| 2.5 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | FP CONSTRUCTION |
09-Apr-2026 | 1 | |
| 2.6 | 105-LL/4/2026 |
LTB 1 (FINAL) 2501120138 |
TUG BOAT | AP CONSTRUCTION |
09-Apr-2026 | 1 | |
| 3 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT |
Multiple Items (20 Gambar) |
10-Apr-2026 | 20 | |
| 3.1 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | ANCHOR AND HAWSE PIPE DETAIL |
10-Apr-2026 | 1 | |
| 3.2 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | MOORING ARRANGEMENT |
10-Apr-2026 | 1 | |
| 3.3 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | ENGINE GIRDER |
10-Apr-2026 | 1 | |
| 3.4 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SKEG CONSTRUCTION |
10-Apr-2026 | 1 | |
| 3.5 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | EQUIPMENT NUMBER CALCULATION |
10-Apr-2026 | 1 | |
| 3.6 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | WATER TIGHT HATCH LAYOUT AND DETAIL |
10-Apr-2026 | 1 | |
| 3.7 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | STRUCTURAL PROFILE AND DECK |
10-Apr-2026 | 1 | |
| 3.8 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | FUNNEL CONSTRUCTION |
10-Apr-2026 | 1 | |
| 3.9 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | WELDING SCHEDULE |
10-Apr-2026 | 1 | |
| 3.10 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | BHD AND FRAME SECTION |
10-Apr-2026 | 1 | |
| 3.11 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | MAST LIGHT DETAIL |
10-Apr-2026 | 1 | |
| 3.12 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | WHEELHOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 3.13 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | DECK HOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 3.14 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SHELL EXPANSION PLAN |
10-Apr-2026 | 1 | |
| 3.15 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | SCANTLING SECTION |
10-Apr-2026 | 1 | |
| 3.16 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | |
| 3.17 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | ENGINE ROOM PORTABLE PANEL |
10-Apr-2026 | 1 | |
| 3.18 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | TOWING HOOK PLATFORM DETAIL |
10-Apr-2026 | 1 | |
| 3.19 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | ANCHOR WINDLASS SEATING PLAN |
10-Apr-2026 | 1 | |
| 3.20 | 117-LL/4/2026 |
MITRA BAHARI 79 2601150012 |
TUG BOAT | RUDDER CONSTRUCTION |
10-Apr-2026 | 1 | |
| 4 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT |
Multiple Items (7 Gambar) |
15-Apr-2026 | 7 | |
| 4.1 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | BULKHEAD PLAN |
15-Apr-2026 | 1 | |
| 4.2 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 4.3 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 4.4 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | DECK AND CONTRUCTION HAL 2 |
15-Apr-2026 | 1 | |
| 4.5 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | DECK AND CONTRUCTION HAL 1 |
15-Apr-2026 | 1 | |
| 4.6 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | FORE PEAK CONSTRUCTION |
15-Apr-2026 | 1 | |
| 4.7 | 321-LL/2/2026 |
TUNAS PERKASA III 2302140056 |
TUG BOAT | MAIN ENGINE GIRDER |
15-Apr-2026 | 1 | |
| 5 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 5.1 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT | SUPERSTRUCTURE AND DECKHOUSE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 5.2 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT | PROFILE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 5.3 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT | BULKHEAD CONSTRUCTION |
15-Apr-2026 | 1 | |
| 5.4 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT | DECK AND BOTTOM CONSTRUCTION |
15-Apr-2026 | 1 | |
| 5.5 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT | MIDSHIP SECTION |
15-Apr-2026 | 1 | |
| 5.6 | 203-LL/4/2026 |
JOHAN JAYA 182 (FINAL) 2501120113 |
TUG BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 6 | 226-LL/4/2026 |
GALAXY 168 2401030338 |
LANDING CRAFT |
LONGITUDINAL STRENGTH CALCULATION |
16-Apr-2026 | 1 | - |
| 7 | 192-LLBM/4/2026 |
HULL - 339 2501020022 |
PONTOON |
LONG STRENGTH CALCULATION |
17-Apr-2026 | 1 | - |
MUHAMMAD RIKY ADHITAMA NUGRAHA
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 111-SC/4/2026 |
HULL 003 (FINAL) 2501120028 |
TUG BOAT |
INCLINING PROCEDURE |
13-Apr-2026 | 1 | - |
| 2 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT |
Multiple Items (6 Gambar) |
15-Apr-2026 | 6 | |
| 2.1 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | OFFSET TABLE |
15-Apr-2026 | 1 | |
| 2.2 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | DRAFT MARK ARRANGEMENT |
15-Apr-2026 | 1 | |
| 2.3 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | LINES PLAN |
15-Apr-2026 | 1 | |
| 2.4 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | TANK CAPACITY PLAN |
15-Apr-2026 | 1 | |
| 2.5 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | HYDROSTATIC DATA |
15-Apr-2026 | 1 | |
| 2.6 | 158-SC/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | PRELIMINARY INTACT STABILITY BOOKLET |
15-Apr-2026 | 1 | |
| 3 | 153-SC/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 3.1 | 153-SC/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT | INTACT STABILITY REPORT |
15-Apr-2026 | 1 | |
| 3.2 | 153-SC/4/2026 |
CEMERLANG SAMUDRA 2502140067 |
TUG BOAT | TANK CAPACITY PLAN |
15-Apr-2026 | 1 | |
| 4 | 162-SC/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT |
PRELIMINARY STABILITY BOOKLET |
15-Apr-2026 | 1 | - |
| 5 | 163-SC/4/2026 |
PSS.024 (FINAL) 2601030003 |
TUG BOAT |
PRELIMINARY INTACT STABILITY |
15-Apr-2026 | 1 | - |
| 6 | 165-SC/4/2026 |
FLY POWER 2702 (TOC) 2612020288 |
PONTOON |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 7 | 169-SC/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 8 | 168-SC/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 9 | 187-SC/4/2026 |
XIANG 2512030570 |
TUG BOAT |
FINAL TRIM AND STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 10 | 189-SC/4/2026 |
JI 2512030572 |
TUG BOAT |
FINAL TRIM AND STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
NUR HASAN SIDIQ, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 225-LL/2/2026 |
SAHABAT KAPUAS 2302070087 |
MOORED OIL STORAGE BARGE |
Multiple Items (2 Gambar) |
18-Feb-2026 | 2 | |
| 1.1 | 225-LL/2/2026 |
SAHABAT KAPUAS 2302070087 |
MOORED OIL STORAGE BARGE | MOORING STRENGTH ANALYSIS |
18-Feb-2026 | 1 | |
| 1.2 | 225-LL/2/2026 |
SAHABAT KAPUAS 2302070087 |
MOORED OIL STORAGE BARGE | MOORING ARRANGEMENT |
18-Feb-2026 | 1 | |
| 2 | 85-LL/3/2026 |
ROYAL 17 (APP DRAW MODIFIKASI) 2504010548 |
OIL BARGE |
Multiple Items (3 Gambar) |
05-Mar-2026 | 3 | |
| 2.1 | 85-LL/3/2026 |
ROYAL 17 (APP DRAW MODIFIKASI) 2504010548 |
OIL BARGE | CONSTRUCTION PLAN 3 |
05-Mar-2026 | 1 | |
| 2.2 | 85-LL/3/2026 |
ROYAL 17 (APP DRAW MODIFIKASI) 2504010548 |
OIL BARGE | CONSTRUCTION PLAN 1 |
05-Mar-2026 | 1 | |
| 2.3 | 85-LL/3/2026 |
ROYAL 17 (APP DRAW MODIFIKASI) 2504010548 |
OIL BARGE | GENERAL ARRANGEMENT |
05-Mar-2026 | 1 | |
| 3 | 12-LL/4/2026 |
MY STAR 2604170006 |
LANDING CRAFT |
Multiple Items (3 Gambar) |
01-Apr-2026 | 3 | |
| 3.1 | 12-LL/4/2026 |
MY STAR 2604170006 |
LANDING CRAFT | GENERAL ARRANGEMENT |
01-Apr-2026 | 1 | |
| 3.2 | 12-LL/4/2026 |
MY STAR 2604170006 |
LANDING CRAFT | STOWAGE AND LASHING ARRANGEMENT |
01-Apr-2026 | 1 | |
| 3.3 | 12-LL/4/2026 |
MY STAR 2604170006 |
LANDING CRAFT | DECK REINFORCEMENT |
01-Apr-2026 | 1 | |
| 4 | 5-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER |
SUPERSTRUCTURE CONSTRUCTION |
01-Apr-2026 | 1 | - |
| 5 | 31-LL/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT |
FINAL LONGITUDINAL STRENGTH BOOKLET |
02-Apr-2026 | 1 | - |
| 6 | 21-LL/4/2026 |
SYAFIRA FIVE 2402120004 |
TUG BOAT |
RUDDER CONSTRUCTION |
02-Apr-2026 | 1 | - |
| 7 | 44-LL/4/2026 |
CIPTA JAYA HARAPAN 99 2505040191 |
LANDING CRAFT |
RUDDER CONSTRUCTION |
06-Apr-2026 | 1 | - |
| 8 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT |
Multiple Items (8 Gambar) |
07-Apr-2026 | 8 | |
| 8.1 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | BULKHEAD AND SECTION 3 OF 3 |
07-Apr-2026 | 1 | |
| 8.2 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | BULKHEAD AND SECTION 1 OF 3 |
07-Apr-2026 | 1 | |
| 8.3 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | BULKHEAD AND SECTION 2 OF 3 |
07-Apr-2026 | 1 | |
| 8.4 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | SHELL EXPANSION |
07-Apr-2026 | 1 | |
| 8.5 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | GENERAL ARRANGEMENT |
07-Apr-2026 | 1 | |
| 8.6 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | PROFILE AND SIDE SHELL |
07-Apr-2026 | 1 | |
| 8.7 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | DECKHOUSE CONSTRUCTION |
07-Apr-2026 | 1 | |
| 8.8 | 62-LL/4/2026 |
DRAWING APPROVAL MITRA KENCANA 2604100030 |
TUG BOAT | DECK AND BOTTOM PLAN |
07-Apr-2026 | 1 | |
| 9 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT |
Multiple Items (16 Gambar) |
09-Apr-2026 | 16 | |
| 9.1 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | GENERAL ARRANGEMENT |
09-Apr-2026 | 1 | |
| 9.2 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | WHELL HOUSE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 9.3 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | MIDSHIP SECTION |
09-Apr-2026 | 1 | |
| 9.4 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | SKEG CONSTRUCTION |
09-Apr-2026 | 1 | |
| 9.5 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | SUPERSTRUCTURE CONSTRUCTION |
09-Apr-2026 | 1 | |
| 9.6 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | WELDING SCHEDULE |
09-Apr-2026 | 1 | |
| 9.7 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | BULKHEAD SECTION |
09-Apr-2026 | 1 | |
| 9.8 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | N.D.T. PLAN |
09-Apr-2026 | 1 | |
| 9.9 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 9.10 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | FIRE INSULATION PLAN |
09-Apr-2026 | 1 | |
| 9.11 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | CONSTRUCTION PROFILE |
09-Apr-2026 | 1 | |
| 9.12 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | TOWING & BOLDER CONSTRUCTION |
09-Apr-2026 | 1 | |
| 9.13 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | SHELL EXPANSION |
09-Apr-2026 | 1 | |
| 9.14 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | RUDDER & RUDDER STOCK |
09-Apr-2026 | 1 | |
| 9.15 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | FORE PEAK CONSTRUCTION |
09-Apr-2026 | 1 | |
| 9.16 | 97-LL/4/2026 |
YUDA 12 (FINAL) 2601030022 |
TUG BOAT | ENGINE FOUNDATION |
09-Apr-2026 | 1 | |
| 10 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON |
Multiple Items (6 Gambar) |
09-Apr-2026 | 6 | |
| 10.1 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON | SKEG CONSTRUCTION |
09-Apr-2026 | 1 | |
| 10.2 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON | MAN HOLE FLUSH TYPE |
09-Apr-2026 | 1 | |
| 10.3 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON | TOWING SMITH BRACKET |
09-Apr-2026 | 1 | |
| 10.4 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON | XRAY PLAN |
09-Apr-2026 | 1 | |
| 10.5 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON | SIDEBOARD |
09-Apr-2026 | 1 | |
| 10.6 | 89-LL/4/2026 |
SARANA MARINE 18 2401050022 |
PONTOON | MAN HOLE NON FLUSH TYPE |
09-Apr-2026 | 1 | |
| 11 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE |
Multiple Items (10 Gambar) |
10-Apr-2026 | 10 | |
| 11.1 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | AFTER PEAK CONSTRUCTION |
10-Apr-2026 | 1 | |
| 11.2 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | FORE PEAK CONSTRUCTION |
10-Apr-2026 | 1 | |
| 11.3 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | DECK HOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 11.4 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | SHELL EXPANSION |
10-Apr-2026 | 1 | |
| 11.5 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | MIDSHIP SECTION |
10-Apr-2026 | 1 | |
| 11.6 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | TRANSVERSE BULKHEAD |
10-Apr-2026 | 1 | |
| 11.7 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | PROFILE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 11.8 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | DECK AND BOTTOM CONSTRUCTION |
10-Apr-2026 | 1 | |
| 11.9 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | |
| 11.10 | 110-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | ENGINE FOUNDATION |
10-Apr-2026 | 1 | |
| 12 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT |
Multiple Items (6 Gambar) |
13-Apr-2026 | 6 | |
| 12.1 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | RUDDER AND RUDDER STOCK |
13-Apr-2026 | 1 | |
| 12.2 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | AFTER AND FORE PEAK CONSTRUCTION |
13-Apr-2026 | 1 | |
| 12.3 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | TOWING HOOK CONSTRUCTION |
13-Apr-2026 | 1 | |
| 12.4 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | SKEG CONSTRUCTION |
13-Apr-2026 | 1 | |
| 12.5 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | ENGINE FOUNDATION |
13-Apr-2026 | 1 | |
| 12.6 | 146-LL/4/2026 |
CAHAYA RAJA 05 2302030406 |
TUG BOAT | SUPERSTRUCTURE AND DECKHOUSE CONSTRUCTION |
13-Apr-2026 | 1 | |
| 13 | 136-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE |
Multiple Items (2 Gambar) |
13-Apr-2026 | 2 | |
| 13.1 | 136-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | SKEG CONSTRUCTION |
13-Apr-2026 | 1 | |
| 13.2 | 136-LL/4/2026 |
PUTRA SAIJAAN 03 (PKBL) 2602070015 |
SELF PROP.OIL BARGE | RUDDER AND RUDDER STOCK |
13-Apr-2026 | 1 | |
| 14 | 191-LL/4/2026 |
PERMATA JAYA V 2502140096 |
OIL TANKER |
RUDDER BLADE AND RUDDER STOCK |
14-Apr-2026 | 1 | - |
| 15 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT |
Multiple Items (7 Gambar) |
17-Apr-2026 | 7 | |
| 15.1 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | PROFILE PLANS |
17-Apr-2026 | 1 | |
| 15.2 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | MAIN DECK AND BOTTOM PLAN |
17-Apr-2026 | 1 | |
| 15.3 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 15.4 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | FOREPEAK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 15.5 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 15.6 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | AFTERPEAK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 15.7 | 262-LL/4/2026 |
DEX STAR (FINAL) 2501030453 |
LANDING CRAFT | BULKHEAD CONSTRCTION |
17-Apr-2026 | 1 | |
| 16 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | |
| 16.1 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE | CONSTRUCTION PROFILE 2 OF 2 |
17-Apr-2026 | 1 | |
| 16.2 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 16.3 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 16.4 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE | ENGINE FOUNDATION |
17-Apr-2026 | 1 | |
| 16.5 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE | CONSTRUCTION PROFILE 1 OF 2 |
17-Apr-2026 | 1 | |
| 16.6 | 251-LL/4/2026 |
HORAS BANGUN PERSADA - 03 2602080023 |
DREDGER BARGE | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 17 | 243-LL/4/2026 |
GJ 201 2604120041 |
WORK BOAT |
ENGINE FOUNDATION |
17-Apr-2026 | 1 | - |
| 18 | 252-LL/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 18.1 | 252-LL/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 18.2 | 252-LL/4/2026 |
SAMUGARA 2502130001 |
TUG BOAT | SHELL EXPANSION |
17-Apr-2026 | 1 |
PENNI DIAN
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 114-SCBM/4/2026 |
H - 234 (FINAL) 2501021251 |
PONTOON |
INTACT STABILITY BOOKLET-H-234 |
16-Apr-2026 | 1 | - |
| 2 | 126-SCBM/4/2026 |
H - 033 (FINAL) 2601020220 |
PONTOON |
H-033 LINES PLAN |
20-Apr-2026 | 1 | - |
| 3 | 127-SCBM/4/2026 |
H - 035 (FINAL) 2601020221 |
PONTOON |
H-035 H-036 H-037 LINES PLAN |
20-Apr-2026 | 1 | - |
RAMRAY ANANDA AMIR
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 179-SC/4/2026 |
TTH134 (CAL 1211) 2501100029 |
TUG BOAT |
FINAL INTACT STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 2 | 123-SCBM/4/2026 |
HULL - 426 (FINAL) 2601020050 |
PONTOON |
PRELIMINARY INTACT STABILITY BOOKLET |
20-Apr-2026 | 1 | - |
SEFIA HELMINA, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL |
Multiple Items (6 Gambar) |
10-Mar-2026 | 6 | |
| 1.1 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL | BULKHEAD CONSTRUCTION |
10-Mar-2026 | 1 | |
| 1.2 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL | CONSTRUCTION PROFILE |
10-Mar-2026 | 1 | |
| 1.3 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL | GENERAL ARRANGEMENT |
10-Mar-2026 | 1 | |
| 1.4 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL | MIDSHIP SECTION |
10-Mar-2026 | 1 | |
| 1.5 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL | ENGINE FOUNDATION |
10-Mar-2026 | 1 | |
| 1.6 | 155-LL/3/2026 |
HANNA 77 2602120042 |
SUPPLY VESSEL | SHELL EXPANSION |
10-Mar-2026 | 1 | |
| 2 | 225-LL/3/2026 |
MGDI - 002 (FINAL) 2501020370 |
PASSENGER SHIP |
NDT PLAN (X-RAY PLAN) |
25-Mar-2026 | 1 | - |
| 3 | 226-LL/3/2026 |
MGDI - 003 (FINAL) 2501020369 |
PASSENGER SHIP |
NDT PLAN (X-RAY PLAN) |
25-Mar-2026 | 1 | - |
| 4 | 32-LL/4/2026 |
JOHAN FORTUNE 2604120047 |
GENERAL CARGO |
Multiple Items (2 Gambar) |
02-Apr-2026 | 2 | |
| 4.1 | 32-LL/4/2026 |
JOHAN FORTUNE 2604120047 |
GENERAL CARGO | GENERAL ARRANGEMENT 1-2 |
02-Apr-2026 | 1 | |
| 4.2 | 32-LL/4/2026 |
JOHAN FORTUNE 2604120047 |
GENERAL CARGO | GENERAL ARRANGEMENT 2-2 |
02-Apr-2026 | 1 | |
| 5 | 132-LL/4/2026 |
T - 2408 2401020719 |
TUG BOAT |
XRay Plan |
13-Apr-2026 | 1 | - |
| 6 | 131-LL/4/2026 |
T - 2407 2401020718 |
TUG BOAT |
XRay Plan |
13-Apr-2026 | 1 | - |
| 7 | 204-LL/4/2026 |
NUSANTARA PELANGI 101 2604130008 |
GENERAL CARGO |
Multiple Items (3 Gambar) |
15-Apr-2026 | 3 | |
| 7.1 | 204-LL/4/2026 |
NUSANTARA PELANGI 101 2604130008 |
GENERAL CARGO | CONSTRUCTION PROFILE |
15-Apr-2026 | 1 | |
| 7.2 | 204-LL/4/2026 |
NUSANTARA PELANGI 101 2604130008 |
GENERAL CARGO | FWD CRANE FOUNDATION |
15-Apr-2026 | 1 | |
| 7.3 | 204-LL/4/2026 |
NUSANTARA PELANGI 101 2604130008 |
GENERAL CARGO | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 8 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT |
Multiple Items (11 Gambar) |
16-Apr-2026 | 11 | |
| 8.1 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | RAMP DOOR |
16-Apr-2026 | 1 | |
| 8.2 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | CONSTRUCTION PROFILE |
16-Apr-2026 | 1 | |
| 8.3 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | ENGINE FOUNDATION |
16-Apr-2026 | 1 | |
| 8.4 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | MIDSHIP SECTION |
16-Apr-2026 | 1 | |
| 8.5 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | TRANSVERSE BULKHEADS |
16-Apr-2026 | 1 | |
| 8.6 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | SUPERSTRUCTURE AND DECKHOUSE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 8.7 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | SHELL EXPANSION |
16-Apr-2026 | 1 | |
| 8.8 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | GENERAL ARRANGEMENT |
16-Apr-2026 | 1 | |
| 8.9 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | SKEG CONSTRUCTION |
16-Apr-2026 | 1 | |
| 8.10 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | AFTER AND FORE PEAK CONSTRUCTION |
16-Apr-2026 | 1 | |
| 8.11 | 224-LL/4/2026 |
VARUNA JAYA 1 (PKBL NON TOC) 2602030156 |
LANDING CRAFT | RUDDER AND RUDDER STOCK |
16-Apr-2026 | 1 | |
| 9 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT |
Multiple Items (12 Gambar) |
16-Apr-2026 | 12 | |
| 9.1 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | PROFILE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 9.2 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | SKEG CONSTRUCTION |
16-Apr-2026 | 1 | |
| 9.3 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | AFTER SECTION AND BULKHEAD |
16-Apr-2026 | 1 | |
| 9.4 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | WHEEL HOUSE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 9.5 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | RAMPDOOR CONSTRUCTION |
16-Apr-2026 | 1 | |
| 9.6 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | SHELL EXPANSION |
16-Apr-2026 | 1 | |
| 9.7 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | SUPERSTRUCTURE |
16-Apr-2026 | 1 | |
| 9.8 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | ENGINE FOUNDATION |
16-Apr-2026 | 1 | |
| 9.9 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | FORWARD SECTION AND BULKHEAD |
16-Apr-2026 | 1 | |
| 9.10 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | GENERAL ARRANGEMENT |
16-Apr-2026 | 1 | |
| 9.11 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | RUDDER AND RUDDER STOCK |
16-Apr-2026 | 1 | |
| 9.12 | 219-LL/4/2026 |
PERKASA PRIMA 898 (FINAL) 2601030164 |
LANDING CRAFT | FORECASTLE DECK |
16-Apr-2026 | 1 | |
| 10 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE |
Multiple Items (11 Gambar) |
17-Apr-2026 | 11 | |
| 10.1 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 10.2 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | FOREPEAK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 10.3 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | PROFILE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 10.4 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | X - RAY PLAN |
17-Apr-2026 | 1 | |
| 10.5 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | MIDSHIP SECTION |
17-Apr-2026 | 1 | |
| 10.6 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | WHEELHOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 10.7 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | DECK AND BOTTOM CONSTRUCTION |
17-Apr-2026 | 1 | |
| 10.8 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | ENGINE FOUNDATION |
17-Apr-2026 | 1 | |
| 10.9 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 10.10 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | TRANSVERSE BULKHEAD |
17-Apr-2026 | 1 | |
| 10.11 | 256-LL/4/2026 |
KALUKU MAS (FINAL) 2601030075 |
SELF PROP.OIL BARGE | AFTERPEAK CONSTRUCTION |
17-Apr-2026 | 1 | |
| 11 | 278-LL/4/2026 |
TESCO ALEXANDER (DELIVERY) 2501010089 |
TUG BOAT |
Multiple Items (2 Gambar) |
17-Apr-2026 | 2 | |
| 11.1 | 278-LL/4/2026 |
TESCO ALEXANDER (DELIVERY) 2501010089 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
17-Apr-2026 | 1 | |
| 11.2 | 278-LL/4/2026 |
TESCO ALEXANDER (DELIVERY) 2501010089 |
TUG BOAT | SUPERSTRUCTURE AND DECKHOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 12 | 279-LL/4/2026 |
KTU - 1966 2401021183 |
PALM OIL BARGE |
GENERAL ARRANGEMENT-REV 0 |
17-Apr-2026 | 1 | - |
| 13 | 296-LL/4/2026 |
T - 2407 2401020718 |
TUG BOAT |
WELDING SCHEDULE 19M TUG |
20-Apr-2026 | 1 | - |
| 14 | 297-LL/4/2026 |
T - 2408 2401020719 |
TUG BOAT |
WELDING SCHEDULE 19M TUG |
20-Apr-2026 | 1 | - |
SONY ANGGARA, S.T., M.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 66-SCBM/4/2026 |
HULL - 403 (FINAL) 2601020090 |
TUG BOAT |
PRELIMINARY INTACT STABILTY REPORT |
08-Apr-2026 | 1 | - |
| 2 | 73-SCBM/4/2026 |
HULL - 332 (FINAL) 2501020508 |
TUG BOAT |
Final Intact Stability Booklet |
09-Apr-2026 | 1 | - |
| 3 | 75-SCBM/4/2026 |
ASP - 165 (FINAL) 2501020711 |
TUG BOAT |
STABILITY BOOKLET |
10-Apr-2026 | 1 | - |
| 4 | 76-SCBM/4/2026 |
ASP - 167 (FINAL) 2501020713 |
TUG BOAT |
STABILITY BOOKLET |
10-Apr-2026 | 1 | - |
| 5 | 79-SCBM/4/2026 |
HULL 055 2401020228 |
TUG BOAT |
FINAL STABILITY H055 FUSEA RIDER 2316 260407 141259 |
13-Apr-2026 | 1 | - |
| 6 | 123-SC/4/2026 |
BAHTERA PERKASA 8 EX. YI YUAN 168 2502160019 |
LANDING CRAFT |
BOTTOM DAMAGE STABILITY |
13-Apr-2026 | 1 | - |
| 7 | 96-SCBM/4/2026 |
HULL - 1379 (FINAL) 2501020645 |
TUG BOAT |
H1379-D02 R0 Final Stability Booklet |
13-Apr-2026 | 1 | - |
| 8 | 105-SCBM/4/2026 |
H - 550 (FINAL) 2501020813 |
CPO BARGE |
FINAL STABILITY BOOKLET |
14-Apr-2026 | 1 | - |
| 9 | 104-SCBM/4/2026 |
H - 571 (FINAL) 2601020306 |
OIL BARGE |
LINES PLAN |
14-Apr-2026 | 1 | - |
| 10 | 108-SCBM/4/2026 |
H - 966 (FINAL) 2601020268 |
SELF PROPELLED OIL/CHEMICAL BARGE |
LINES PLAN |
15-Apr-2026 | 1 | - |
| 11 | 110-SCBM/4/2026 |
HULL - 038 (FINAL) 2601020308 |
CHEMICAL BARGE |
LINES PLAN |
16-Apr-2026 | 1 | - |
| 12 | 109-SCBM/4/2026 |
HULL - 036 (FINAL) 2601020009 |
CPO BARGE |
CAPACITY PLAN |
16-Apr-2026 | 1 | - |
| 13 | 116-SCBM/4/2026 |
HULL - 339 2501020022 |
PONTOON |
STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 14 | 115-SCBM/4/2026 |
PS2 - 00043 (FINAL) 2501021422 |
PONTOON |
PS2-00043 H-005 R0 STABILITY BOOKLET PRELIMINARY |
17-Apr-2026 | 1 | - |
| 15 | 120-SCBM/4/2026 |
H - 550 (FINAL) 2501020813 |
CPO BARGE |
H-550-CAPACITY PLAN |
17-Apr-2026 | 1 | - |
| 16 | 119-SCBM/4/2026 |
KTU - 1938 2401020270 |
TUG BOAT |
FINAL INTACT STABILITY BOOKLET |
17-Apr-2026 | 1 | - |
| 17 | 122-SCBM/4/2026 |
HULL - 390 (FINAL) 2601020086 |
OIL/CHEMICAL BARGE |
TANK CAPACITY PLAN |
20-Apr-2026 | 1 | - |
SYAHRUL IRMANSYAH
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT |
Multiple Items (14 Gambar) |
10-Apr-2026 | 14 | |
| 1.1 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | TOWING HOOK DETAILS |
10-Apr-2026 | 1 | |
| 1.2 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | |
| 1.3 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | FUNNEL CONSTRUCTION |
10-Apr-2026 | 1 | |
| 1.4 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | DECK HOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 1.5 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | WHEELHOUSE CONSTRUCTION |
10-Apr-2026 | 1 | |
| 1.6 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | SHELL EXPANSION |
10-Apr-2026 | 1 | |
| 1.7 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | MAST LIGHT DETAIL |
10-Apr-2026 | 1 | |
| 1.8 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | ENGINE FOUNDATION |
10-Apr-2026 | 1 | |
| 1.9 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | BULKHEADS AND FRAME SECTION |
10-Apr-2026 | 1 | |
| 1.10 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | SKEG DETAILS |
10-Apr-2026 | 1 | |
| 1.11 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | ANCHOR WINDLASS SEATING |
10-Apr-2026 | 1 | |
| 1.12 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | STRUCTURAL PROFILE AND DECK |
10-Apr-2026 | 1 | |
| 1.13 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | FIRE DIVISION PLAN |
10-Apr-2026 | 1 | |
| 1.14 | 123-LL/4/2026 |
GS STAR 36 2502160003 |
TUG BOAT | RUDDER CONSTRUCTION |
10-Apr-2026 | 1 | |
| 2 | 122-LL/4/2026 |
SM-136 (FINAL) 2501120134 |
PONTOON |
GENERAL ARRANGEMENT |
10-Apr-2026 | 1 | - |
| 3 | 154-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT |
Multiple Items (5 Gambar) |
13-Apr-2026 | 5 | |
| 3.1 | 154-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | SCANTLING SECTION |
13-Apr-2026 | 1 | |
| 3.2 | 154-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | BULKHEAD AND SECTION - 1 |
13-Apr-2026 | 1 | |
| 3.3 | 154-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | BULKHEAD AND SECTION 2-2 |
13-Apr-2026 | 1 | |
| 3.4 | 154-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | PROFILE DECK AND BOTTOM PLAN |
13-Apr-2026 | 1 | |
| 3.5 | 154-LL/4/2026 |
SUNNY FORD 15 2602100014 |
TUG BOAT | DECKHOUSE CONSTRUCTION |
13-Apr-2026 | 1 | |
| 4 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT |
Multiple Items (18 Gambar) |
14-Apr-2026 | 18 | |
| 4.1 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | BULKHEAD SECTION |
14-Apr-2026 | 1 | |
| 4.2 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SKEG CONSTRUCTION |
14-Apr-2026 | 1 | |
| 4.3 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | DOORS AND WINDOWS ARRANGEMENT |
14-Apr-2026 | 1 | |
| 4.4 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SUPERSTRUCTURE |
14-Apr-2026 | 1 | |
| 4.5 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | GENERAL ARRANGEMENT |
14-Apr-2026 | 1 | |
| 4.6 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | NDT PLAN |
14-Apr-2026 | 1 | |
| 4.7 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | FIRE INSULATION PLAN |
14-Apr-2026 | 1 | |
| 4.8 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | WELDING SCHEDULE |
14-Apr-2026 | 1 | |
| 4.9 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | TOWING AND BOLDER CONSTRUCTION |
14-Apr-2026 | 1 | |
| 4.10 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | MIDSHIP SECTION |
14-Apr-2026 | 1 | |
| 4.11 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SHELL EXPANSION |
14-Apr-2026 | 1 | |
| 4.12 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | RUDDER AND RUDDER STOCK |
14-Apr-2026 | 1 | |
| 4.13 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 4.14 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | SEA CHEST CONSTRUCTION DETAIL |
14-Apr-2026 | 1 | |
| 4.15 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | ENGINE FOUNDATION |
14-Apr-2026 | 1 | |
| 4.16 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | CONSTRUCTION PROFILE |
14-Apr-2026 | 1 | |
| 4.17 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | FORE PEAK CONSTRUCTION |
14-Apr-2026 | 1 | |
| 4.18 | 172-LL/4/2026 |
YUDA 88 (FINAL) 2601030054 |
TUG BOAT | WHELLHOUSE CONSTRUCTION |
14-Apr-2026 | 1 | |
| 5 | 193-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT |
Multiple Items (2 Gambar) |
15-Apr-2026 | 2 | |
| 5.1 | 193-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | WELDING SCHEDULE |
15-Apr-2026 | 1 | |
| 5.2 | 193-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | RADIOGRAPHY PLAN |
15-Apr-2026 | 1 | |
| 6 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT |
Multiple Items (17 Gambar) |
16-Apr-2026 | 17 | |
| 6.1 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | DECK HOUSE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 6.2 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | STRUCTURAL FIRE PROTECTION |
16-Apr-2026 | 1 | |
| 6.3 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | FORE PEAK CONSTRUCTION |
16-Apr-2026 | 1 | |
| 6.4 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | TRANS BULKHEAD PLAN |
16-Apr-2026 | 1 | |
| 6.5 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | DECK CONSTRUCTION 1 OF 2 |
16-Apr-2026 | 1 | |
| 6.6 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | RUDDER AND RUDDER STOCK ASSEMBLY 2 OF 2 |
16-Apr-2026 | 1 | |
| 6.7 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | SHELL EXPANSION |
16-Apr-2026 | 1 | |
| 6.8 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | PRINCIPAL STRUCTURAL |
16-Apr-2026 | 1 | |
| 6.9 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | DOOR WINDOWS MANHOLE AND HATCH ARRANGEMENT |
16-Apr-2026 | 1 | |
| 6.10 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | TOWING HOOK TABLE DETAIL |
16-Apr-2026 | 1 | |
| 6.11 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | GENERAL ARRANGEMENT |
16-Apr-2026 | 1 | |
| 6.12 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | MAIN ENGINE GIRDER |
16-Apr-2026 | 1 | |
| 6.13 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | WHEEL HOUSE CONSTRUCTION |
16-Apr-2026 | 1 | |
| 6.14 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | AFTER PEAK CONSTRUCTION |
16-Apr-2026 | 1 | |
| 6.15 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | RUDDER AND RUDDER STOCK ASSEMBLY 1 OF 2 |
16-Apr-2026 | 1 | |
| 6.16 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | DECK CONSTRUCTION 2 OF 2 |
16-Apr-2026 | 1 | |
| 6.17 | 218-LL/4/2026 |
KAPUAS BAHARI VII 2602140004 |
TUG BOAT | SKEG CONSTRUCTION |
16-Apr-2026 | 1 | |
| 7 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON |
Multiple Items (6 Gambar) |
17-Apr-2026 | 6 | |
| 7.1 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON | GENERAL ARRANGEMENT |
17-Apr-2026 | 1 | |
| 7.2 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON | SKEG CONSTRUCTION |
17-Apr-2026 | 1 | |
| 7.3 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON | PROFILE PLAN |
17-Apr-2026 | 1 | |
| 7.4 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON | FRAME AND BULKHEAD PLAN |
17-Apr-2026 | 1 | |
| 7.5 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON | SHELL EXPANSION |
17-Apr-2026 | 1 | |
| 7.6 | 273-LL/4/2026 |
ASL-III 2602140033 |
PONTOON | DECK AND BOTTOM PLAN |
17-Apr-2026 | 1 | |
| 8 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT |
Multiple Items (9 Gambar) |
17-Apr-2026 | 9 | |
| 8.1 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | WHEEL HOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 8.2 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | ENGINE BED CONSTRUCTION |
17-Apr-2026 | 1 | |
| 8.3 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | KORT NOZZLE CONSTRUCTION & DETAILS |
17-Apr-2026 | 1 | |
| 8.4 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | SKEG CONSTRUCTION & DETAILS |
17-Apr-2026 | 1 | |
| 8.5 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | Y-BRACKET CONSTRUCTION & DETAILS |
17-Apr-2026 | 1 | |
| 8.6 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | DECK HOUSE CONSTRUCTION |
17-Apr-2026 | 1 | |
| 8.7 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | WINDOWS & SCUTTLE ARRANGEMENT |
17-Apr-2026 | 1 | |
| 8.8 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | WEATHER TIGHT DOOR ARRANGEMENT |
17-Apr-2026 | 1 | |
| 8.9 | 282-LL/4/2026 |
PHL - 179 (FINAL) 2601050012 |
TUG BOAT | MANHOLE & HATCH ARRANGEMENT |
17-Apr-2026 | 1 | |
| 9 | 293-LL/4/2026 |
HULL-048 (FINAL) 2501030308 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
TULUS SETIYAWAN W. K, S.T.
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 3-SN/4/2026 |
REVIEW SMK PT DAMAI LINTAS PERSADA 2620120044 |
SMK Manual - PT Damai Lintas Persada |
16-Apr-2026 | 1 | - | |
| 2 | 2-SN/4/2026 |
REVIEW SMK PACIFIC WAVE MANAGE 2620010131 |
SMK Manual - PT Pacific Wave Management |
16-Apr-2026 | 1 | - |
ZULFIKAR BISMA WICAKSANA
PIC Pemeriksa Engineer
| No | No. Distribusi | Obyek / Kontrak | Tipe Kapal | Nama Gambar | Tgl Dist | Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 1 | 75-LL/4/2026 |
KUNAWA 1 2604170005 |
MOORING BOAT |
Multiple Items (2 Gambar) |
07-Apr-2026 | 2 | |
| 1.1 | 75-LL/4/2026 |
KUNAWA 1 2604170005 |
MOORING BOAT | SPONSON ARRANGEMENT AND DETAIL |
07-Apr-2026 | 1 | |
| 1.2 | 75-LL/4/2026 |
KUNAWA 1 2604170005 |
MOORING BOAT | BULWARK AND RAILING |
07-Apr-2026 | 1 | |
| 2 | 125-LL/4/2026 |
TTH134 (CAL 1211) 2501100029 |
TUG BOAT |
WINDOW DRAWING |
10-Apr-2026 | 1 | - |
| 3 | 107-LL/4/2026 |
TTH135 (CAL 1215) 2501100030 |
TUG BOAT |
WINDOW DRAWING |
10-Apr-2026 | 1 | - |
| 4 | 143-LLBM/4/2026 |
TB - 207 (FINAL) 2501020869 |
TUG BOAT |
IWS TB 207 |
13-Apr-2026 | 1 | - |
| 5 | 148-LLBM/4/2026 |
PS1-00061 (FINAL) 2501021562 |
TUG BOAT |
RUDDER DETAIL |
13-Apr-2026 | 1 | - |
| 6 | 167-LL/4/2026 |
TTH131 (CAL 1209) 2501100031 |
TUG BOAT |
RUDDER CONSTRUCTION |
14-Apr-2026 | 1 | - |
| 7 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT |
Multiple Items (22 Gambar) |
15-Apr-2026 | 22 | |
| 7.1 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | FUNNEL CONSTRUCTION |
15-Apr-2026 | 1 | |
| 7.2 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SCANTLING SECTION |
15-Apr-2026 | 1 | |
| 7.3 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ENGINE GIRDER DETAIL |
15-Apr-2026 | 1 | |
| 7.4 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | TOWING HOOK PLATFORM DETAIL |
15-Apr-2026 | 1 | |
| 7.5 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | BHD AND FRAME SECTION -1 |
15-Apr-2026 | 1 | |
| 7.6 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | EQUIPMENT NUMBER CALCULATION |
15-Apr-2026 | 1 | |
| 7.7 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | WHEELHOUSE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 7.8 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | STRUCTURAL PROFILE AND DECK -2 |
15-Apr-2026 | 1 | |
| 7.9 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | CENTER SKEG CONSTRUCTION |
15-Apr-2026 | 1 | |
| 7.10 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | RUDDER CONSTRUCTION |
15-Apr-2026 | 1 | |
| 7.11 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | GENERAL ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.12 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ANCHOR POCKET AND HAWSE PIPE DETAIL |
15-Apr-2026 | 1 | |
| 7.13 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | MAST LIGHT DETAILS |
15-Apr-2026 | 1 | |
| 7.14 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | STRUCTURAL PROFILE AND DECK -1 |
15-Apr-2026 | 1 | |
| 7.15 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ANCHOR WINDLASS SEATING PLAN |
15-Apr-2026 | 1 | |
| 7.16 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | MOORING ARRANGEMENT |
15-Apr-2026 | 1 | |
| 7.17 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | SHELL EXPANSION PLAN |
15-Apr-2026 | 1 | |
| 7.18 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | ENGINE ROOM PORTABLE PANEL |
15-Apr-2026 | 1 | |
| 7.19 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | WELDING SCHEDULE |
15-Apr-2026 | 1 | |
| 7.20 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | BHD AND FRAME SECTION -2 |
15-Apr-2026 | 1 | |
| 7.21 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | FIRE PROTECTION PLAN |
15-Apr-2026 | 1 | |
| 7.22 | 205-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT | DECKHOUSE CONSTRUCTION |
15-Apr-2026 | 1 | |
| 8 | 206-LL/4/2026 |
CCS189/ CAPRICORN 128 2601100031 |
TUG BOAT |
WEATHER TIGHT HATCH LAYOUT AND DETAIL |
15-Apr-2026 | 1 | - |
| 9 | 160-LLBM/4/2026 |
SSM - XIII W (FINAL) 2501021265 |
TUG BOAT |
DOOR HATCH WINDOW AND SCUTTLE ARRANGEMENT |
15-Apr-2026 | 1 | - |
| 10 | 176-LLBM/4/2026 |
H - 1010 (FINAL) 2601020001 |
TUG BOAT |
GIM-1010FFE-01 Structural Insulation |
16-Apr-2026 | 1 | - |
| 11 | 178-LLBM/4/2026 |
MPS - 015 (FINAL) 2501020766 |
TUG BOAT |
MPS 015 FIRE INSULATOIN |
16-Apr-2026 | 1 | - |
| 12 | 180-LLBM/4/2026 |
MPS - 017 (FINAL) 2501020768 |
TUG BOAT |
MPS 017 FIRE INSULATION |
16-Apr-2026 | 1 | - |
| 13 | 175-LLBM/4/2026 |
HULL - 401 (FINAL) 2601020064 |
TUG BOAT |
H401 - PROFILE DECK 2 OF 2 |
16-Apr-2026 | 1 | - |
| 14 | 181-LLBM/4/2026 |
MPS - 021 (FINAL) 2501020871 |
TUG BOAT |
MPS 021 FIRE INSULATION |
16-Apr-2026 | 1 | - |
| 15 | 190-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT |
Multiple Items (5 Gambar) |
17-Apr-2026 | 5 | |
| 15.1 | 190-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | NDT PLAN 02 |
17-Apr-2026 | 1 | |
| 15.2 | 190-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | SKEG DETAIL |
17-Apr-2026 | 1 | |
| 15.3 | 190-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | ENGINE GIRDER DETAIL |
17-Apr-2026 | 1 | |
| 15.4 | 190-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | RUDDER CONSTRUCTION |
17-Apr-2026 | 1 | |
| 15.5 | 190-LLBM/4/2026 |
HULL - 428 (FINAL) 2601020048 |
TUG BOAT | NDT PLAN 01 |
17-Apr-2026 | 1 | |
| 16 | 194-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT |
Multiple Items (5 Gambar) |
17-Apr-2026 | 5 | |
| 16.1 | 194-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | NDT PLAN 02 |
17-Apr-2026 | 1 | |
| 16.2 | 194-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | SKEG DETAIL |
17-Apr-2026 | 1 | |
| 16.3 | 194-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | RUDDER CONSTRUCTION |
17-Apr-2026 | 1 | |
| 16.4 | 194-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | ENGINE GIRDER DETAIL |
17-Apr-2026 | 1 | |
| 16.5 | 194-LLBM/4/2026 |
HULL - 429 (FINAL) 2601020047 |
TUG BOAT | NDT PLAN 01 |
17-Apr-2026 | 1 | |
| 17 | 277-LL/4/2026 |
HULL - 056 (FINAL) 2501030517 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 18 | 280-LL/4/2026 |
TTH131 (CAL 1209) 2501100031 |
TUG BOAT |
ALUMINIUM BOLTED TYPE MARINE WINDOW |
17-Apr-2026 | 1 | - |
| 19 | 245-LL/4/2026 |
TTH134 (CAL 1211) 2501100029 |
TUG BOAT |
NDT LOCATION |
17-Apr-2026 | 1 | - |
| 20 | 196-LLBM/4/2026 |
PS1-00058 (FINAL) 2601020057 |
TUG BOAT |
RUDDER DETAIL |
17-Apr-2026 | 1 | - |
| 21 | 276-LL/4/2026 |
HULL - 054 (FINAL) 2501030510 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 22 | 274-LL/4/2026 |
HULL - 051 (FINAL) 2501030403 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 23 | 275-LL/4/2026 |
HULL - 052 (FINAL) 2501030402 |
TUG BOAT |
CORROSION PROTECTION CALCULATION AND PLAN |
17-Apr-2026 | 1 | - |
| 24 | 294-LL/4/2026 |
HULL-049 (FINAL) 2501030316 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 25 | 295-LL/4/2026 |
HULL-050 (FINAL) 2501030325 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 26 | 198-LLBM/4/2026 |
PS2-00048 (FINAL) 2501021561 |
PONTOON |
AFT CONSTRUCTION PLAN |
20-Apr-2026 | 1 | - |
| 27 | 299-LL/4/2026 |
HULL - 055 (FINAL) 2501030499 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |
| 28 | 298-LL/4/2026 |
HULL - 053 (FINAL) 2501030515 |
TUG BOAT |
CORROSION PROTECTION CALCULATION & PLAN |
20-Apr-2026 | 1 | - |